ML20009A983
| ML20009A983 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/29/1981 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20009A984 | List:
|
| References | |
| NUDOCS 8107140578 | |
| Download: ML20009A983 (1) | |
Text
__
l
=
s bY A8
@. INDIANA & MICHIGAN ELECTRIC COMPANY p,,,,
DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 46.55901 June 29, 1981 m
aai0VMs Mr. J.G. Keppler, Regional Director
~j Office of Inspection and Enforcement lS l J U l l 3 19Ol h d I United States Nuclear Regulatory Commission u.3, %
Region III dsl@'otr y
799 Roosevelt Road
/g Glen Ellyn, IL 60137 g
s Operating u.w nse DPR-74 Docket No. 50-316
Dear Mr. Keppler:
Pursuant to the requirements of the Appendix A Technical Specifications, the following report /s are submitted:
R0 81-023/03L-0 ii0 81-024/03L-0 Sincerely, h
n:
yGr D.V. Shaller Plant Manager
/bab cc:
J.E. Dolan R.S. Hunter R.W. Jurgensen i
R.F. Kroeger K.J. Vehstedt E. Nanson/N. DuBry R0:III R.C. Callen MPSC G. Charnoff, Esq.
J.M. Hennigan W. Lavallee EPRI h"f(r PNSRC J.F. Stietzel q
E.L. Townley t
Dir., IE (30 copies) 31 l
Dir., MIPC (3 copies)
B107140578 810629 DR ADOCK 05000 g
- _ _ _ _.