15219 DUQUESNE LIGHT COMPANY Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 June 29, 1981 BVPS:HPW:316 Beaver Valley Power Station, Unit No. 1 LER 05 b3 b5 and 81 1 4T f-M 1 f1 'p, Scb R,4((# ll 1 p,4 l
Mr. B. H. Grier, Director sin 2OJggy*b
.]' ' y,[duig% % (f'-
United States Nuclear Regulatory Commission Region 1
'A 631 Park Avenue j
King of Prussia, Pennsylvania 19406 g
Q.
M
Dear Mr. Grier:
In accordance with Appendix A, Beaver Valley Technical Specifications, the following Licensee Event Reports are submitte -
d LER 81-054/03L, Technical Specification 3.6.2.2, Containment Depressurization Systems.
LER 81-055/03L, Technical Specification 3.5.1, S.I. Accumulators.
In accordance with Appendix B, Beaver Valley Technical Specifications, the following Licensee Event Report is submitted:
LER 81-041/04T, Technical Specification 3.2, Radiological Environmental Monitoring.
Very truly yours, l
AA H. P. Williams Superintendent Attachment p
ru 8107130269 810629 PDR ADOCK 05000334 I
g PDR
t J
Mr. B. H. Grier j
~
June 29, 1981 BVPS:HPW:316
" age 2 1
i cc: Director Of Management & Program Analysis United States Nuclear Regulatory Commission Washington, D. C.
20555 J. Hultz, Ohio Edison Director, Office of Inspection and Enforcement Headquarters United States Nuclear Regulatory Commission 4
Washington, D. C.
20555 D. A. Chaney, BVPS Licensing Project Manager United States Nuclear Regulatory Commission f
Washington, D. C.
20555 D. A. Beckman, Nuclear Regulatory Commission, BVPS Site Inspector Mr. Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison Nuclear Safety Analysis Center, Palo Alto, California i
I G. E. Muckle, Factory Mutual Engineering, Pittsburgh R. C. Wittschen, Stone & Webster / Boston i