ML20009C322

From kanterella
Jump to navigation Jump to search
Forwards LER 81-001/03L-0
Date released: 01/23/2020 Download: ML20009C322


LER 81-001/03L-0:on 810112,during Startup,For 4-h,condensate Storage Tank Contained Less than 185,000 Gallons Required by Tech Spec 3.8.1.C.Caused by Increased Water Demand During Low Power Physics Testing Exceeding Treatment Plant Output
ML20009C333
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 02/11/1981
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C333 (2)
Forwards LER 81-001/03L-0
ML20009C321
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 02/11/1981
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C321 (1)