Forwards One Oversize Drawing of Milestone Schedule for Facility,Updated Through June 1981.Project Estimated to Be 78.6% Complete.Aperture Cards Are Available in PDR
ML20009C579
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/16/1981
From: Rasho R
ILLINOIS POWER CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
NUDOCS 8107210241
Download: ML20009C579 (2)


Text

. _ -.

s

/LLINO/S POWER COMPANY IP CLINTON POWER STATION, P.O. BOX 678 CLtNTON, ILLINDIS 61727

)?ll*h h$/

h q9.

P

~

July 16, 1981 V w y/

d

,y

/>

AN W j IQ \\

Mr. James R. Miller Standardization and Special Projects Branch Division of Licensing United States Nuclear Regulatory Commission Washington, D.C.

20558

SUBJECT:

Illinois Power Company Milestone Schedule for Clinton Unit I June 1981 Update

Dear Mr. Miller:

Attached please find two (2) copies of the milestone schedule for the Clinton Unit I Project, updated with status reported through June, 1981.

The project is currently estimated to be 78.6 percent complete, with the target for fuel loading re-maining at January 3, 1983.

Please note that all date changes and logic revisions have been circled on the attached copies.

7 If there are any questions and/or comments, please contact us at (217) 937-1111, Extension 2811.

o OOI Sincerely, P 5

. Y)Sak //si~

ll3 s find DI A*I,','

R.

P.

Rasho Director of Project Controls g f:fg5 RPR:HST/dg cc:

Mr.

H.

Livermore - w/att.

g Resident Inspector /Clinton NPS g

h, g 7, c/o U.

S.

Nuclear Regulatory Commission l

R.

R.

3, Box 229-A Clinton, Illinois 61727 0107210241 810716 PDR ADOCK 05000461 A

PDR

.o

bec:

W.

C. Gerstner - w/att.

J. O. McHood - w/att.

L. J.

Koch - w/att.

G. M.

Brashear - w/att.

G.

E. Wuller - w/att.

File VIII.1 - w/att.

l l

I r

1 I

l

O3 m

m.

~

D G. =

l N

I M

m h

m m

O.

NO. OF PAGES l

REASON O PAGE ILLEGIBLE.

O HARD COPY FILED AT:

PDR CF OTHER O BETTER COP / REQUESTED ON

/

/

PAGE TOO LARGE TO FILM.

O3 I

HARD COPV FILED AT:

PDR i

CF OTHER FILMED ON AFRTURE CARD NO

.