0 Westinghouse Electric Corporation Nuclear Components Division, Tampa Plant Docket No. 99900047/81-01 NOTICE OF NONCONFORMANCE Based on the results of an NRC inspection conducted on May 4-8,1981, it appears that certain of your activities were not conducted in accordance with NRC requirements as indicated below:
Criterion V of Appendix B to 10 CFR Part 50 states,
" Activities affecting quality shall be prescribed by documented instruc-tions, pocedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, pro-cedures, or drawings.
Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that imp;rtoat activities have been satisfactorily accomplished."
Nonconformances to these requirements are as follows:
A.
QA Program Manual Section 9.0, paragraph 9.3.3.5 states in part "...
cata on all welds made on Code Items, including test number... the filler metal used,... the identity of the welder performing the weld... is maintained by the QC Technician in a QC Weld Loq for each weld. These logs... serve as the basis for permanent weld history records. "
Contrary to the above, welding hui been performed on steam generators l
for Northeast Nuclear Energy Company's Millstone Nuclear Power Station, Unit 3 and Georgia Power Company's Alvin W. Vogtle, Jr., Nuclear Plant, l
Unit 1, in which the identity of the welder was not reco.-ded on the QC Weld Log and, either the wrong welder was identified cr the wrong I
electrode size and test number were recorded.
(See DetailsSection I, paragraph E.3.a.)
8.
QA Program Manual Section 9.0 paragraph 9.2 states in part, " Feeder Traveler and/or PHI are used to sequence individual manufacturing examinations, test and inspection during construction processes....
Space is provided on the Feeder Traveler /PMI documents for sign-off and date of operations by manufacturing and inspection personnel...
Sign-off of an operation indicates that it has been completed in accordance with applicable instructions."
Changes to Feeder Traveler /PMI are to be signed by Manufacturing i
Planning and Quality Assurance Engineers.
e108040510 810707 '
PDR OA999 EMVWEST 99900047 PDR i
\\
o Westinghouse Electric Corporation 2
Docket No. 99900047/81-01 Contrary to the above, completed operations had not been signed-off; operations had been signed-off >>hich had not been performed in accordance with Feeder Traveler requirements, and in-process welding was observed being performed which was not in accordance with Feeder Traveler require-rents. The requirements were not authorized to be changed as there were no signatures by Manufacturing Planning and Quality Assurance Engineers.
(See DetailsSection I, Paragaph F.3.a.).
--