d E NGINE E RS DE SIG N E RS CONSTRUCTORS

,/ ', (jv ei n s s uiu.in c.

DIRECT DIAL E XT E NSIO N 121' ) 760 5450 s

July 21, 1981 9-

\\\\

h(i,.

United States L

Nuclear Regulatory Commission gTBM" Washington, D.C.

20555 Attention:

Mr.

J.

Spraul u.5a N*

g 1

Dear Mr.

J.

Spraul:

A f( T O

Per our telephone conversation on July 20, 1981, we herewith submitting a copy of the proposed changes to Amendment 5 which describes procurement at our regional offices.

Regarding your concern on QA we have also attached page 8 of cubsection 17.1.1.4 which states that the QA Department is responsible for surveillance and auditing of procurement at all G&H offices.

Thank you for your attention to this matter.

Very truly yours, GIBBS & HILL, INC.

N.N.

Keddis Manager, Quality Assurance NNK/ JET:rc Attachments I

lgh l

8107280344 810721

$DRADOCK 03000584 hI l

PDR 393 SEVENTH AVENUE NEW YORK.

N. Y 10C01 C ABLE: GlB B S HILL. N EW YORK

s.^

personnel assigned to staff a particular project and work as a team under the administrative respansibility of a

project manager.

All regional offices are headed by a Vice President-Ma' nager Regional Office.

These Vice Fresidents-Managers report to the Senior Vice President-Regional Operations, who in turn reports to the Executive Vice President.

All nuclear safety-related engineering and design activities at

[

the regional offices are headed by a Manager Nuclear Operations or a

Manager of Engineering, who reports to the Vice President-Manager Regional Office.

Project

Fanagers, Chief Engineers and design personnel report to the Manager, Nuclear Operations or Manager of Engineering.

.Each of their departments supply technical personnel assigned to staff a particular project and work as a team under tFe administrative responsibility of a

project manager.

Neu/ \\ ork oIISdC _

6

-Pnefs Procurement Department is headed by the Manager Purchasing I

who repccts to the Senior Vice President, New York Project Operations through the Assistant to the Senior Vice President. '$

The Manager Purchasing is responsible for the establishment and CorpoM 5

list of approved bidders for nuclear maintenance of a4 L

safety-related items and services; coordinates preparation of the Instructi on to Bidders and Terms and Conditions sections of the Amendment 5 June 1981 -

m.

e A

procurement document; and administers all purchasing.

and i

expediting aspects related to procurement functions.

---1> Sec. TOscrY k Construction activity within G&H is headed by-the Senior Vice President, Construction who reports directly. to the President.

However, for quality assurance related matters, the Senior Vice f

President, Construction, is accountable to the Executive Vice President.

This procedure is applicable to construction activities being performed as part of a G&H project.

i The G&H Senior Vice President, Construction is also the-3 President, of Dravo Utilities Constructors, Inc.

(DUCI),

a wholly-owned subsidiary of G&H.

The G&H QA Manager also serves as the DUCI QA Manager, thus maintaining uniformity ano control g

of the QA and Quality Control (QC) activities of both companies.

DUCI performs QC activities related to vendor shop surveillance services and construction-site functions as required by G&H.

In performing these services DUCI utilizes and is governed by those approved programs and procedures developed by G&H.

Although DUCI QC personnel repor; adminstratively to the DUCI Vice President, i

Administrative Services, who in turn reports to the President of DUCI, their technical direction comes from G&H QA.

The DUCI-organization is shown on Figure 17.1-2.

i l

The Senior Vice President, New York Project Operations; Senior b

Vice President, Regional Operations; Vice President, Consulting l

Engineering, Quality Assurance and New Technology; and Senior t

s

' Amendment 5 4

June 1981

)

~.

o :

10serY k e -

Procurement activities in the regional offices are headed by a Manager Purchasing who is responsible to the Vice President-Manager Regional Office.

The Managers Purchasing are responsible for coordinating preparation of Instructions to Bidders and Terms and conditions sections of the procurement document; administering all purchasing and expediting aspects related to procurement-functions and coordinating with the Manager Purchasing, New York Office the establishment and maintenance of the corporate list _of. approved bidders-for nuclear safety related items and services.

e i

t

~

t construction phases of at least one nuclear power plant.

The organization of the QA Department is shown on Figure 17.1-4.

The QA Department has four main functional responsibilities:

a.

to establish and approve QA and QC requirements and criteria; b.

to review engineering and design documents for procurement and construction to verify that all nuclear safety requirements have been incorporated; c.

to provide -surveillance of all QA activities in the New York and regional

offices, during the 5

engineering and design, procurement, and construction phases to determine that all on-line and specified independent design ve ri fication procedures and quality control procedures have, in fact been applied to all processes-engineering,

design, procurement, manufacture, fabrication, assembly, construction, erection, installation, and preparation for startup; and that all activities have been properly documented, whether at G&H facilities or at facilities of suppliers, constructors, and their subcontractors (to the extent of G&H contractual obligations to the Utility Owner); and d.

to audit at regular interv als, by examination and evaluation, the objective evidence provided by documentation accumulated internally and externally in the normal course-of the processes involved and during surveillance activities at G&H offices, at the supplier's facilities, and at 5

the nuclear plant site.

Audits are performed by the Gedi QA Department or by G&H Management, as aT plicable, in 'accordance with written procedures and checklists to verify compliance with g

i Amendment 5 June 1981

.~.

~.

.-