Responds to to DOE Re Nuclear Power Plant Licensing & Standardization.Licensing Process Has Been Speeded Up
ML20009F771
Person / Time
Issue date: 06/22/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Webb Patricia Walker
DUKE UNIV., DURHAM, NC
References
NUDOCS 8107310579
Download: ML20009F771 (2)


Text

.

/lf h

$p q

Y Q

y

  1. G Q.

JUN 2 21981 h

I/ <b i,

~

/

1-Dr. W. D. Ualker, Chairman

'S <

JUL 2 91981

  • 31 Department of Physics 3

y,s., m an uouu s a Duke University 8**55 W 9

U Durham, North Carolina 27706

Dear Dr. Walker:

to Mr. Griffith of the Department of Energy forwarded your letter of March 11, 1991, in order that we could ccnsider and respond to your comments regarding nuclear power plant licensing and standardization.

The NRC is required by law to conduct a public hearing for the construction permit application and is required to offer the opportunity for a public hearing for the operating license application. A hearing on the operating license application is not required unless the pending licensing board admits a t least one valid contention proposed by intervenors. This process ensures that any information available from the pubite pertaining to the construction and operation of the plant will be addressed during the course of our review.

This process also provides the public with a means to better understand the relative safety of the plant.

In the usual case, the details of the specific plant safety features are not known until the operating license stage, with only general design criteria provided in the application for a construction permit.

We recognize that in some recent licensing proceedings there may be a significart impact on the plant startup schedules. Consequenkly, we are endeavorino to improve our licensing procedures to minimize this impact.

These im;vvements consist of a one-step review to identify and resolve the sign,ficant safety and environmental issues early in the licensing process an order to allow sufficient time for the hearings.

In addition, we are pursuing similar improvements for the hearing process itself.

With regard to your recommendation for standardization of nuclear plants, the NRC began a program to develop licensing procedures for " standard" designs in 1974 Subsequently, the NRC issued policy statements on the licensing provisions for standardization in 1977 and 1978. At the present time, all of the reactor manufactures offer standard nuclear steam supply systems and the majority of architect-engineering fires have standard designs for the balance-of-plant (i.e., ssupporting systems and structures).

g)

We are currently considering how we might modify our standardization l)p policy to further improve the licensing process. A copy of our current standardization policy is enclosed for your information.

j

[h(1f~

8107310579 810622 PDR MISC PDR oFDCEk SURNAMEf DATEf eme rcrm aie nc eonmcu o24o OFFICIAL RECORD COPY e usc#o mo-aam j

=o ng y

Dr. W. D. Walker We appreciate the time that you have taken to offer your thoughts and recommendations. Should you have any further comments or questions, please do not hesitate to contact us.

Sincerely.

Original signed by Darrell G. Eisenhut Darrell G. Eisenhut, Dlrector Division of Licensing

/g 9 nclosure:'ReN4W' /v h9ad gf E

f As Stated cc:

J. D. Griffith, DOE DISTRIBUTION:

Docket File Local, P.DR NRC PDR SSPR Reading w/ incoming H. Denton E. Case PPAS S. Hanauer D. Ross T. Mu rl ey B. Snyder R. Vollmer

0. Eisenhut R. Purple R. Tedesco is J. Roe D

J. Hel temes, AEnn jgj J. Miller 9y C. Grimes y-L. Tremper w/ incoming i gg7d E. Hughes

'g S. Cavanaugh (dPl-170) w/ incoming F. original yellow ticket Mg 0 ELD - McGuire Ap

& a.*D W ^

(V J

I 5/d /81 f

.DL:SSPB@... DL:SSPR M.;..

/Di:.. sj,... "

PR -

D

/L DQ y B

orric,p 4

.. ( f.........

SURNAME)

.CC r..i m e s./..c..c LT..r..e.m..p e. r...J,M.'l R.

. e s co..

.. R P.u r pl.e.......D E... n. h..u t..............

.....M..... A f...g.....

5/y/81 R1

.. /..fh/81 5/.)}./81

>/

.. g..........

S 8!

5 can) g s

OFFICIAL rtECORD COPY nac ronw aie no eoinacu o24o o umm isess2n2.

Cf E

U. S. NUCLEAR REGULATORY C0fMISSION h fuC e 9 I'

RECORDS FACILITIES AND SERVICES BRANCH 3/MfE// b,[/7E4///a[ ORGANIZATION:

N TO:

hk /5 NA/26' ROOM:

016 MAIL STOP:

042 FROM:

SUBJECT:

DOCUMENT REQUEST IN ORDER TO COMPLETE OUR FILES, CENTRAL FILES NEED THE FOLLOWING:

COMPLETE PACKAGE OF YELLOW FOR CENTRAL FILES ATTACHMENTS MENTIONED IN LETTER OTHER:

RETURN TO CENTRAL FILES, ROOM 016, MAIL STOP 042 THANKS

,/

,j/ u k {l/r NOU

' f ; /L

/.

/

(acf M, WL KJ (G d dwN. $ chba, O'_;' T

~

t

_ _ _ _ _,. -