ML20009A840
| ML20009A840 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/02/1981 |
| From: | Shaller D INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-80-24, NUDOCS 8107140331 | |
| Download: ML20009A840 (1) | |
Text
h/lh V
f ?I1 L**,;,,, INDIANA & MICHIGAN ELECTRIC COMPANY h}4 Y
rY
~
\\
o
(
DONALD C. COOK NUCLEAR PLANT 8-o P.O. Box 458, Bridgman, Michigan 49106 bg hQb (616) 465-5901 b
J' Q
A/
U July 2, 1981
\\wl Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
This is to confim our verbal report to Mr. E.R. Swanscn, NRC Region III inspector, on July 2,1981, at 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br /> at which time we reported leakage from a small pinhole in a f,onessential Service Water line.
Pursuant to the requirements of IE Bulletin 80-24, a followup report will be submitted within 14 days.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E. Dolan R.S. Hunter R.W. Jurgensen R.F. Kroeger K.J. Vehstedt E. Swanson/N. DuBry R0:III R.C. Callen MPSC l
J.M. Hennigan
-p W. Lavallee EPRI b,s l
PNSRC J.F. Stietzel
/
//0 l
E.L. Townley Dir., IE (40 copies)
Dir., MIPC (4 copies)
O!OOOOf3
~
jgt 6 1981 PDR i
..