Georg:a Power Company
- 333 Permont Avenua OFFICIAL COPY Atlanta, Georgia 30308 p)ff[
/
Telephone 404 526-6526 Mading Address U3N3C 3E34
'~~
Post Office Box 4545
'W-
-~" ' ' '~
- Atlanta. Georg:a 30302 GeorgiaPower Obe85, b 6I 0 ~
~ sm-om,-
Power Generation Department United States Nuclear Regulatory Commission Office. of Inspection and Enforcement
REFERENCE:
Regien II - Suite 3100 RII: RCL 101 Marietta Street, NW 50-321/50-366 Atlanta, Georgia 30303 Inspection Report 81-11 Nonconformance Control ATTENTION:
Mr. J. P. O'Reilly Gentlemen:
The following is submitted in response to the Notice of Violation appended to your letter of May 12, 1981, which addressed I&E inspection Report 81-11:
Statement of Violation, The measure established to control Nonconformances, Procedure No.
HNP-801, "Nonconformance" does not reouire the cause of significant conditions (nonconformance) adverse to quality to be determined.
The cause of significant conditions (nonconformances) adverse to quality is not being documented.
Response
1.
Admission or denial of the alleged violation:
The violation occurred and is admitted.
2.
The reasons for the violation, if admitted:
Although procedure HNP-425 " Deviation Report" contains a statement regarding the cause of the condition, procedure HNP-801 "Nonconformance Report" does not document the same information.
3.
The corrective steps which have been ta on arn the results achieved:
Correction of conditions leading to this violation requires revision of procedures.
As stated in item 4 below, action has been taken toward revising the procedure in question.
4.
Corrective steps which will be taken to avoid further violations:
Procedure HNP-801 is being reviewed for revision to include resolution of the alleged violation.
This procedure is being reviewed with procedure HNP-425 to determine if the two procedures can be combined, encompassing all of the concerns addressed by the two individual procedures in one procedure.
8107240341 810710 PDR ADOCK 05000321 C)
+
GeorgiaPower A United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II l
Atlanta, Georgh 30303 June 5, 1981 Page Two 5.
The date when full compliance will be achieved: Procedt're re,'.sions and necessary revisions will be completed by August 1,1981.
J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is aut'.orized to exccute this oath on behalf o' Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
l1 *>
GEORGIA POWER COMPANY t
b By:
c --
J. T. Beckham, Jr.
Sworn to and-subscribed before me this 5th day of June,1981.
5 ~
(U Notary Public RDB/mb Notary Public Georgia, State at Large My Commason Expres Sept.20,1983 xc:
M. Manry R. F. Rogers, III 4
9 ea,
.n----
,~,,.m
--n.
~-.
OFFICIAL COPY n
h f
a UNITED STATES
['
y NUCLEAR REGULATORY COMMISSION g,
_s REGION 11 g
'f 101 MARIETTA ST.. N.W., SUITE 3100 P
ATLANTA, G EoRGI A 30303 MAY 121981 Georgia Power Company ATTN:
J. H. Miller, Jr.
Executive Vice President 270 Peachtree Street Atlanta, GA 30303 Gentlemen:
Subject:
Report Nos. 50-321/81-11 and 50-366/81-11 This refers to the special safety inspection conducted by Mr. J. J. Lenahan of this office on April 20-22, 1981, of activities authorized by NRC Ocerating License Nos. OPR-52 and NPF-5 for the Hatch facility. Our praliminary findings were discussed with Mr. M. Manry, Plant Manager at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license appear to violate NRC requirements.
This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified enforcement matters and unresolved items. The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed 16 the NRC Public Document Room. If this report contains any information that you believe to be proprietary, it is necenary that you make a written application within 20 days to this office to withhold such information from public disclosure. p.ny such application must include the basis for. claiming that the information is proprietary and the proprietary information should be contained in a separate part cf the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
BIDD 70>sf
o NY 121981 Georgia Power Company 2
Should you have any questinns concerning this letter, we will be glad to discuss them with you.
Sincerely,
- n. u.G # I tor Division of,hesident and Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
-2.
Inspection Report Nos. 50-321/81-11 and 50-366/81-11 cc w/ encl:
W. A. Widner, Vice President and General Manager-Nuclear Generation M. Manry, Plant Manager C. E. Belflower, Site QA Supervisor 4
APPENDIX A NOTICE OF VIOLATION Georgia Power Company Docket Nos. 50-321 and 366 Hatch 1 and 2 License Nos. DPR-57 & NPF-5 As a result of the inspection conducted on April 20-22, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.
10 CFR 50, Appendix B, Criterion XVI, as implemented by Section 16 of the Plant Hatch Quality Assurance Manual, requires in part " Measures shall be established to assure that conditions adverse to quality such as failures, malfunctions,... and nonconformances are promptly identified and corrected.
In the case of significant conditions, adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition. The identification of the significant condition adverse to quality, the cause of the condition, shall be documented, and....."
Contrary to the above, the measure established to control Nonconformances, Procedure No. HNP-801, "Nonconformance" does not require the cause of significant conditions (nonconformance) adverse to quality to be determined.
The cause of significant conditions (nonconformances) adverse to quality is not being documented.
This is a Severity Level V Violation (Supplement I.E.).
Pursuant to.the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written state-ment or explanation in reply, including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of
-1954, as amended, this response shall be submitted under oath or affirmation.
lblY 12 561 Date:
& 8/05'>303r8
[
o UNITED STATES 8"
y3 NUCLEAR REGULATORY COMMISSION 5
/ E REGION 11 e,
101 MARiETTA ST., N.W., SUITE 3100 ATLANTA, GECMGIA 30303 j
Report Nos. 50-321/81-11 and 50-366/81-11 Licensee:
Georgia Power Company 270 Peachtree Street Atlanta, GA 30303 Facility Name:
Hatch Nuclear Plant Docket Nos. 50-321 and 50-366 License Nos. OPR-57 and NPF-5 Inspection at Hatch Site near Baxley, Georgia Inspector:
's&%N) fer 5/ 7/0l J.f.Lenahan Cate Signed
~
Approved by:
Me e
f f /
T. E. Conlon, Section Chief Date Signed Engineering Inspection Branch Engineering and Technical Inspection Division
SUMMARY
Inspected on April 20-22, 1981 Areas Inspected This special, announced inspection involved 16 inspector-hours en site in the areas of licensee action on previous inspection findings, licensee 'dentified items, and nonconformance control.
Results Of the three areas inspected, no violations or deviations were ideltified in two areas; one violation was found in one area (Inadequate nonconformance procedure -
paragraph 5.b.)
SIO D '7O M /
t
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- C.. E.- Belflower, QA Site Supervisor
- M. Manry, Plant Manager
- D. A.' McCusker, QC Supervisor
- R. M. Herrington, Senior'QC Specialist J. -Rearden, Junior Engineer
- R. Houston, QA Field Representative R. Baker, Licensing Engineer (Telephone Conversation)
Other Organizations
- L~. G. Byrnes, Geotechnical Engineer, Law Engineering E. Beall, Geotechnical Engineer, Law Engineering W. C. Orr, Civil Engineer, Southern Company Services (Telephone Conversation)
NRC Resident Inspector R. Rogers
- Attended exit interview 2.
Exit Interview The inspection ~ scope and findings were summarized on April 22, 1981 with those person,s-indicated in paragraph 1 above. The violation described in paragraph 5. was discussed.
3.
_ Licensee Action on Previous Inspection Findings
-a.
(0 pen) Violation Item 321/80-48-02 and 50-366/80-48-02:
Failure to Initiate a Nonconformance Report and Failure to Obtain Approval Prior to Implementing a Change to a DCR.
(1) -Failure to - Initiate a Nonconformance Report - The inspector reviewed nonconformance report (NCR) numbers80-177 and 80-179 which document the nonconforming conditions concerning the damaged protective coating on the service water lines and the welding of angle iron supports anto one of the 18" diameter RHR lines.
The inspector reviewed the NCR log listing NCRs written against the
1 2
l 1
backfill repair program.
Based on review of the above NCRs and the NCR log, the inspector concluded that procedure HNP-801, "Nonconformances" is being implemented by personnel involved with the intake backfill repair.
(2) Failure to Obtain Approval Prior to Implementing a Change to a DCR - Tne inspector reviewed Revision 8 to procedure number HNP-809 " Plant Madifications - Approved and Implementation" which was written as part of the corrective action involving failure to follow procedures _ in implementing a change to a design change request (DCR) prior to its approval by the plant review board (PRB). The revised procedure does not require approval by the PRB of changes to DCRs which do not alter the scope of the DCR or invalidate the approved safety evaluation of a DCR.
Based on a review of HNP-809 (Revision 8) and discussions with site personnel, the inspector concluded that the licensee's corrective actions stated in their letter dated March 9, 1981 to NRC Region II were not clear.
Subsequent to the inspection, on April 29, 1981, the inspector discussed this problem with licensee personnel and requested a suppiemental response to clarify their corrective actions. This item remains open pending receipt of the licensee's supplemental response and further review by NRC Region II.
b.
(Closed) Unresolved Item 321/80-48-04 and 366/j80-48-04:
K-Krete QC Requirements. The inspector examined revisions to the Bechtel "Techni-cal Specification for Design, Construction and Backfilling of a Braced Excavation for the Intake Structure Service Water Piping and Utilities for E. I. Hatch Power Plant, Units 1 and 2" transmitted to the site by Bechtel letter dated March 31, 1981. These revisions specify the acceptance criteria for K-Krete to be a minimum unit weight of 120 pcf and a minimum 7-day unconfined compressive strength of 10 psi. All K-Krete placed to date meets these requirements.
The revisions also addtd requirements to specify the maximum elapsed time between batchir.g and placing of the K-Krete to be one and one-half hours, which is the same as for concrete.
This maximum batch criteria is what has been used for the project since placement of K-Krete was started. This item is closed.
c.
(Closed) Unresolved Item 321/81-02-01 and 366/81-02-01:
Deep Excava-
-tion Dewatering Procedure. The inspector examined Wellpoint Dewatering Corporation Drawing No. D-81-15 " Proposed Deepwell Dewatering System
and Wellpoint Dewatering Corporation Procedure " Dewatering-Intake Structure - Hatch Nuclear Plant".
The drawing and procedure address the layout of the dewatering system, well size (diameter) and depth, size and type pumping equipment, requirements for emergency pumping equipment (standby electrical system), the required system perform:nce, and the requirements for well discharge monitoring. Three observation h
e 3
wells have been installed to monitor the performance of the dewatering systea. Water level readings will be taken on these three wells, and on piezometers which was previously installed, on a daily basis by Law Engineering personnel. This item is closed.
d.
(Closed) Violation Item 321/81-02-02 and 366/81-02-02:
Failure to Establish Procedures for Control and Calibration of Testing Equipment Used to Perform Tests on K-Krete. The inspector reviewed the procedure for calibration of the Karol-Warner Model 1000 RP load ring used in testing of the K-Krete.
The inspector also examined the current calibration curve for the load ring.
A calibration sticker has been ettached to the load ring to indicate that calibration is current and the date when recalibration of the load ring is required. This item is closed.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection Effort a.
The inspector examined Procedure No. HNP-1-10947, " Repair of Backfill -
East Side of Unit' 1 Reactor Building". This procedure covers repair of backfill on the east side of the Unit I reactor building which was washed out when an 8-inch fire main broke. The problem is documented on Nanconformance Report No.81-209.
Tne. inspector examined work in progress to replace the eroded backfill. The area affected is approx-imately five feet wide by 100 feet long, with a maximum depth of six feet. The procedure specifies that K-Krete is to be used to replace the eroded backfill, b.
The inspector examined Procedure No. HNP-801, "Nonconformance".
Examination of this procedure disclosed the following violation; 10 CFR 50, Appendix B, Criterion XVI requires in part that measures be established to promptly identify and correct nonconformances, and in the case of significant conditions adverse to quality, that the cause of the nonconformance be determined. Criterion XVI also requires that the cause of significant nonconformances be documented and reportea to appropriate levels of management.
Contrary to these Criterion XVI requirements, after review of Procedure HNP-801, and several noncon-formances, and during discussions with quality control and quality assurance personnel, the inspector noted that procedure HNP-801 does not require the cause of significant conditions (nonconformances) adverse to quality to be determined, and that the causes of significant conditions (nonconformances) adverse to quality are not being docu-mented.
This was identified to the licensee as violation item 321/
81-11-01 and 366/81-11-01, " Inadequate nonconformance procedure".
No d?viations were identified.
4 6.
Licensee Identified Items
.a.
Settling of Fill Under Plant Service Water and RHR Service Water ?iping (LER 50-321/1980-062) - The inspector examined the deep excavation adjacent to the intake structure and installation of deep welb for dewatering the excavation. The loose backfill matertal under the plant service water and RHR service water piping adjacent to. the intake structure has been excavated to a depth of approximately elevation 62.
~ An additional 10 feet of material is to be removed prior to reaching firm foundation materials on which the K-Krete backfill is to be rlaced.
The removal of this material will be delayed until instal-lation of the dewatering system is completed and operating.
The inspector noted that the excavation, bracing of the excavation, temporary support of the RHR and service water piping, and deep well installation is in accordance with the project drawings and specifi-cations.
Excavation of the loose backfill under the RHR and service water lines and replacement of the backfill with K-Krete has been completed in the shallow excavation section of the intake backfill repair. The shallow section was approximately 80 feet long. The deep excavation section is approximately 20. feet long.
The inspector examined the following quality records relating to the intake backfill repair:
(1) Second shift QC inspection reports for February 28 through March 16, 1981, and for April 9 through April 16, 1981 (2) Records of settlement monitoring program performed on RHR and service water piping and on conduit ducts for period of March 6 through April 20, 1981 (3) Nonconformance Report No.81-205, 81-211,81-245 and 81-252 (4) Records of water level readings in observation wells for period of March 20 through April 6,1981 b.
Overstressed Masoning Walls (LER 50-321/1980-115) - Performance of the masonry wall design re-eva l ua ti on required by IE Bulletin 80-11 disclosed that nine walls had local stresses above the code allowable upon application of seismic loads.
The inspector eviewed Design Change Request (DCR) No. 81-10 which has been written to accomplish the modifications to.the nine walls. The design drawings showing details of the wall modifications have been completed. The materials required to complete the modifications have been purchased and have been received on site.
c.
Nonconservative Computer Program Used in Design Re-evaluation of Masonry Walls-(LER 50-321/1981-031) - The licensee notified Region II on April 16, 1981 that an additional masonry wall requires modification
e.
O 5
in order to meet seismic design requirement due to a lack of conserva-tism in the computer program used to perform the original IE Bulletin 80-11 masonry wall dasign re-evaluation. The IE Bulletin 80-11 design re-evaluation was performed for the licensee by Southern Services Company. The computer program used by Southern Services Company in the design re-evaluation was furnished by Bechtel. A recent review of the computer program disclosed that it contained an unconservative assump-tion in computation cf seismic loads acting on the walls. The program was modified and the masonry walls were reanalyzed using the revised version of the program.
This design re-analysis disclosed that one wall, in addition to the nine reported under LER 50-321/1980-115 ( see paragraph 6.b.,
above), had local stresses above the code allowable upon application of seismic stresses. This wall will be modified under DCR 81-10. The design drawings showing details of the wall modifica-tions have been completed.
No deviations or violations were identified.