ML20009E121
| ML20009E121 | |
| Person / Time | |
|---|---|
| Site: | 07000734 |
| Issue date: | 06/05/1981 |
| From: | Mowry W EMVGA, GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER |
| To: | Mccorkle G NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| 19236, NUDOCS 8107270135 | |
| Download: ML20009E121 (3) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l 4, s
.[N wg T'll"' h
[St2J t
a e--~,
, -. - _. _ _ _. _. ~ ~ ~ ~
9 W T T T38f fM
~
=
W SS GENERAL ATOMIC CoM W!LSfW ON
~
00',LT ctER4
!O P O. DOX 81608
'(/
\\ '.'-~-
In Rep 1Y J
SAN DIEGO. C/ LIFORNIA 9.
/ '; 'f Refer To: 696-2077
/
m4sss-aooo e 5, 1981 p M
U N
.aCD,3 JUN y' %hucza]hefGut40ay
' 00/
Mr. G. W. McCorklc, Chief 3
coup
}
Physical Security Licensing Branch T
U.S. Nuclear Regulatory Commission A >.4 Washington, D.C. 20555 k
%ter, 57
Subject:
Docket 70-734, SNM-696; Informacica i,&-
rt.
Dear Mr. McCorkle:
Pursuant to our earlier commitnent, we herewith transmit a brief status re-port on the major items key to the implementation of the upgrade rule plan.
The information is as follows:
1.
PA BARRIER - HIGH BAY AREA Dem711 tion, removal, and relocation work continues of piping, utilities, and equioment which is required prior to start of construction. (Job is 1% complete) 2.
WEST VAULT Demolition, removal, and relocat n of utilities and interfer-ing facilities and equipment is complete. Excavation and soil compaction is complete, and drilling for the caisson piles is underway.
(Job is 7% complete) 3.
CAS Demolition, removal, and relocation of utilities and interfer-ing facilities and equipment is complete. Excavation for ground beams and foundations is complete.
(Job is 5% complete) 4.
PA - EECP Demolition, re2 oval, and relccation of utilities and interfering facilities and equipment is complete. Excavation and soil com-paction is complete, and drilling for the caisson piles is com-plete.
Installation of reinforcing steel is in progress.
(Job is 5% complete)
LT
~
11 3
8107270135 810605 l
{DRADOCK 07000734 19238 PDR
,3 G. W. McCorkle 696-2077 5.
CENERAL Rearrangement and relocation of fuel fabrication equipment and facilities is underway. The Emergency Generator, balanced mag-netic switches, emergency doors, bullet resistant doors, attack-resistant door, and interior microwave detectors are all on order.
Design of the intrusion alarm and CCTV systems continues.
De-sign is underway of other facilities and structures made neces-sary by the upgrade but located outside the PA.
About 50% of the budgeted funds have been spent or committed.
We hope this information is helpful. Should you have any questions, please contact me at (714) 455-2823.
Very truly yours, 0
E h/
William R. Mowry Licensing Administrator Nuclear 1bterials Control Division WRM:hes cc: Lcroy Norderhaug, Chief Safeguards Branch Region V, NRC
Docket No.
~76 - 73 Y
" SAFEGUARDS AMENDMLNTS" t1C !
SG #
William 0. Miller License Fee Management Branch NCL4 Office of Administration PSL(_
MATERIALS SAFEGUARDS AMENDMENT CLASSIFICATION Applicant Mb License No:
S/t) M-6 M Fee Category:
Application Dated:
/s /5!f/
4,/9/P/
Received:
Applicant's Fee Classification:
(
The above application for ams.'dment has been reviewed by the NMSS' Division of Safeguards in accordance with Section 170.31 of Part 170 and is classified as follows:
1.
Safeguard amendments to licenses in fee Categories l A through 1H (a)
Major Safeguards (b)
!!inor Safeguards (c)
Safeguards (Categories 1D thruagh 1G only)
~
(d)
Administrative 2.
Justification for reclassification:
3.
The application was filed (a) pursuant to written !!RC request and the amendment is being issued for the convenience of the Commission, or (b)