Responds to NRC Re Deviation & Violations Noted in IE Insp Repts 50-321/81-09 & 50-366/81-09.Corrective Actions:Procedures Established Requiring Monthly Operability Testing of Scram Discharge Vol Vent & Drain Valves
ML20009D894
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/19/1981
From: Beckham J
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009D885 List:
References
NUDOCS 8107240473
Download: ML20009D894 (2)


Text

I

.$/M N b 7 OFFICIAL COPY P2 42 ^.d2L OfQ mn

< s w m:a June 19, 1981 P

e

.2525 Wa oey:a 3C 22 Georgia Power

~.

~~

Power Generation Department U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement REFEREtCE:

Region II - Suite 3100 RII: RCL 101 Marietta Street, FM 50-321/50-366 Atlanta, Georgia 30303 Inspection Report 81-09 ATTENTION:

Mr. James P. O'Reilly Gentlemen:

The following responds to the tbtice of Deviation, Appendix B to your May 14, 1981 letter containing Inspection Reports 50-321/81-09 and 50-366/81-09.

Appendix A,

Notice of Violation, was responded to by our letter of June 8,1981.

Deviation On June 12, 1980, the NRC issued I&E Bulletin 80-14, Degradation of BWR Scram Discharge Volume Capability, which required in paragraph A3 that procedures be implemented to assure that, through periodic testing, the Scram Discharge Volume (SDV) vent and drain velves are periodically t ested.

The licensee response dated July 25, 1980, stated that thcse valves would be tested monthly.

Contrary to the above, no procedural requirement nor documentation exists which shows that these valves are periodically tested as stated.

This is a Deviation and is applicable to Units 1 and 2.

Response

Corrective actions that have been or will be taken:

Originally, Standing Order 80-42 was issued to imolement the GPC commitment to I&E Bulletin 80-14.

This Order failed to demonstrate compliance to cur commitment;

thus, orocedures HNP-1-3017 and HrP-2-3017 were implemented.

These procedures require monthly operability testing of the SDV vent and drain valves, and recording of the closure time observed for each valve.

The recuired surveillance was performed on u tch Units 2 and 1,

June 6,

1981, and June 8,

1981, for Plant s

respectively.

Corrective actions which will oe taken to avoid further deviations:

The above procedures were placed on the monthly surveillance program on June 5, 1981.

This program, normally used for Technical Specification required surveillance, will track the recuirement and ensure that it is met in the future.

Date when corrective actions will be completed:

No further actions are necessary to be in compliance.

8107240473 810707 PDR ADOCK 05000321 0

PDR

k Georgia Power n U. S. tAJclear Regulatory Commission Office of Inspection and Enforcement l

Region II - Suite 3100 Page Two June 19, 1981 Please call this office if you require further information.

J. T. Beckham, Jr. states that he is Vice President of Georgi 7 Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEORCIA POWER COMPANY By:

O[

p J. T. Beckham, Jr.'

Sworn t and subscribed before me this 19th day of June,1981.

Nctary Public, Gecrgia. State at Large b'

Notary Public My Ccmmissien Exoites sect 20,1983 RES/mb xc:

M. Manry R. F.

Rogers, III

_ _ _ _ _ _ _ _