ML20009G211

From kanterella
Jump to navigation Jump to search
Forwards LER 81-035/01T-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009G211


LER 81-035/01T-0:on 810622,leakage Through Several Points in Recombiner Sys Resulted in 3-h Release Through Unit 3 Reactor Bldg Vent.Caused by Loss of Negative Pressure. Leak Points Isolated by Valve Closure or Pipe Capping
ML20009G217
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/06/1981
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20009G217 (1)
Forwards LER 81-035/01T-0.Detailed Event Analysis Encl
ML20009G210
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/06/1981
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20009G210 (4)