_ _ _ _ _ _
'Af 912) 4ss-sooo 435 Sinth Avenue E"7" "
June 26, 1981 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Attn:
Boyce H. Grier, Regional Director Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 IE Inspection Report No. 81-11 Gentlemen:
In response to your letter of June 2, 1981, and in accordance with 10 CFR 2.201, the attached reply addresses the Notice of Violation which was included as Appendix A of the referenced Inspection Report.
The noted violation, which has been classified as a Severity Level V Violation, consisted of failure to perform an inspection in accordance with prepared procedures of the diesel engine driven fire pump within the allotted time frame.
We have reviewed the referenced inspection report for 10 CFR 2.790 information and none was identified.
If you have any questions concerning this response, please contact my office.
Very tr ly yours, J
. Carey Vice President, Nuclear Attachment cc:
Mr. D. A. Beckman, Resident Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 8107280347 810720
=
PDR ADOCK 05000334 0
,.J
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Reply to Notice of Violation Inspection No. 81-11 Letter Dated June 2, 1981 VIOLATION (Severity Level V; Supplement 1)
Description of Violation (81-11-02)
Technical Specification Section 4.7.14.1.2.C.1 states in part:
"At least once per 18 months,
. Subjecting the diesel to an inspection in accordance with procedures prepared.
Procedures MSP 33.01 and }$P 33.02 state in part:
"The purpose of this procedure is to ensure that the diesel fire pump has been subjected to an inspection in accordance with procedures prepared...
This procedure is required to be performed at least once every 6 months.
(MSP 33.01).
every 18 months.
." (MSP 33.02).
Contrary to the above, diesel engine driven fire pump maintenance based on the above procedures has not been performed by the licensee 4
during the past 18 months.
Discussion of Violation As was discussed with the inspector at the exit meeting, the }$Ps for the diesel engine driven fire pump had not been performed due to the unavailability of the redundant (motor driven) fire pump. Problems.
encountered with the motor fire pump had rendered it inoperable during the period from February 1980 until April 18, 1981.
Further, subsequent to the return to service of the motor driven fire pump, operating difficulties were experienced with one portable Jaeger fire pump.
It was undesirable during this period to remove the diesel fire pump from service for inspection.
Corrective Action Taken The diesel fire pump is currently declared inoperable and the diesel is undergoing a major overhaul.
The required inspections will be. performed prior to returning the pump to service.
Backup fire protection capability, as required by the Technical Specifications, is available for service.
Action Taken To Prevent Recurrence The inventory of spare parts has been evaluated for both motor and diesel pumps. Additional spare parts are being obtained to avoid long duration outages of fire pumps in the future.
The experience gained in the investigation and repair of the motor driven fire pump is expected to substantially reduce the downtime of this pump, thus permitting removal of the diesel fire pump from service to perform the required maintenance on its required schedule.
e Reply to Notice of Violation Inspection No. 81-11 Letter Dated June-2, 1981-Page 2 Date On Which Full Compliance Will Be Achieved The inspections required by MSP 33.01 and 33.02 will be performed prior to returning the diesel fire pump to service.
~
l COMMONWEALTH OF PENNSYLVANIA) sS:
COUNTY OF BEAVER On thi c14;/2 day of 8 //
before me
<&rl / 44keA xa, a Notaff Public in and for said Commonwealth
.and' County, personally appeated J. J. Carey, who being duly sworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.
f die b TY
[9&fuy N/h F1DfTH D. ANTHONY, Notery Public ine;r..rei s S> sseh, Bener t'-
8 ic.v Cs.toiwwu tapnes Lec. 32, #U
$