ML20009D580

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept,Originally Reported on 810602,re Oversized Lugs in Internal Wiring on Ite Circuit Breakers. Caused by Operator Error Resulting in Improper Lug Size Selection.Oversized Lugs Will Be Replaced W/Proper Size Lug
ML20009D580
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/14/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, PLA-872, NUDOCS 8107240189
Download: ML20009D580 (4)


Text

. .s. :.

.: g,, cc 0h PP&L TWo NORTH NINTH STREET, ALLENTOWN, PA.18101 PHo N E: (215) 770-5151 NORMAN W. CURTIS Vice President Engineering & Construction-Nuclear 7745381 July 14, 1981 Mr. Boyce H. Grier Director, Region I f> g-U. S. Nuclear Regulatory Commission f qg c) 631 Park Avenue ,

f King of Prussia, PA 19406 UJ V ?g 3

O { JUL . 31981 s -

SUSQUEHANNA STEAM ELECTRIC STATION N "ciNEE$,)*" fl FINAL REPORT OF A DEFICIENCY INVOLVING OVERSIZED LUGS IN ITE BREAKERS h'f. .!

ERs 100450/100508 FILE 821-10 \, j. y' '

PLA-872

Dear Mr. Grier:

This letter serves to provide the Commission with a final report of a deficiency relating to the use of oversized lugs in internal wiring on ITE circuit breakers. The deficiency was the subject of NRC IE Information Notice #81-06 dated March 11, 1981. NRC Region I (Mr. L. Narrow) was advised by Mr. A. Sabol of PP&L that the subject deficiency was considered potentially reportable under 10 CFR 50.55(e) in a telephone conversation on June 2, 1981. The information contained in this report is submitted pursuant to the provisions of 10 CFR 50.55(e).

The attachment to this letter contains a description of the problem, its cause, safety implications and the corrective action taken and planned.

We trust the Commission will find _this information to be satisfactory.

Very truly yours,

,, t N. W. Curtis Vice President-Engineering & Construction-Nuclear pg FLW:sab /

/ //

. Attachment m

0107240189 s10714 PDR ADOCK 05000387 S PDR PE NN SYLV ANI A POWER & LIG H T COMP ANY

T

t. .. ,

Mr. Boyce H. Grier July 14, 1981 acc : .Mr.-Victor Stello (15 copies)

- Director-Office' of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l

Mr. G. Mcdonald, ' Director (1)

Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Gary Rhoads U. S. Nuclear Regulatory Commission P.O. Box.52 Shickshinny, PA 18655 i

t 4

~ ,

r Attachment to PLA-872 Subject

. Oversized termination lugs in ITE Model K-600 load center breakers Description of Problem Wires in ITE 480V' load center breakers have been terminated using terminal lugs designed for larger size wires. An improper crimp on such terminal lugs can result in the wires coming loose and slipping out of the terminal lugs. -This problem.was described in IE Information Notice #81-06.

Cause The oversized terminal lugs were installed on the load center breaker wiring during manufacturing by ITE. ITE has verbally indicated that the cause was l due to operator error in lug sized selection.

Analysis of Safety Implications Some of the ITE load center breakers with oversized terminal lugs on internal wiring are used to supply 480V safety related loads. They may also be used in an. isolation scheme to mirimize degrading effects on the class lE system from electrical faults in the non-class lE system, where non-class lE loads are connected to the class 1E power system. ,

The use of oversized lugs may lead to degraded electrical connections and an inability of the breaker to trip'and isolate fault conditions when required.

In a class lE system, such a breaker anomaly jeopardizes the design function which is to minimize the effects of faults within the class lE system. In an isolation scheme, such a breaker anomaly may allow non-class lE system faults to degrade the class lE system, thus providing a potential common mode failure

. mechanism'to redundant class lE power systems. The common mode failure could occur from multiple non-class lE faults degrzding the redundant power supplies through failures of the isolation system.

The condition constitutes a significant deficiency in Construction and PP&L Project Engineering has determined that, if the conditions described had gone uncorrected,-it could have adversely affected the safe operation of the plant,

.and therefore, is reportable under the requirements of 10 CFR 50.55(e).

Corrective Action An inspection of all safety related load center breakders on Unit 1 and 2 will.be performed. All oversizedlugs will be replaced with the proper size lugs.

PP&L electrical maintenance will be responsible for the inspection of all Unit 1 and common equipment. By direction of Nuclear Plant Engineering, this work will be tracked under Plant Staff work authorizations. Bechtel will be requested to perform the inspection on th2 Unit 2 squipment, and to track this work under Bechtel NCR 7513.

Page 1 of 2

w , e

  • Attachment to PLA-872 PP&L has requested that Brown Boveri Electric, Inc., suppliers of the ITE breakers, provide a response identifying the corr.tctive action taken to preclude similar occurrences.

Conclusion Upon completion of the inspection and repair program, all oversized lugs will be replaced thus assuring proper operation of the circuit breakers.

I Page 2 of 2