ML20009G415

From kanterella
Jump to navigation Jump to search
Forwards LER 81-033/03L-0
Date released: 01/23/2020 Download: ML20009G415


LER 81-033/03L-0:on 810625,setpoint for Engineered Safeguard Sys Channel C Containment Pressure Was Found Out of Tolerance in Nonconservative Direction.Caused by Setpoint Drift.Setpoint Readjusted
ML20009G419
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/27/1981
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G419 (1)
Forwards LER 81-033/03L-0
ML20009G414
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/27/1981
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G414 (1)