Text
e a
fts.or.c m am m m w w wt I
i LONG ISLAND LIGHTING COM PANY vI SHOREHAM NUCLEAR POWER STATION www P.O. DOF 618. NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 July 20, 1981 b
@h f3 5 W o, 3
Mr. Harold R. Denton, Director
! I d 'j k g'
Office of Nuclear Reactor Regulation
\\
U.S. Nuclear Regulatory Commission vJ
~
aa Washingtt,o, D.C.
20555 C
9
[
7 s Q 'i'"'
O SHOREHAM NUCLEAR PuWER STATION - UNIT 1 Docket No. 50-322
Dear Mr. Denton:
In accordance with our response to NUREG-0737, Item I.C 8, " Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating L' cense Applicants",
enclosed are sixty (60) draft copies of the below listed emergency operating procedures for Shoreham:
Title SP Number Revision Level Concrol Emergency Procedure 29.023.01 C
Cooldown Emergency Procedure 29.023.02 C
Containment Control Emergency Procedure 29,023.03 C
Level Restoration Emergency Procedure 29.023.04 C
Rapid RPV Depressurization Emergency Procedure 29.023.05 C
Reactor Pressure Vessel Flooding Emergency Procedure 29.023.09 C
Transient with Failure to Scram Emergency Procedure 29.024.01 C
Station Blackout Emergency Procedure 29.015.02 C
If you require additional information or clarification, please do not hesitate to contact this office.
Very truly yours, SOO/
.S 8/bW'
/ (0
/
B. R. McCaffre Manager, Project Engineering RWG/lw Enclosures cc:
J. Higgin8107230259 810720 FC-8935 PDR ADOCK 05000322 PDR_