Gnarga Pcner comp;iny 333 Pedmont Avenue A tla nt,1 G x;rg a 30308 Te!ephone 404 526-/020 f/aAng Ad1 ess
~
Post Offce Box 4545 A:Qnta Georg.a 30302 Georgia Power J. T. Beckham, Jr.
Wr e Pres 6 n! and General Manager Nudear Gervrat:en July 27,1981 co g
s 6!E.l13 s
9
..n
~
AUG O 31981> r Director of !!uclear Reactor Regulation
'9; 7
ll.S. Iluclear Regulatory Connission mmet p
11ashington, D. C. 20555 y
n
/
Col l,
HRC DOCKETS 50-321, 50-366 OPERATIllG LICEllSES DPR-57, HPF-5 EDilIll I. HATCll flUCLEAR PLAtlT UllITS 1, 2 IlUREG 0737 ITEM II.B.2 - POST ACCIDENT SHIELDING t
Gentlenen:
Your June 10, 1981 letter requested that the final post-accident plant shielding analysis and design be subnitted for review. Enclosed is that report.
It should be noted that this report is a revision of the previous submittal and engineering design which had been completed in 1980. That design was determined to be inpractical for inplenentation and the present re-analysis and design were developed for use.
If you require further infornation, please contact my office.
Yours very truly,
}
Y-J. T. Beckhan, Jr.
Vice President and General fianager fluclear Generation f
Enclosure llEB/eb Q