- h U-0253
/Li/No/S POWER COMPANY gj[J OgUblb0 '
}6 T S REET, DECATUR, ILUNOIS 62525 July 8, 1981 Mr. James G. Keppler
'/N f
Director, Region III
/
Office of Inspection & Enforcement
/,q '
U.S. Nuclear Regulatory Commission d
9 [p s [T2
.B 799 Roosevelt Road
.94
)OL 'g njg Glen Ellyn, Illinois 60137 o
\\
Dear Mr. Keppler:
Clinton Power Station Units 1 & 2 dlTrJ\\
Docket Nos. 50-461 and 50-462 Construction Permits No. CPPR-137 & CPPR-138 This is in reply to your letter of April 9,1981, whereby you forwarded IE Bulletin No. 81-02 which reported on the failures of some gate type valves to close against differential pressure.
Please be advised that none of the valves addressed in Bulletin No. 81-02 will be installed at the Clinton Power Station.
Sincerely,
/
G. E. Wuller l
Supervisor-Licensing Nuclear Station Engineering Dept.
GEW/lt cc:
H. H. Livermore, NRC Resident Inspector i
Director, Office of I & E, Div. of Reactor Operations Inspection l
NRC, Washington, D.C.