RA-81-073, Forwards IE Bulletin 79-14,Safety-Related Piping,Sys Phase 2 Inaccessible Piping Insp Rept, Per Request of Northern States Power Co

From kanterella
(Redirected from ML20009C029)
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Safety-Related Piping,Sys Phase 2 Inaccessible Piping Insp Rept, Per Request of Northern States Power Co
ML20009C029
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/14/1981
From: Arterburn J
NUTECH ENGINEERS, INC.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20009C031 List:
References
IEB-79-14, JRA-81-073, JRA-81-73, NSP-37-112, NUDOCS 8107200188
Download: ML20009C029 (1)


Text

ma W

I 4

_.-ei-.

---+SS 4A-J

---4

..h 2

+d J-x A

f o O (* 3 h

6835 VIA DEL ORo. SAN JOSE, CAL /ORNIA 95119. PHONE (408) 629-9800. TELEX 352062

{

l July 14, 1981 i

JRA-01-073 l

NSP-37-ll2 i

l

]

Mr. V.

Stello, Jr., Director l

Office of Inspection and Enforcement U.

S.

Nuclear Pegulatory Commission 4

Washington, D. C.

20555

Subject:

IE Bulletin 79-14, Phase 2 Inaccessible Piping Inspection Report, Monticello Nuclear Generating Plant

)

Dear Mr. Stallo:

}

Enclosed are two (2) copies of NUTECH Report NSP-37-061, Revision 1, titled "IE Bulletin 79-14, Safety Related Piping Syntems, Phase 2 Inaccessible Piping Inspcction Report, Moriticello Nuclear Generating Plant."

4 The document is being transmitted to you at the request of Northern State 9 Power Company.

Please call should you need additional copies of the Phase 2 Inaccessible Piping Inspection Report.

Sincer.ly yours,

{f s

J.

R.

Arterbu n, P.

Enginaering M ager i

JRA/cm i

Enclosures

tfch cc:

R. A. Goranson w/o Enclosures QN

'k/s 2

? 1987 n W,u.sN',,Qroa, TEdI r

S b p a g /v

//

FEE $00cge,gggy PDR

.TE-H

-. -