ML20009A633

From kanterella
Jump to navigation Jump to search
Forwards LER 81-024/03L-0
Date released: 01/23/2020 Download: ML20009A633


LER 81-024/03L-0:on 810604,shutdown Transformer Primary & Secondary Breakers Opened Due to Fault in Offsite Power Supply.Caused by Failure of Cable Porcelain Clamps.Clamps removed.Post-type Insulators Installed
ML20009A636
Person / Time
Site: Pilgrim
Issue date: 07/03/1981
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20009A636 (1)
Forwards LER 81-024/03L-0
ML20009A631
Person / Time
Site: Pilgrim
Issue date: 07/03/1981
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20009A631 (1)