Interim Deficiency Rept Re Incorrect ECCS Cabinet Wiring. B&W Field Changes Are Being Reviewed & Will Be Issued to Bechtel for Implementation Upon Approval.Next Rept by 811015
ML20009A747
Person / Time
Site: Midland
Issue date: 06/30/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 12036, NUDOCS 8107140085
Download: ML20009A747 (2)


Text

'

b hh f

, Consumels Power James W Cook CO=PBRY Vice President - Projects, Engtneenng and Construction General Offices. 1945 West Parnell Road, Jackson. MI 49101 + (517) 788 0453 80-03 #3 June 30,1951

(/G 1' 1,  %

Mr J G Keppler, Regional Director Office of Inspection & Enforcement kULl L

,s}-

Y US Iluelear Regulatory Commission

[ 4 Region III f7 3 jggj p --

pg 799 Roosevelt Road g u.s. gssot //

Glen Ellyn, IL 60137 <\

9

/ /

MIDLAIiD PROJECT DOCFE IiOS 50-329, 50-330 y]g g ECCAS CABIIiET WIRIIiG FILE: 0.4.9.L5 UFI: 73*10*01, 02210(S), 39301(E) SERIAL: 12036

References:

J W Cook letterc to J G Keppler, Same Subjt t; (1) 3erial 10087, dated December 17, 1980 (2) Serial 11502, datea February 27, 1981 This letter, as were the referenced letters, is an interir report on the ECCAS cabinet wiring.

Babcock & Wilcox stated in the last interic report that Bailey Controls Company shall initiate field changes and/or drawing revisions as necessary to bring the I/idland ECCAS drawings and hardware into agreement.

B&W has submitted these field changes entitled " Correction of ECCAS Wiring Errors" for review and implementation. CPCo is presently reviewing the field changes and upon their approval will issue then to Bechtel for implementation.

Completion of the corrective action remains estimated to be September 30, 1981.

Another report either interim or final, will be sent on or before October 15,19$1.

F e IUS/1r Gr o 8107140085 810630 QuL 4 '/'

PDR ADOCK 05000329 S PDR

p 2

Serial 12036 60-03 #3 CC: Director of Office of Inspection & Enforcement Att Mr Victor Stello, USNRC (15)

Director, Office of Management Information & Program Control, USNRC (1)

RJCook, USNRC Resident Inspector Midland Nuclear Plant (1)

CBechhoefer, ASLB Panel RSDecker, ASLB Pan 1 FPCcwan, ASLB Panel 43&L Appeal Panel mMCherry, Esq MSinclair BSt amiris CRStephens, USNRC WDPaton, Esq, USNRC EJKelly, Esq, Attorney General SEFreeman, Esq, Asst Attorney Gen GTTaylor, Esq, Asst Attorney Gen WEMarshall GJMerritt , Esq, TNK&J

.