RA-81-073, Forwards IE Bulletin 79-14,Safety-Related Piping,Sys Phase 2 Inaccessible Piping Insp Rept, Per Request of Northern States Power Co
| ML20009C029 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 07/14/1981 |
| From: | Arterburn J NUTECH ENGINEERS, INC. |
| To: | Stello V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20009C031 | List: |
| References | |
| IEB-79-14, JRA-81-073, JRA-81-73, NSP-37-112, NUDOCS 8107200188 | |
| Download: ML20009C029 (1) | |
Text
ma W
I 4
_.-ei-.
---+SS 4A-J
---4
..h 2
+d J-x A
f o O (* 3 h
6835 VIA DEL ORo. SAN JOSE, CAL /ORNIA 95119. PHONE (408) 629-9800. TELEX 352062
{
l July 14, 1981 i
JRA-01-073 l
NSP-37-ll2 i
l
]
Mr. V.
Stello, Jr., Director l
Office of Inspection and Enforcement U.
S.
Nuclear Pegulatory Commission 4
Washington, D. C.
20555
Subject:
IE Bulletin 79-14, Phase 2 Inaccessible Piping Inspection Report, Monticello Nuclear Generating Plant
)
Dear Mr. Stallo:
}
Enclosed are two (2) copies of NUTECH Report NSP-37-061, Revision 1, titled "IE Bulletin 79-14, Safety Related Piping Syntems, Phase 2 Inaccessible Piping Inspcction Report, Moriticello Nuclear Generating Plant."
4 The document is being transmitted to you at the request of Northern State 9 Power Company.
Please call should you need additional copies of the Phase 2 Inaccessible Piping Inspection Report.
Sincer.ly yours,
{f s
J.
R.
Arterbu n, P.
Enginaering M ager i
JRA/cm i
Enclosures
- tfch cc:
R. A. Goranson w/o Enclosures QN
'k/s 2
? 1987 n W,u.sN',,Qroa, TEdI r
S b p a g /v
//
FEE $00cge,gggy PDR
.TE-H
-. -