ML20009G169

From kanterella
Jump to navigation Jump to search
Forwards LER 81-021/03L-0
Date released: 01/23/2020 Download: ML20009G169


LER 81-021/03L-0:on 810606,overtemp-delta Temp Instrumentation Loop Trip Setpoint Failed to Meet Tolerance Requirements.Caused by Gain Potentiometer Being Out of Adjustment.Potentiometer Adjusted
ML20009G176
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G176 (1)
Forwards LER 81-021/03L-0
ML20009G168
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/01/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009G168 (1)