ML20009C685

From kanterella
Jump to navigation Jump to search
Immediate Action Ltr Confirming 810713 Telcon.On or Before 810716,test Will Be Performed to Confirm Dose Calibrator Accuracy to within 5% of Stated Activity on Precalibr Dose of Tc-99.Dose Calibrator Will Be Tested for Linearity
ML20009C685
Person / Time
Issue date: 07/14/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Walker M
DEXTER MEMORIAL HOSP., DEXTER, MO
References
IAL, NUDOCS 8107210357
Download: ML20009C685 (1)


Text

.

g-f (

Dc.S IMMEDIATE ACTION LETTER 4-

. MM c\\ g'i*4

,g,V ll O

M 14 M 1

JUL g0 IS8lk ~. ;

u.s. yNss& tony Dexter Memorial Hospital License No. 24-18627 Ol' J'

ATTN:

Mr. Melvin Walker

~ Administrator One Mile Road Dexter, MO 63841 Gentlemen:

This is in reference to the telephone conversation between you and

-Dr. W. J. Adam of this office on July 13, 1981.

It is our understanding that on or before July 16, 1981, you will perform a test to confirm the securacy of your dose calibrator to within i 5% of the stated activity on a precalibrated dose of technetium-99m. Moreover, you will have your dose calibrator tested for linearity and accuracy within 20 days of the date of this notice by an individual authorized by the NRC to perform such tests.

If our understanding in this ratter is not correct, please notify us immediately.

Sincerely, d B&Eu h James G. Keppler Director O7 cc: DMB/ Document Control Desk (RIDS)

O c/y y P*/g,

s3A.

e i

I R I RIII RIII RIII RI

~

h d

d pKeppler A

NoreIjus hvStreeter Davis Ma era /np 7

. am

&ql9) 7})p 7l,f 7f 1 ?+

Qf13/81 13 IMMEDIATE e'.10N LETTER 0107210357 810714 NMS LIC30 24-18627-01 PDR