ML20009E525
| ML20009E525 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/10/1981 |
| From: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Haist D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, GO2-81-F-0135, GO2-81-F-135, NUDOCS 8107280279 | |
| Download: ML20009E525 (1) | |
Text
-
Docket No.
50-397 FOR DCS PROCESSING Original docump)nt,qot availpble to NRC Certifiedby,/./L6 M /C Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372 5000 D t
June 10,1981
'- IF!
G02-81-F-0135 gur 15 I031 h U.S. Nuclear Regulatory Commission JfEcNb Region V
'd escacc4us j-Suite 202 Walnut Creek Plaza frp"y i'
1990 North California Boulevard Walnut Creek, California 94596 Attention:
Mr. Dennis Haist Gentlemen:
Subject:
SUPPLY SYSTEM NUCLEAR PROJECT N0. 2 P0TENTIALLY REPORTABLE DEFICIENCY 10CFR50.55(e) CONDITION WNP-2-89 SPECIAL DOOR AND HATCHES
References:
Letter G02-80-292 The final report for 50.55(e) condition #89 was due on May 31, 1981.
Per phone conversation of June 3,1981, between Mr. Richard Spence ard Mr.
Robert Dodds (NRC), we request an extension on the deadline to September 7, 1981.
Contractor commitments on documentation and procedure conditions have not been met on schedule as outlined in Management Corrective Action Request #1449.
The Supply System will make every effort to expedite this deficiency to a satisfactory resolution.
If you have any questions, please contact Susan Noordhoff, (509) 377-2501 extension 2721.
Very truly yours, N'
R. G. Matlock t-op RGM/SN/kh Program Director, Wf g
g; cc: WS Chin BPA ND Lewis 3
TA Mangelsdorf-Bechtel C
JUL 2 7198lm RC Root-B&R Site v$
% =, *3 1 v.s RE Snaith-B&R NY i
l AD Toth-NRC Resident Inspector
'k'j p
@M V Stello-NRC 4
l E Wood
'Q1-J* hi T
1 43 0 L
8107280279 810610 DR ADOCK 05000
(
Al-IIS'