Confirms Plans to Discuss Excessive Number of ROs & Corrective Actions at 810811 Meeting in Region 3 Ofc in Glen Ellyn,Il.Draft marked-up Region 3 Manual Procedure 9924 Encl
ML20009F847
Person / Time
Site: University of Missouri-Columbia
Issue date: 07/27/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brugger R
MISSOURI, UNIV. OF, COLUMBIA, MO
References
NUDOCS 8108030099
Download: ML20009F847 (10)


Text

-

y g,.

f f:

g y

q July 27, 1981 D

Docket No. 50-186 gl g

q I

University of Missouri Q ' ff

'g ATTN:

Dr. Robert M. Brugger v

i T

JUL ' 2 ISg7g.

Director

~

Research Reactor C

u.,, De M l,, g g3 Facility 3-Research Park fy s

Columbia, MO 65201 jf y

Centlemen:

This confirms plans discussed between you and my staff to meet with your Dr. T. Colline and other members of your staff on August 11, 1981 at 1:00 p.m. (CDT) at the Region III office in Glen Ellyn, Illinois. The purpose of this meeting is to discuss the excessiva number of reportable events that have occurred this year, the corrective actions that were taken following these events and your management plans to prevent events of this type.

We will gladly discuss any questions you have concerning this matter.

Sincerely, R. F. Beishman, Acting Director Division of Resident and Project Inspection ec:

Dr. M. D. George, Vice President for Academic Affairs Dr. T. Collins, Associate Vice President for Academic Affairs DMB/ Document Control Desk (RIDS)

$[

I NR 99 810724

//

S t 05000186 PDR "I

..RI II..

.. RLII.,

..R RidavaylrL.

..En y.d..

He.id Man

  1. ^" > $./27/81 ggQ..

NRC FORM 318 t!O. 80l NRCM O24 0 OFFICIAL RECORD COPY

- 322 24

J DRAFT RP 9924 e

4

' REGION III MANUAL REGIONAL PROCEDURE 9924 PLACEMENT OF DOCUMENTS IN THE DOCUMENT CONTROL SYSTEM (DCS)

Scope l

The Document Management Branch, (DMB), Division of Technical Infor-mation and Document Control (TIDC) has established the Document Control System (DCS) to provide centralized control of NRC documents. This contrcl includes the placement of documents into the document storage and retrieval system (formerly TERA); the reproduction and distribution of designated documents within NRC; and the reproduction and distri-bution of designated documents to the local pdr, pdr and NSIC.

These procedures provide instructions for the placement of Region III documents in the DCS.

I Objective The purpose of this procedure is to assure that:

1.

ALL appropriate Region III documents are entered into the DCS, and 2.

ALL Region III documents to be processed through DCS are submitted in accordance with procedures established by the Document Manage-

Contact:

Dorothy Carroll Rev 7/20/81 L

7.

tent Brtnch, Division of Technical Information cnd Documsnt Control.

Procedures L

A.

Ceneral The Administrative Support Branch has overall responsibility for developing the procedures and guidelines for the placement of Region III documents in the DCS.

Region III will submit only originals of incoming documents and original inspection /investigati'on reports, and original signed concurrence copies of outgoing documents to DMB for processing in DCS.

(An " original signed concurrence copy" is one which bears the original concurrences and is handwritten to conform with the signed copy in the signature space.)

Submission of only originals will assure the best possible copy is available in DMB for reproduction and for microfilming and will eliminate the possibility of duplicating entries in DCS.

Should an " original" as described above not be available a copy may be processed as the " designated original" and placed in DCS. A

" designated original" is established by noting in the upper right

//

corner of the copy 'E 6 Designated Original -

/ Certified by (signature)

Supervisor Office Assistant Division

3-As a rule the documents submitted to DCS will not be returned; there-fore, a copy of each document submitted must be made and retained for the Region III files.

If the document is to be placed in the PDR, LPDR and /or NSIC, the document must be prepared showing this distributionfin the cc's.

how,.

.s ever, no distribution to LPDR, PDR or NSIC will be made directly from the P.egion III office.

Only one copy will be sent to DMB and distribution will ',e made by DMB.

L.

Placemen,t of Outgoing Docirments Inspection / Investigation Reports and Related Documentation Inspection / Investigation Reports a.

The original signed concurrence copy of the trat:smittal letter and the original copy of the report will be sent ;o DMB on a Form 20B. The Form 20B will be prepared showing the appropriate code taken from the distribution list, Attachment A to this l

procedure.

l t

l l

b.

Licensee Responses and Acknowledgment Letter l

The original signed concurrence copy of the acknowledgment letter and the original of the licensee response will be l

l sent to DMB on a Form 20B. The Form 20B will be prepared I

l showing the appropriate code taken from Attachment A to this I

procedure.

2.

_ Forms NRC 591 a.

Issued in the Field One legible copy of the NRC 591 will be sent to DME on a Form 20B.

The Fore 20"B will be prepared showing Code 4E.

No copies will be sent to IE:HQ.

b.

Mailed to Licensee from Region III Office (1) Clear NRC 591

/M0I 4 The original signed concurrence copy of the transmittal letter signed (by inspector) and one legible / copy of the NRC 591 will be sent to DMB on a Form 20B. The Form 20B will be prepared showing Code 4E.

No copies will be sent to IE:HQ.

(2) NRC 591 - Citing Violations In addition to the signature of the inspector the signature I

of the licensee or his representative is required on the NRC 591's citing violations; therefore, NRC 591's in.hese cases cannot be sent to DMB until the licensee has returned the signed form.

When the form has been rectived from the licensee, the original signed concurrence copy of the trasmittal letter and one legible signed copy of the NRC 591 will be sent to DMB on a Form 20B. The Form 20B will be prepared showing Code 4E.

No copies will be sent to IE.

5-e

    • 34 Expired License Correspondence The original sip:ied concurrence with notation "DCS" in upper right corner should be sent to DMB.

4.

State Liaison Officer Notification to Public Officials The original signed concurrence with notation "DCS" in upper right corner should be sent to DMB.

5.

Piemos to HQ Re Specific Licensees Memos regarding specific Licensees should be prepared" showing the docket or license number in the subject line. The original signed concurrence with license or docket number noted in upper right corner should be sent to DMB.

6.

Non-Docketed Documents Non-docketed documents may be placed in DCS.

Firm criteria for the identification of documents appropriate for placement in DC3 have not been developed. However, generally only documents of

" permanent, long lasting value" should be placed in the system; drafts, working papers and other documents of temporary value should not be placed in DCS.

. e The original signed concurrence (of any document identified as appropriate for placement in DCS) with notation "DCS" in upper right corner should be sent to DMB.

7.

News Relea ses Not sent to DMB.

8.

Enclosures / Attachments to Region III Documents Enclosures or attachments that are " stand alone" documents, that is, documents which have an addressee, author and dste and are themselves identifiable, must be chetked against the DCS terminal (TERA) to determine if the document is already on DCS.

If the document is on DCS, the DCS Ac.cessio; s Number (ANO) must be written on the enclosure / attachment before it is sent to DCS. If the enclosure / attachment is not on DCS, the original copy should be sent (Note: if the original is in hand it is unlikely the document

~

7-e is in DCS).

If the original is not available a " designated eriginal" must be sent.

NUREG's, Reg Guides and NRC formal publications should not be sent to DCS separately or as enclosures.

GeneralLicensekCorrespondence 9.

Not placed in DCS.

10. _ General Correspondence (Non-Docketed Administrative Correspondence)

This includes temporary delegations, personnel related material, drafts, and working papers - not placed in DCS.

(See paragraph #6 of this procedure).

11.

Public Affairs Office Correspondence i

Responses to requests from the public - not placed in DCS.

C.

Placement of Incoming Licensee Documents The originals of all incoming Licensee documents addressed to Region III must be submitted to DMB.

i 1.

Bulletin Responses The original incoming will be sent to DMB on a Form 20B. The Form 20B will be prepared showing the approerla:e ecde"taken frma Attachment A to this procedure.

.s..

2. The upper right corner of each incoming Licensee documenti listed below submitted for placement in DCS must be marked to identify the document as to type, i.e.,

Annual Reports Construction Deficiency 'eports (50.55(e))

R Effluent Periodic Environmental Monitoring Reports Environmental Events Incident Reports (includes LER's, AO's, & RO's)

  • Misadministrations (Part 35)

Operating Reports -(Annual, Semi-annual, 8 Monthly)

  • 0verexposure Reports (20.405)

Part 21 Report.

Reactor Startup Reports Safeguards Reports (73.71(c))

(identify 2.790 information)

Semiannual Reports

  • These reports frequently contain data which are subject to restrictions of the Privacy Act.

However, the original incoming unsanitized report should be forwarded to DMB for entering into the system intact. After entering the report into the s/ stem DM3 will send a copy of the report to IE:HQ. An IE:HQ designee (Ralph Meyer) will sanitize the report and send a copy of the sanitized report to DME and the region.

Attachment A l

l e

l L -. _,

. --~.

r

=

IE DISTRIBUTION FOR INSPECTION / INVESTIGATION REPORTS & DOCUMENTATION LETTERS 1.

REACTOR CONSTRUCTION & REACTOR OPERATIONS (INCLUDING PRE-DOCKETED INSPECTIONS) 1.a.

REACTORS UNDER CONSTRUCTION 1.b.

REACTORS OPERATING 2.

SAFEGUARDS CONTAINING 2.790(d) INFORMATION 2.a.

REACTORS UNDER CONSTRUCTION AND OPERATING 2.b.

BYPRODUCT, SOURCE MATERIAL & SNM (30, 40, 70 DOCKETS)

(Show license numbers on Part 30 and 40 Dockets) 2.c.

SNM FUEL FACILITIES - NON-MIXED FACILITIES 2.d.

SNM FUEL FACILITIES - MIXED FACILITIES HAVING NAVAL REACTOR CONTRACTS 2.e.

SNM FUEL FACILITIES - MIXED FACILITIES HAVING OTHER DOE CONTP. ACTS (Battelle only) 3.

SAFEGUARDS NOT CONTAINING 2.790(d) INFORMATION 3.a.

REACTORS UNDER CONSTRUCTION AND OPERATING 3.b.

BYPRODUCT & SOURCE MATERIAL (30 & 40 DOCKETS) SEM (70 DOCKETS) 3.c.

SNM cVEL FACILITIES - NON-MIXED FACILITIES 3.d.

SNM FUEL FACILITIES - MIXED FACILITIES HAVING NAVAL REACTOR CONTRACTS 3.e.

SNM FUEL FACILITIES - MIXED FACILITIES HAVING OTHER DOE CONTRACTS (Battelle only) 4.

RADIOLOGICAL & ENVIRONMENTAL 4.a.

REACTORS UNDER CONSTRUCTION 4.b.

REACTORS OPERATING-4.e.

MATERIALS 4.f.

FUELS - NON-MIXED FACILITIES (Purdue University and General Electric) 4.g.

FUELS - MIXED FACILITIES (Battelle only)

DISTRIBUTION OF BULLETIN REPLIES T-2-R (REACTORS)

T-2-FCM (FUELCYCLEANDMATERIALS)

T-2-S (SAFEGUARDS)

Attachment A RP 9924