ML20009C505

From kanterella
Jump to navigation Jump to search
Amends 63,54,73 & 66 to Licenses DPR-19,DPR-25,DPR-29 & DPR-30,respectively,authorizing Operation W/One Recirculation Pump Out of Svc
ML20009C505
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 07/09/1981
From: Crutchfield D, Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20009C506 List:
References
NUDOCS 8107210166
Download: ML20009C505 (8)


Text

  1. Y 9

UNITED STATES g

NUCLEAR REGULATORY COMMISSION p,

g l

WASHINGTON, D. C. 20556

%,...../

COMMONWEALTH EDISON COMPANY DOCKET NO. 50-237 DRESDEN STATION, UNIT NO. 2 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 63 License No. DPR-19 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated June 30, 1981, complies with standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in com-pliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by deletion of the existing Paragraph 3.M, and the addition of a new Paragraph 3.M to Provisional Operating License No. DPR-19 to read as follows:

l' 8107210166 810709 PDR ADOCK 05000237 P

ppg M.

Provisions to allow operation with one recirculation loop out of service:

1.

The steady-state thermal power level will not exceed 50% of rated 2.

The Minimum Critical Power Potio (!!CPR) Safety Limit will' be increased.03 10.1.10 (T.S.1.1.A and 3.3.5C) 3.

The MCPR Limiting Condition for Operation (LCO) will be increased 0.03 to 1.27 and 1.34 for 7x7 and 8x8 fuel respectively (T.S. 3.5.K) 4.

The Minimum Average Planar Linear Heat Ccneration Rate (MAPLHGR) limits will be reduced by 0.7 for all fuel types (T.S. reference 3.5.1) 5.

The APRM Scram and Rod Block Setpoints and the RBM Setpoints shall be reduced by 3.5% to read as follows:

T.S. 2.1.A.1 S

.58 WD + 58.5' T.S. 2.1.A.1*

S - (.58 WD + 58.5)

FRP/MFLPD T.S. 2.1.8 S -.58 WD + 46.5 T.S. 2.1.B*

S - (.58 WD + 46.5)

FRP/MFLPD T.S. 3.2.C.

(TABLE 3.2.3):

APRM Upscale _(.58 WD + 46.5)

FRP/MFLPD RBM Upscale

.65 WD 38.5 6.

The suction valve in the idle loop is closed and electrically isolated until the idle loop is being prepared for return to service.

7.

APRM flux noise will be measured once per shift and the recirculation pump speed will be reduced if the flux noise averaged over 1/2 hour exceeds 5% peak to peak, as measured on the APRM chart recorder.

8.

The core plate delta p noise will be measured once per shift and the recirculation pump speed will be reduced if the noise exceeds 1 psi peak to peak.

3.

This license amendment is effective as of the date of issuance.

FOR

'HE NUCLEAR REGULATORY COMMISSION Denn4WN4 s M. Crutch eld, hief l

Operating Reactors Branch #5 Division of Licensing Date of. Issuance:

July 9,1981

h,,

UNITED STATES NUCLEAR REGULATORY COMMISSION w

a t

%.....;j WASHINGTON, D. C. 20556 COMM0fMEALTH EDISON COMPANY DOCKET NO. 50-249 DRESDEN STATION UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 54 License No. DPR-25, 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated June 30, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by the addition of Paragraph 3.L to Facility Operating License No. DPR-25 to read as follows:

L.

Provisions to allow operation with one recirculation loop out of service:

1.

The steady-state thermal power level will not exceed 50% of rated 2.

The Minimum Critical Power Pctio (!!CPR) Safety limit will' be increased.03 to 1.10 (T.S.1.1.A and 3.3.5C) 3.

The MCPR Limiting Condition for Operation (LCO) will be increased 0.03 to 1,42 for 7 x 7 and 8 x 8 fuel (T.S. 3.5.K) 4.

The Minimum Average Planar Linear Heat Cencration Rate (MAPLHGR) limits will be reduced by 0.7 for 4

all fuel types g

(T.S. reference 3.5.!)

5.

The APRM Scram and Rod Block Setpoints and the R8M Setpoints shall be reduced by 3.5% to read as follows:

T.S. 2.1.A.1 S

.58 WD + 58.5' T.S. 2.1.A.1*

S - (.58 WD + 58.5) FRP/MFLPD T.S. 2.1.B S

58 WD + 46.5 T.S. 2.1.B*

S - (.58 WD + 46.5) FRP/MFLPD T.S. 3.2.C.

(TABLE 3.2.3):

APRM Upscale -(.58 WD + 46.5)

FRP/MFLPD RBM Upscale

.65 WD 38.5 6.

The suction valve in the idle loop is closed and electrically isolated until the idle loop is being prepared for return to service.

7.

APRM flux noise will be measured once per shift and the recirculation pump speed will be reduced if the flux noise averaged over 1/2 hour exceeds Si peak to peak, as measured on the APRM chart recorder.

8.

The core plate delta p noise will be measured once per shift and the recirculation pump speed will be reduced if the noise exceeds 1 psi peak to peak.

  • In the event that NFLPD exceeds FRP.

3.

This license amendment is effective as of the date of issuance.,

FOR THE NUCLEAR REGULATORY COMMISSION 1

hk Thomas A.

ppolito, Chief Operating Reactors Branch #2 Division of Licensing Date of Issuance: July 9,1981

[*g UNITED STATES 8-NUCLEAR REGULATORY COMMISSION o

O

j WASHINGTON, D. C. 20556

\\...../

COMMONWEALTH EDISON COMPANY AND IOWA-ILLInud GAS AND ELECTRIC COMPANY DOCKET NO. 50-254 QUAD CITIES STATION UNIT NO. 1 AMENDMENT TO FACILITY OPERCING LICENSE Amendment No. 73 '

License No. DPR-29 1.

The Nuclear Regulatory Comission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated June 30, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be cr. 4:ted without endangering the health and safety of the public, as (til that such activities will be conducted in compliar-:.

th he Commission's regulations; D.

The issuance of this r endment. vill not be inimical to the common defense and security or to the heal?,h and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all appl fible requirements have been satisfied.

2.

Accordingly, the license is amen hd by the addition of Paragraph 3.K to Facility Operating Liunse No. DPR-29 to read as follows:

l I

.2 X.

Provisions to allow operation with one recirculation loop out of service:

l.

The steady-state thermal power level will not exceed 50% of rated 2.

The Minimum Critical Power Pctio (!!CPR) Safety Limit will' be increased.03 to 1.10 (T.S.1.1.A and 3.3.5C) 3.

The MCPR Limiting Condition for Operation (LCO) will be increased 0.03 to 1,38 for 7 x 7 and 8 x 8 fuel (T.S. 3.5.K) 4.

The Minimum Average Planar Linear Heat Generation Rate (MAPLHGR) limits will be reduced by 0.7 for all fuel types (T.S. reference 3.5.1) 5.

The APRM Scram and Rod Block Setpoints and the RBM Setpoints shall be reduced by 3.5% to read as follows:

T.S. 2.1.A.1 S

.58 WD + 58.5' T.S. 2.1.A.1*

S - (.58 WD + 58.5)

FRP/MFLPD T.S. 2.1.8 S -.L8 WD + 46.5 T.S. 2.1.B*

S - (.58 WD + 46.5)

FRP/MFLPD T.S. 3.2.C.

(TABLE 3.2.3):

l APRM Upscale _(.58 WD + 46.5)

FRP/MFLPD RBM Upscale

.65 WD 38.5 i

S.

The suction valve in the idle loop is closed and electrically isolated until the idle loop is being prepared for return to service.

7.

APRM flux noise will be measured once per shift and the recirculation pump speed will be reduced if the flux noise averaged over 1/2 hour exceeds 5% peak to peak, as measured on the APRM chart recorder.

8.

The core plate delta p noise will be measured once per shift and the recirculation pump speed will be reduced if the noise enceds 1 psi peak to peck.

  • In the event that MFLPD exceeds FU.

3.

This license amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/

k)xdk homas A. 4(polito, Chief Operating Reactors Branch #2 Division of Licensing l

Date of.Issyance-July 9,1981

l

/ps *to u

,,o,,

UNITED STATES E

NUCLEAR REGULATORY COMMISSION n

O

E WASHING TON. D. C. 20555 g,

f COMMONWEALTH EDISON COMPANY AND IOWA-ILLIN0IS GAS AND ELECTRIC COMPANY DOCKET NO. 50-265 QUAD CITIES STATION UNIT NO. 2 ANENDMENT TO FACILITY OPERATING LICENSE Amendment No. 66 License No. DPR-30 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated June 30, 1981, complies with the standards and requirements of.the Atomic Energy Act of 7 954, as amended (the Act) and the Commission's rules and regalations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by the addition of Paragraph 3.J to Facility Operating License No. DPR-30 to read as follows:

-2 J.

Provisions to allow operation with one recirculation loop out of service:

1.

The steady-state thermal power level will not exceed 50% of rated 2.

The Minimum Critical Power Patio (!!CPR) Safety Limit will' be increased.03 to 1.10 (T.S.1.1.A and 3.3.5C) 3.

The MCPR Limiting Condition for Operation (LCO) will be increased 0.03 to 1.38 for 7 x 7 and 8 x 8 fuel (T.S. 3.5.K) 4.

The Minimum Average Planar Linear Heat Generation Rate (MAPLHGR) limits will be reduced by 0.7 for all fuel types (T.S. reference 3.5.I) 5.

The APRM Scram and Rod Block Setpoints and the RBM Setpoints shall be reduced by 3.5% to read as follows:

T.S. 2.1. A.1 S

.58 WD + 58.5' T.S. 2.1.A.1*

S - (.58 WD + 58.5)

FRP/MFLPD T.S. 2.1.B S -.58 WD + 46.5 T.S. 2.1.B*

S - (.58 WD + 46.5)

FRP/MFLPD T.S. 3.2.C.

(TABEE 3.2.3):

APRM Upscale -(.58 WD + 46.5)

FRP/MFLPD RBM Upscale

.65 WD 38.5 6.

The suction valve in the idle loop is closed and electrically isolated until the idle loop is being prepared for return to service, 7.

APRM flux noise will be measured once per shift and the recirculation pump speed will be reduced if the flux noise averaged over 1/2 hour exceeds 5% peak to peak, as measured on the APRM chart recorder.

8.

The core plate delta p noise will be measured once per shift and the recirculation pump speed will be reduced if the noise exceeds 1 psi peak to peak.

3.

This license amendment is effective as of the date of issuance. ;,

FOR Tile NUCLEAR REGULATORY COMMISSION ob Thomas A.

ppolito, Chief Operating Reactors Branch #2 Division of Licensing Date of. Issuance: July 9,1981