Category:CORRESPONDENCE-LETTERS
MONTHYEARML20082L8221983-11-21021 November 1983 Forwards QA Program Topical Rept Gibsar 17A,Amend 7 Per 831019 Acceptance Ltr & Vendor Program Branch Rept.Rept Withheld ML20024E9321983-08-31031 August 1983 Forwards Draft Amend 7 to Gibsar 17-A, QA Program. ML20027C7131982-10-25025 October 1982 Forwards QA Program,Topical Rept Gibsar 17-A,Amend 6 ML20011A8831981-10-28028 October 1981 Forwards Amend 5 to QA Program Topical Rept GIBSAR-17-A & 810812 Acceptance Ltr Per 810812 Request.Amend Incorporates Organization Changes Accepted by 810901 Ltr ML20009E6641981-07-21021 July 1981 Forwards Proposed Changes to Amend 5 Describing Procurement at Regional Ofcs,In Response to 810720 Telcon ML19253C9891979-11-30030 November 1979 Forwards Verification Documents for in-house Computer Programs Sconv,Spectra,Quake & Time,In Support of Response to NRC Question 131.63 ML19253C8921979-11-30030 November 1979 Forwards Amend 15 to Gibbsar ML20049A1801979-04-0202 April 1979 QA Program Rept GIBSAR.17A Is Applicable to Gibbs & Hill Std Plant.Forwards Procedures for Establishing Project ML19289D8511979-03-0909 March 1979 Forwards Amend 10 to Gibbsar ML19269C7261979-02-0707 February 1979 Forwards Amend 9 to Balance of Plant Standard SAR Re RESAR-414.Amend Includes Responses to NRC Questions ML19308A1871978-12-27027 December 1978 Forwards Copy of Suppl to Amend 8 to Gibbssar,The Gibbs & Hill Inc Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Incl Info Incorp in Response to NRC Question 010.64 & 311.19 ML20147D1891978-12-15015 December 1978 Forwards Amend 8 to Gibbssar Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Requested Main Steam Line Break Analyses Have Been Incl in Section 6.2.1.1. Amend Incl Responses to Various Branch Questions ML20147C7771978-12-0707 December 1978 Forwards Rev Gibbsar Review Sched & Pda Extension Review Matters. Items Incl:Design Conformity & Safety Matters ML20148H1771978-11-0303 November 1978 Forwards Request for Addl Info of Round 2 Questions That Is Req for Completion of Review.Requests Response to Sections W/Notation RSP by 781215 ML20148F3471978-10-30030 October 1978 Forwards Request for Addl Info by 781215 Re Environ Qual of Safety Related Equip Including Elec Containment & Cables, Pressure & Level Transmitters,Containment Isolation Valves, Containment Mass & Energy Releases & ESF Components ML20197B5591978-10-30030 October 1978 Response to 780815 Hutchison Ltr & 780823 Prieto Ltr. Thorough Review of Gibbssar'S Pda Covered All Specific Concerns Identified by the Encl Questions of First Availability & Relative Scheduling ML20197B5781978-08-23023 August 1978 Forwards from Hutchison to HR Denton Re Appl for Preliminary Design Approval for Facil ML20197B5871978-08-15015 August 1978 Comments Re 780809 Meeting with Applicant Re Pda. Dissapointed W/Low Priority Given Applicant.Requests Meeting to Discuss NRC Priorities 1983-08-31
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20082L8221983-11-21021 November 1983 Forwards QA Program Topical Rept Gibsar 17A,Amend 7 Per 831019 Acceptance Ltr & Vendor Program Branch Rept.Rept Withheld ML20024E9321983-08-31031 August 1983 Forwards Draft Amend 7 to Gibsar 17-A, QA Program. ML20027C7131982-10-25025 October 1982 Forwards QA Program,Topical Rept Gibsar 17-A,Amend 6 ML20011A8831981-10-28028 October 1981 Forwards Amend 5 to QA Program Topical Rept GIBSAR-17-A & 810812 Acceptance Ltr Per 810812 Request.Amend Incorporates Organization Changes Accepted by 810901 Ltr ML20009E6641981-07-21021 July 1981 Forwards Proposed Changes to Amend 5 Describing Procurement at Regional Ofcs,In Response to 810720 Telcon ML19253C9891979-11-30030 November 1979 Forwards Verification Documents for in-house Computer Programs Sconv,Spectra,Quake & Time,In Support of Response to NRC Question 131.63 ML19253C8921979-11-30030 November 1979 Forwards Amend 15 to Gibbsar ML20049A1801979-04-0202 April 1979 QA Program Rept GIBSAR.17A Is Applicable to Gibbs & Hill Std Plant.Forwards Procedures for Establishing Project ML19289D8511979-03-0909 March 1979 Forwards Amend 10 to Gibbsar ML19269C7261979-02-0707 February 1979 Forwards Amend 9 to Balance of Plant Standard SAR Re RESAR-414.Amend Includes Responses to NRC Questions ML19308A1871978-12-27027 December 1978 Forwards Copy of Suppl to Amend 8 to Gibbssar,The Gibbs & Hill Inc Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Incl Info Incorp in Response to NRC Question 010.64 & 311.19 ML20147D1891978-12-15015 December 1978 Forwards Amend 8 to Gibbssar Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Requested Main Steam Line Break Analyses Have Been Incl in Section 6.2.1.1. Amend Incl Responses to Various Branch Questions ML20197B5781978-08-23023 August 1978 Forwards from Hutchison to HR Denton Re Appl for Preliminary Design Approval for Facil ML20197B5871978-08-15015 August 1978 Comments Re 780809 Meeting with Applicant Re Pda. Dissapointed W/Low Priority Given Applicant.Requests Meeting to Discuss NRC Priorities 1983-08-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20082L8221983-11-21021 November 1983 Forwards QA Program Topical Rept Gibsar 17A,Amend 7 Per 831019 Acceptance Ltr & Vendor Program Branch Rept.Rept Withheld ML20024E9321983-08-31031 August 1983 Forwards Draft Amend 7 to Gibsar 17-A, QA Program. ML20027C7131982-10-25025 October 1982 Forwards QA Program,Topical Rept Gibsar 17-A,Amend 6 ML20011A8831981-10-28028 October 1981 Forwards Amend 5 to QA Program Topical Rept GIBSAR-17-A & 810812 Acceptance Ltr Per 810812 Request.Amend Incorporates Organization Changes Accepted by 810901 Ltr ML20009E6641981-07-21021 July 1981 Forwards Proposed Changes to Amend 5 Describing Procurement at Regional Ofcs,In Response to 810720 Telcon ML19253C9891979-11-30030 November 1979 Forwards Verification Documents for in-house Computer Programs Sconv,Spectra,Quake & Time,In Support of Response to NRC Question 131.63 ML19253C8921979-11-30030 November 1979 Forwards Amend 15 to Gibbsar ML20049A1801979-04-0202 April 1979 QA Program Rept GIBSAR.17A Is Applicable to Gibbs & Hill Std Plant.Forwards Procedures for Establishing Project ML19289D8511979-03-0909 March 1979 Forwards Amend 10 to Gibbsar ML19269C7261979-02-0707 February 1979 Forwards Amend 9 to Balance of Plant Standard SAR Re RESAR-414.Amend Includes Responses to NRC Questions ML19308A1871978-12-27027 December 1978 Forwards Copy of Suppl to Amend 8 to Gibbssar,The Gibbs & Hill Inc Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Incl Info Incorp in Response to NRC Question 010.64 & 311.19 ML20147D1891978-12-15015 December 1978 Forwards Amend 8 to Gibbssar Balance of Plant Standard Safety Analysis Rept Referencing RESAR-414.Requested Main Steam Line Break Analyses Have Been Incl in Section 6.2.1.1. Amend Incl Responses to Various Branch Questions ML20197B5781978-08-23023 August 1978 Forwards from Hutchison to HR Denton Re Appl for Preliminary Design Approval for Facil ML20197B5871978-08-15015 August 1978 Comments Re 780809 Meeting with Applicant Re Pda. Dissapointed W/Low Priority Given Applicant.Requests Meeting to Discuss NRC Priorities 1983-08-31
[Table view] |
Text
. .
d ei n s s uiu.in c.
E NGINE E RS DE SIG N E RS CONSTRUCTORS
,/ ', (jv DIRECT DIAL E XT E NSIO N 121's ) 760 5450 July 21, 1981 9-United States \\
Nuclear Regulatory Commission - h(i,. L Washington, D.C. 20555 gTBM" Attention: Mr. J. Spraul g u.5a N*
1
Dear Mr. J. Spraul:
A f( TO Per our telephone conversation on July 20, 1981, we herewith submitting a copy of the proposed changes to Amendment 5 which describes procurement at our regional offices. Regarding your concern on QA we have also attached page 8 of cubsection 17.1.1.4 which states that the QA Department is responsible for surveillance and auditing of procurement at all G&H offices. Thank you for your attention to this matter.
Very truly yours, GIBBS & HILL, INC.
N.N. Keddis Manager, Quality Assurance NNK/ JET:rc Attachments I lgh l
8107280344 810721 l
$DRADOCK 03000584 PDR hI 393 SEVENTH AVENUE NEW YORK. N. Y 10C01 C ABLE: GlB B S HILL. N EW YORK
s.^
personnel assigned to staff a particular project and work as a team under the administrative respansibility of a project manager.
All regional offices are headed by a Vice President-Ma' nager Regional Office. These Vice Fresidents-Managers report to the Senior Vice President-Regional Operations, who in turn reports to the Executive Vice President.
All nuclear safety-related engineering and design activities at [
the regional offices are headed by a Manager Nuclear Operations or a Manager of Engineering, who reports to the Vice President-Manager Regional Office. Project Fanagers, Chief Engineers and design personnel report to the Manager, Nuclear Operations or Manager of Engineering. .Each of their departments supply technical personnel assigned to staff a particular project and work as a team under tFe administrative responsibility of a project manager.
Neu/ \6ork oIISdC _
-Pnefs Procurement Department is headed by the Manager Purchasing I
who repccts to the Senior Vice President, New York Project Operations through the Assistant to the Senior Vice President. '$
The Manager Purchasing is responsible for the establishment and 5 CorpoM bidders for nuclear maintenance of a4 list of approved L
safety-related items and services; coordinates preparation of the Instructi on to Bidders and Terms and Conditions sections of the Amendment 5 June 1981 -
. __ __ _ _ _ __.. _. m.
e .
A procurement document; and administers all purchasing. and i
expediting aspects related to procurement functions.
---1> Sec. TOscrY k ,
Construction activity within G&H is headed by-the Senior Vice
- President, Construction who reports directly. to the President.
However, for quality assurance related matters, the Senior Vice f President, Construction, is accountable to the Executive Vice President. This procedure is applicable to construction activities being performed as part of a G&H project.
i The G&H Senior Vice President, Construction is also the- 3 President, of Dravo Utilities Constructors, Inc. (DUCI), a wholly-owned subsidiary of G&H. The G&H QA Manager also serves as the DUCI QA Manager, thus maintaining uniformity ano control g of the QA and Quality Control (QC) activities of both companies.
DUCI performs QC activities related to vendor shop surveillance services and construction-site functions as required by G&H. In performing these services DUCI utilizes and is governed by those approved programs and procedures developed by G&H. Although DUCI
- QC personnel repor; adminstratively to the DUCI Vice President, i Administrative Services, who in turn reports to the President of ,
DUCI, their technical direction comes from G&H QA. The DUCI-
% organization is shown on Figure 17.1-2. .
i l The Senior Vice President, New York Project Operations; Senior Vice President, Regional Operations; Vice President, Consulting b Engineering, Quality Assurance and New Technology; and Senior l
t s
Amendment 5 4 June 1981
)
_, _ . . ~. _ . . _ . _
o :
e -
10serY k Procurement activities in the regional offices are headed by a Manager Purchasing who is responsible to the Vice President-Manager Regional Office. The Managers Purchasing are responsible for coordinating preparation of Instructions to Bidders and Terms and conditions sections of the procurement document; administering all purchasing and expediting aspects related to procurement-functions and coordinating with the Manager Purchasing, New York Office the establishment and maintenance of the corporate list _of. approved bidders-for nuclear safety related items and services.
e i
t
' ~
t construction phases of at least one nuclear power plant.
The organization of the QA Department is shown on Figure 17.1-4.
The QA Department has four main functional responsibilities:
- a. to establish and approve QA and QC requirements and criteria;
- b. to review engineering and design documents for procurement and construction to verify that all nuclear safety requirements have been incorporated; c. to provide -surveillance of all QA activities in the New York and regional offices, during the 5 engineering and design, procurement, and construction phases to determine that all on-line and specified independent design ve ri fication procedures and quality control procedures have, in fact been applied to all processes-engineering, design, procurement, manufacture, fabrication, assembly, construction, erection, installation, and preparation for startup; and that all activities have been properly documented, whether at G&H facilities or at facilities of suppliers, constructors, and their subcontractors (to the extent of G&H contractual obligations to the Utility Owner); and d. to audit at regular interv als, by examination and evaluation, the objective evidence provided by documentation accumulated internally and externally in the normal course- of the processes involved and during surveillance activities at G&H offices, at the supplier's facilities, and at 5 the nuclear plant site. Audits are performed by the Gedi QA Department or by G&H Management, as aT plicable, in 'accordance g with written procedures and checklists to verify compliance with i
Amendment 5 June 1981