Requests Confirmation That Seabrook & WPPSS Surveillance Repts Will Be Sampled to Assure Generic Coverage Per 810429 Telcon
ML20008G062
Person / Time
Issue date: 05/27/1981
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Curnane R
UNITED ENGINEERS & CONSTRUCTORS, INC.
Shared Package
ML20008G060 List:
References
REF-QA-99900510 NUDOCS 8107020143
Download: ML20008G062 (1)


Text

{{#Wiki_filter:_ _ _ _ _ _ rm N

  • 'e,

UNITE 3 STATES r/ y. NUCLEAR REGULATORY COMMISSION ~ h-REGloN IV O 8 'il RYAN PLAZA DRivI. SUITE 1000 ARUNGTON; TEXAS 70011 3 7 MAY 1981 Docket No. 99900510/81-01 United Engineers & Constructors, Inc. ATTN: Mr. R. A. Curnane ~ Vice President Project Support Operations 30 South 17th Street P. O. Box 8223 Phildelphia, PA 19101 Gentlemen: This is in reference to our letter of May 7,1981, concerning your response to the nonconforw nces identified in the 99900510/81-01 inspection at your facilities. This matter was discussed during a phone call with your Mr. J. B. Silvenvood and Mr. R. H. Leonard on April 29,1981, and again with Mr. R. H. Leonard on May 18, 1981. Specifically, what is needed at this point is for United Engineers and Constructors to confirm in writing that they will not only sample the Seabrook surveillance reports, but will also sample the WPPSS surveillance reports to assure generic coverage. I Please provide this infonnation within 25 days from the date of this letter in order that we may complete our review in a timely manner. l Sincerely, ) 1 ' Ave Uldis Potapovs, Mief Vendor Inspection Branch I 1 l g pq o 20Yl3 1

.o S l Docket No. 99900510/81-01 0 'l N W United Engineers & Constructors. Inc. ATTN: Mr. R. A. Curnane Vice President. Project Support Operations . 30 South 17th Street P. O. Box 8223 Philadelphia, PA 19101 Gentlemen: Thank youffor your letter of April 14, 1981, in response to our letter dated March 27, 1981. As a result of cur review, we find that additional infomation is needed regarding corrective actions and preventive measures for Nonconfomance B; however, this das obtained from your Mr. J. B. Silverwood and Mr. R. H. Leonard, by telecon, on April 29,1981. Specifically. United Engineers & Constructors will not only sample the Seatrook surveillance reports, but will also sample the"WPPSS surveillance reports to assure generic coverage. We have no further questions at this time. We will confim this infomation and review all your comitted corrective actions and preventive measures dufing a future inspection. Sincerely, Uldis Potapovs. Chief Vendor Inspection Branch bcc: l Central Files l PDR HQS JEGagliardo JRCostello JMars5all WEVetter u, l or y Bjorl80 Of

o g intted engineersa-m

    • "^*

30 South 17th Srr,et x, ory,ug Post Office Box 6223 r,auene.e4 Philadelphia, PA 19101 vausvronoa Mr. Uldis Potapovs, Chief April 14, 1981 Vendor Inspection Branch U. S. Nuclear Regulatory Commission G, g.' } '/! Ti. I i.. T h r -{' '-{ ' - ' Office of Inspection and Enforcement g, L e Region IV 611 Ryan Plaza Drive Suite 1000 "f Arlington, Texas 76011 APR2 0 G81 /l Dest Mr. Potapovs: Docket No. 99900510/81-01 This letter acknowledges receipt of your Inspection Report, 27, 1981, for an inspection conducted by Mr. J. R. Costello dated March at United Engineers & Constructors Inc. in Philadelphia, Pa. on February 23-26, 1981. Three Nonconformances were identified by your staff. Our response is attached including a restatement of the requirements and specific Nonconformances. The actions proposed to correct the Nonconformances and preclude recurrence are also stated; as well as, the expected completion dates. If you have any questions or concerns regarding our response, please contact this office. Sincerely, R.A, w R. A. Curnane, Vice President Project Support Operations RRC/RAC/be Attachment j BIOrl804W ( "~~ )

1 Attachment 2 Docket No. 99900510/81-01 n UE&C StatementsJf Corrective Action Criterion V of Appendix 3 to 10 CFR Part 50 states: " Activities affecting quality shall be prescribed by documented instructions. - procedures, or drawings, of a type appropriate to the circumstances and shan be accomplished in accordance with these instructions, procedures, or drawings. Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished." Nonconformances from these requirements and the UE&C Corrective Actions are as follows: WPPSS Quality Assurance Procedure QA-7-2 requires that the Vendor l A. Surveillance Representative af ter witnessing, performing or verifying the functions listed on the Vendor Surveillance Check Plan (VSCP) sign and date the appropriate blocks of the VSCP. Contrary to the above, VSCPs contained in Quality Control Vendor Surveillance Reports 91-CRO-11, 91-CRO-5, 91-CRO-4, 91-(4)-CRO-2, 140-(4)-EPH-1 a el 155-TAR-1 were not signed and dated as required by QA-7-2, but we ce initialed and dated. UE&C Corrective Action The following WPPSS Quality Assurance Procedure QA-7-2 is being changed. definition for " signed and dated" will be added to the procedure: " signed anddated means dated and stamped or initialed or full signature". This revision win be completed by June 2,1981. Seabrook Quality Assurance Procedure QA-7-2 states in part "The Supervising Engineer - Vendor Surveillance will establish Vendor Surveillance files, for B. Vendor files will all Purchase Orders within the scope of this procedure.... include copies of the following documents:... (b) Vendor Surveillance Check Plan." Contrary to the above, the vendor surveinance files did not have a Vendor Surveillance Check Plan for Quality Control Vendor Surveillance Report No. 2 l for Purchase Order 201-1, Colt Industries, and did not have e Section 3 of Vendor Surveillance Check Plan for Quality Control Vendor Surveillance Report No.105 for Purchase Order 248-1 (Dravo). UE&C Corrective Action The Vendor Surveinance Representatives have been contacted and asked to The Supervising Engineer - Vendor resubmit the missing check plans. Surveillance will emphasize, during his training sessions, the requirement that the completed filled out check plans are to be submitted with the l An additional sample of the Seabrook surveillance surveillance reports. reports will be performed to determine the magnitude of this problem and j the need for additional corrective action. This win be completed by May 1, 1981. e e' c, -e-, -~~w-,. ..,-yv,,,-v-,,.w._,,r,,-we m---,-em-,3-,-w,-,r..,,,-ww%e.-.-.-.r.,--c-,-.w-,--, ---i-.-,+ - ,w.---*--==---w

~ 2_ ,,s Attachment (cont'd) C. United Engineers and Constructors (UE&C) procedure GEDP-0034 entitled, " Response to Audits, Corrective Action Requests and other Quality Assurance Reports," describes UE&C organizational responsibilities in responding to NRC inspection findings. The interfacing diagram in. Appendix A of this procedure defines the responsibility for establishing corrective action due dates on NRC audit findings as the Reliability and Quality Assurance Department. Follow up to assure the UE&C responses and ( irrective actions are completed as connaitted is also the responsibility of the Reliability and Quality Assurance Department. Contrary to this procedure, the Reliability and Quality Assurance Department did not assure that the consnitted completion date for corrective action it response to a previous NRC inspection finding was met. UE&C Corrective Action We have again reviewed UE&C's GEDP-0034 (referenced above). We judge the GEDP-0034 to adequately describe the responsibility assignment for follow-up to assure response and corrective action completion. Our own internal assessment agrees with your finding -- we did not fully implement this procedure. A UE&C Memorandum will be issued, no later than April 17, 1981, to Project Managers and those concerned with the implementation of this procedure. This Memorandum will draw their attention to the requirements of the GEDP-0034 and place emphasis on full compliance. Further, to assure action is taken as a result of the Memorandums, R&QA shall conduct a verification audit of the " file, log and follow-up" aspects of the GEDP-0034. This verification audit shall be conducted no later than May 29, 1981. l i l ~ e m ,e- ,---,--.,m-,-,-,- we-,---.-e-,-,, e-,,--, wwe -g-, e--- ,a w---,r -,g,--e}}