ML20009D191

From kanterella
Jump to navigation Jump to search
Discusses QA Program for Packaging of Radioactive Matl Under Certain Conditions for Transport & Transportation of Radioactive Matl
ML20009D191
Person / Time
Site: 071*****, 07100458
Issue date: 05/29/1981
From: Lange W
NAVY, DEPT. OF
To:
NRC
Shared Package
ML20009D187 List:
References
19257, 926, NUDOCS 8107230267
Download: ML20009D191 (1)


Text

e-r

, -i u, DEPARTMENT OF THE NAVY USS FULTON (AS-11) g, i.

FR3 NDV YORK. M5M ASil/88:gimL o

, '"^ '

9090 Ser 926 29 May 1981 From:

Commanding Officer, USS FULTON (AS-ll)

To:

United States Nuclear Regulatory Commission Washington DC 20555 Via:

Naval Energy and Environmental Support Activity, Port Hueneme CA 93043 Subj: Quality Assurance Program for the Packaging of Radidactive Material under certain conditions (10 CFR 71) for (zansport and transportation of Radioactive Material Ref:

(a) US Nuclear Regulatory Commission Material License 31-18014-01 (b) Code of Federal Regulations Title 10 part 71 (10 CFR 71)

(c) Code of Federal Regulations Title 49 (d) NRC, Washington DC ltr of 26 Nov 1980 (e) NRC, Washington DC ltr of 3 Mar 1981 1.

In accordance with reference (a) USS FULTON (AS-11) is authorized to use certain radioactive materials on board and on ships in areas where FULTON operates.

In the course of exercising this authorization some of these materials are shipped to and from civilian suppliers who are like-wise licensed by the NRC to provide those materials. A recent revision to reference (b) requires development of a Quality Assurance Program.

2.

This command is implementing a Quality Assurance Program which provides for procedures necessary for the satisfactory establishment and execution of the Quality Assurance Program for ase in packaging, shipment, and transportation of licensed materials. As an end user, it is not intended that FULTON engage in the manufacture or alteration of shipping pockages.

Rather, this program is designed to ensure that the quality of shipping packages received is initially certified by the supplier and naintained while such packages are in the custody of FULTON.

3.

I;. response to references (d) and (e) a copy of FULTON's Quality Assurance Program will be forwarded under separate cover for information and approval.

IGE O

PDR