f o
O consumers power i Pr su - Projects, Engineering and Construction can. ret offhes: 1945 West Pernall Road, Jackson, MI 49201 *(517) 788 0453 81-06 #1 July 16, 1981 h
.h * )f
/
Mr J G Keppler, Regional Director (t,
Office of Inspection & Enforcement g
d[
US Nuclear Regulatory Commission
~
Region III 799 Roosevelt Road LT JUL 2 31981
- 7)
~
Glen Ellyn, IL 60137 vo iaxuxe y ron s
MIDLAND FROJECT -
DOCKEIS NO 50-329 AND 50-330 g
'd REACTOR CAVITY COOLING SYSTEM M
FILE:
0.h.9.54 SERIAL:
120h7 This letter is an interim 50 55(e) report concerning operation of the Reactor Cavity Cooling System. On June 16, 1981, consumers Power reported by telephone call to Cecil Jones of USNRC Region III that a potentially reportable situation existed relative to this system. Further analysis has shown that the operating procedures must be revised to assure that the reactor operator can verify that the structural concrete is within the allowable temperature limits. The required procedural changes cannot be developed in detail until additional engineering analyses are completed.
Another report, either interim or final, vill be submitted on er before October 31, 1981.
s RCB/1r
/
CC: Director, Office of Inspection & Enforcement Att Mr Victor Stello, USNRC (15)
I 6>7 Director, Office of Management Information & Program Control, USNRC (1)
/
// O RJCook, USNRC Resident Inspector Midland Nuclear Plant (1) 1 '.g@
M 07240282 810716
~
PDR ADOCK 05000329 Q
S-PDR gp