ML20009C456

From kanterella
Jump to navigation Jump to search
Issues Amend 30 to License SNM-1067,authorizing Possession of 4.0 Kg U,Enriched to 93% U-235 in Any Form of Waste & Repackaging of Wastes for Disposal in Licensed Disposal Facility
ML20009C456
Person / Time
Site: 07001100
Issue date: 06/29/1981
From: Page R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Lichtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20009C457 List:
References
NUDOCS 8107210087
Download: ML20009C456 (1)


Text

.

' /. &

n / \\l e 3#,

Distribution:

r-

" Dock i F,il: 70-1100 9 l~*

PDR

~ i.

SH0; ' A 3

s.

NMSS r/f JUN 2 91981 FCUF r/f FCUP r/f MVP:NK NKetzlach (2) 70-1100 EYShum LTyson SNM-1067, Amendment No. 30 WTCrow RGPage ALSoong RECunningham IE HQ (2)

Combustion Engineering, Inc.

BBrooks ATTN: Mr. H. V. Lichtenberger, Vice President ACabell Nuclear Fuel RErickson Nuclear Power Systems - Manufacturing JRobertson 1000 Prospect Hill Road DWeiss Windsor, Connecticut 06095 HWerner PRRosenthal, CE Ger.- 1 emen:

In accordance with your revised application dataiMay 1, 1981, and pursuant to Title 10, Code of Federal Regulations, Part 70, Materials License No.

SW-1067 is hereby amended to authorize the possession of 4.0 kg uranium having enrichments <93% 23sU in any fom.of wastes and to repackage the wastes for disposal in a licensed disposal facility.

The amendment shalt remain in effect for 9 months.from the date of this letter or until the waste materials have been shipped off-site, whichever is sooner, and is authorized subject:.to the following conditions:

Condition.29.

Notwithstandinp the request to calculate the quantity of 23'U in eacn drum using the method

~

outlined in Attachment B-ll, the uranium content shall be calculated from its ppm content expressed on a total uranium ass basis.

Condition 30.

Within 60 days of the issuance of this amendment, the licensee shall submit a detailed plan for the decontamination of the soil in the waste material i

staging area identified in your revised application dated May.1,1981 in accordance with the attached criteria.

Ai. other conditions of this license shall remain the same.

Conditions 29 and 30 were discussed and agreed to by your Mr. P. R. Rosenthal and Mr. Norman Ketzlach of my staff on June 12, 1931.

I* should be noted the NRC must make a confirmatory survey of the area and aree the contamination levels are low enough to be released for unrestrict use.

e107'210087 810625 FOR THE NUCLEAR REGL1ATORY COMMISSION PDR ADC'CK 07001100 C

FDR Oricinal Signed by.

OFFICE k fC PE ICU

~

"ACUA' R'." G'." Pagu', 0;inf" ""

~5 5""4

.MK M. 0.ch:rd..E.Ysbum.

..... !Jn.97...

A

. uranium..Fue'. Licensing..Brangrpw..,,

Pa wry

6. /.22/.8.1........ 6../..(.. /.8.1......

... 6../. y.. /. 8.1....... Divi:: ion of Fuel Cycle ar d 6/'yf'"/81

"'""g'""'

6/

/81

...y.,. 4.d' D ' @ '4"""""

OFFIClAL RECORD COPf'

"" '98b329 82 NRC FORM 318110'801 NRCM O240

_