ML20009D790

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810710.Noncompliance Noted: Failure to Check Pocket Dosimeters for Response to Radiation Since 791120 Insp
ML20009D790
Person / Time
Issue date: 07/16/1981
From: Sreniawski D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20009D789 List:
References
NUDOCS 8107240348
Download: ML20009D790 (1)


Text

,

z, Appendix A NOTICE OF VIOLATION 4

Midstate Testing Laboratory.

License No. 13-11822-01

~ As a~ result'of the inspection conducted on July 10, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:

10 CFR 34.33(c) requires pocket dosimeters to be checked at periods not to exceed one year for corre,:t response to radiation.

Contrary to the above, a licensee representative stated pocket dosimeters have not been checked for correct response to radiation since the date of

'the last inspection on November 20, 1979.

- This is a Severity Level V violation (Supplement VII).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act-of 1954, as amended, this response shall be submitted under oath or affirmation. Consideration may be given to extending your response time _for good cause 7 /q/gf

/

Datpd' [

D. J. S eniawski, Chief Mate ia s Radiation Protection Sec ' n 2 8107240348 810716 NMS LIC30

' 13-11822-01 PDR

- -.