Text
'
)'
4 Q
p
.g g
s o
U
<if s t.
bec.
M1 D
0 lgg Docket File 3 ACRS(16)
L8#2 TERA 7
ASchsencer NSIC tfocket Nos. : 50-352 MService TIC and 50-353 GDC&lkins L PDR RLTedesco NRC POR DEisenhut/RPurple EM)RANDUM FOR:
A. Acharya, AEB OIE(3) 4N S. Bajwa, SAB Attroney, OELD C
N S. Chestnut. EPLB
,fM
\\
g JUL 151981*.
S. Hanauer, OHFS 9 gQJ S. Isreal, RRAB C
J. Pearring HGEB R. Wescott, HGEB
'#p##p 4' C. Woodhead OELD nuf 9
FROM:
G. D. Clakins, Project Manager f
Licensing Branch No. 2 DL Co m
SUBJECT:
REQUESTING FOR EVALUATION FOR SALT-CYCLE 2 FOR LIMERICK GENERATING STATION The Regional Board Meeting for Cycle 2 of the Systematickstessment of Licensee Performance (SALP) for the Limerick Generating Station will be held saon.
It will sover the period of July 1,1980, to June 30, 1981.
I will summarize the NRR Performance E"11uatinn in the fomat enclosed. This is to be an integrated evaluation.
Please provide = with any inputs you wish to have included by the COB July 20, 1981. The format of the enclosure can be used if desired.
G. D. Calkins, Project Manager Licensing Branch No. 2 l
Division of Licoesing l-l Enclosure; I
As stated l
l 8107220433 810710' s
i PDR ADOCK 05000 l ->...tanzt.T...1.an.f.'.'
~~*
..GDCa g.i,ns;.q,...ASc,g,ence r om>
- 7.../../#.../. 81.....
. 7../../.p /.81......
...................l.............
Eac roaa 3'8 O/80l NRCM O24o OFFICIAL RECOFiD COPY
- " "-32n24
I s
=
e a
~
Facility: _
Project Manager:
Appraisal Period:-
' 1.
Performance Elenfents
~
a.
Quality of responses-and submittals (such as SAR amendments, technical specification changes, generic letter response, and responses to requests for additional information).
- b. -Efforts required to obtain an acceptable response or submittal including:
(1) Timeliness (2) Effort (3)
Responsiveness to staff requests (4) Anticipates or reacts to NRC needs' c'. Working knowledge of regulations, gui!es, standards and, generic issues.
- d. " Technical competence.
e.
Conduct of meetings with NRR.
f.
Long-s+.anding open items.
.g.
Organization and management capabilities.
f..
Results of operator licensing examinations conducted during the appraisal period.
- i. Performance on specific issues (as selected by the Project Manager).
- 2. ' Observed trends in performance.
l l
3.
Np. table Strengths and Weaknesses a.
Strengths b.
Weaknesses l
l 4..
Overall Summary
~
(Shall include Eerall rating - above average,' average, oelow average).