{{#Wiki_filter:> JUL 21 W Illinois Department of Nuclear Safety ATTN: Mr. Gary N. Wright Deputy Director-1035 Outer Park Drive, 5th Floor Springfield, IL 62704 Gentlemen: The enclosed IE Circular No. 81-12 titled " Inadequate Periodic Test Procedure of PWR Protection System" was sent to the licensees listed below on July 22, 1981: American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316) g D Cincinnati Gas and Electric Company s Zimmer (50-358)~ sg,) s Cleveland Electric Illuminating Company 0,ghg7 s Perry 1, 2 (50-440, 50-441) C 9 Commonwealth Edison Company-Braidwood 1, 2 (50-456, 50-457) +* O 9' h h Byron 1, 2 - (50-454, 50-455) - N/s/b/ t %c97 Dresden 1, 2, 3 (50-10, 50-237, 50-249) / LaSalle 1, 2 (50-373, 50-374) Quad-Cities 1, 2 (50-254, 50-265) Zion 1, 2 (50-295, 50-304) Consumers Power Company Big Rock Point (50-155) Palisades (50-255) Midl.ind 1, 2 (50-329, 50-330) Dairyland Power Cooperative g 4,' - D LACBWR (50-409) h% \\
- \\
t Detroit Edison Company Fermi 2 (50-341) _[ e ?bE'N8***ejiyjy PDR
4 Illinois Department of Nuclear Safety Illinois Power Company Clinton 1, 2 (50-461, 50-462) Iowa Electric' Light & Power Company Duane Arnold (50-331) Northern Indiana Public Service Company Bailly (50-367) Northern States Power Company Monticello (50-263) Prairie Island 1, 2 (50-282, 50-306) Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547) Toledo Edison Company Davis-Besse 1 (50-346) Union Electric Company Callaway 1, 2 (50-483, 50-486)- Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301) Wisconsin Public Service Corporation Kewaunee (50-305) Sincerely, g Dorothy E. Carrol Chief Word Processing and De ument Control Section
Enclosure:
IE Circular No. 81-12 cc w/ encl: Mr. D. W. Kane, Sargent & Lundy J. G. Keppler, RIII Acting Division Directors, RIII P. R. Wohld, RIII RIII 7/22/81 . -, -, -. -. - ~,.. - - -
SSINS No.: 6830 5" inn No. : [8103300406 itG 81-12 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 July 22, 1981 IE Circular No. 81-12: INADEQUATE PERIODIC TEST PROCEDURE OF PWR PROTECTION SYSTEM Description of Circumstances: i On November 30, 1980, ground isolation procedures were being carried out to locate an electrical ground in the 125V dc bus No. 1 at the St. Lucie Nuclear Pcwer Plant. Part of the procedure requires deerergizing the dc control power f to the reactor trip circuit breakers (TCBs). These breakers are designed to trip (fail-safe mode) on undervoltage upon loss of de control power. Referring to Figure 1, the four TCBs (TCB 1,3,5, and 7) that are supplied control power from dc bus No. 1 did not trip immediately (because of binding) on undervoltage when control power was deenergized. lne operators did verify that the shunt trip for each of the four TCBs was functioning. Operators also verified that the redundant TCBs from dc bus No. 2 (TCB 2,4,6, and 8) tripped on similar undervoltage conditions, and, in fact, inadvertently caused a plant trip while testing. Investigation into the problem by the licensee identified the cause of failure as an out-of-adjustment condition in the linkage mechanism of the undervoltage trip device. This adjustment problem, together with the lack of cleaning and periodic relubricating of the trip shaft mechanism, is the subject of IE Bulletin 79-09 which was issued April 17, 1979. While shutdown, the undervoltage trip mechanism on each of the above four faulty TCBs was adjusted and verified to operate satisfactorily. Investigation by the licensee revealed that the reactor protection system (RPS) periodic test procedure in use at the time did not verify the trip function of the undervoltage trip coil independent of the shunt trip coil. Referring to l Figure 1, it can be seen that during a reactor trip test at this f acility, these coils operate simultaneously causing the trip opening of the associated l TCBs. This arrangement of the RPS and the trip test procedure may be similar for other PWRs. l BWRs may use similar circuit breakers in safety systems; therefore, similar l inaequacies in their circuit breaker test procedures may exist. i Following adjustment of the linkage mechanism of the undervoltage trip device the licensee instituted a revised surveillance test procedure to check the under-voltage and shunt trip devices independently and to insure proper breaker operation. Although not shown in Figure 1, the undervoltage trip coil and the shunt trip coil are separately fused so that test procedure changes resolved the problem at St. Lucie. l ~ pu PE l
IEC 81-12 July 22, 1981 Page 2 of 2 Recommended Action for Holders of Operating Licenses and Construction Permits: It is recommended that holders of operating licenses and construction permits review for applicability the specific items presented in the " Description of Circumstances." It is further recommended that the procedure for surveillance testing of trip circuit breakers be reviewed and revised as necessary to provide independent testing of each trip function, including position verification to ensure that the breaker actually trips. If the trip circuit breakers do not have provisions for independent testing of each trip function, including position verification, then appropriate modifi-cations should be made to include such features (e.g., local pushbuttons for the shunt and undervoltage trip coils, separately fused circuits for the shunt and undervoltage trip coils, etc). No written response to this circular is required. If you need additional information with regard to this subject, please contact the director of the appropriate NRC Regional Office. Attachments: 1. Figure 1 2. Recently issued IE Circulars l I l
2 "s T N E u j a 'q 1-M S J U R c t C t v NI o e5 l 5 u o VN .._ [_ 4 2 E d. D +1 0I." P TS q' P f .4._ ' 2 U{ u l 7d 5 I u 1 A r S S 61 Es T S UI 1 Mm L C TVD 44 4 4 r.c 5 d. E 4 I 8C C0D I R E A 3 "c T.g N AA D8C r Lr 4 d_ N w CG s f u 3l A Lc 2llO OM r c u R 1 A'l d; q ]. p' s c T c Nu V f, s ~ E 0n 6' 2 c 0o i 33'C0D I 1 q 333 6 I _,7 _.___ 0 GC l +L T AA 00C N ] 3 L gi_ l.. W f D 0]'C E J=_ 7: J D U n Nf M I t L. - 7} cT r 1 f r 6 d. S oS 3 ,p: ] 2 G_ .,j g! L-VN 2 5 d_ i ~ E4 O 3 I z c" f ) p eS e 4 [ir ? L" - j j; IA sVU s 31f i s T A 0I U 0D n_ ( i _. J(t d 3 .eu f 1VD n S l I a. m 2[ 4 R l_ I . C m W m I d, iC O l T E n e_ 6 A I g c,o _ )a T r l 6 tf N +( E _A g. O c_ N I - s r F E 4 r N O m uc j C l. C g;._d a.T ( n P Y i o T S C _( O n_ l T 8 M N 3 _ 7 4 r 1 E o Sj , 4" ,9 g; m.i W c" ) l U V E _4 _ 1 R U _9 ) c 0O 3 ,i. T C eS 8 2 "5 h I VN 4
- g.,,l/-{E G
0 2 O 0I 4L 2 L" 9 .h 0{ f. .E 1 A .r 5 Nf) 0 F c [- 0s r.I 1v0 22 22 d A }* y R j~I 0C DO V t-5 - ( l? AA BC 7{" Y# 6J,1 i ' l t 5 f,UU4 T 1 4 f, U 3JI f T- _y A M j['C 2] O ~ _ w {. s GC'ICOo I I} A E I I l G [ U" L } _uj R M AA DC T 4 T N G E C E ._ v,e. jH' . y A T M A U S 3 S f I R I f _ p. 1_ c T T D Y f eS A Nf VN P S 1 A I N 1( 4 ' y L 0I. I A RjA 2t" P 7f A E S R T 6[L ,S OI U T TVB k N i N V 5 d, E 4 l I 4 f, N C , e OE T I w , n I i L t2 e T HC A G r 3 h, I O c , i r C TE 2 f_ IC e"r lf B u N T I A FO A f =n g U OR i i F F S P Y S A d R S L S E E S N E R O I T C F T MN I X C I ( I R R L A OE S T T RMS T A A P FEL I RE N M N E SUN U M R TSN C C P I I I UAA I G G pef R O O f S N MO T L L I ,-l ,:l l I l11l \\
IEC 81-12 July 22, 1981 RECENTLY ISSUED IE CIRCULARS Circular Date of No. Subject Issue Issued to 81-10 Steam Voiding in the Reactor 7/2/81 All power reactor Coolant System During Decay facilities with an Heat Removal Cooldown OL and CP 81-09 Containment Effluent Water 7/10/81 All power reactor That Bypasses Radioactivity facilities with an Monitor OL or CP 81-08 Foundation Materials 5/29/81 All power reactor facilities with an OL or CP 81-07 Control of Radioactively 5/14/81 All power reactor Contaminated Material facilities with an OL or CP 81-06 Potential Deficiency Affecting 4/14/81 All power reactor Certain Foxboro 20 to 50 facilities with an Milliampere Transmitters OL or CP 81-05 Self-Aligning Rod End Bushings 3/31/81 All power reactor for Pipe Supports facilities with an OL or CP 81-04 The Role of Shift Technical 4/30/81 All power reactor Advisors and Importance of facilities with an Reporting Operational Events OL or near-term OL 81-03 Inoperable Seismic Monitoring 3/2/81 All power reactor Instrumentation facilities with an OL or CP 81-02 Performance of NRC-Licensed 2/9/81 All power reactor Individuals While on Duty facilities (research & test) with an'0L or CP OL = Operating Licenses CP = Construction Permit}}