ML20008F900
| ML20008F900 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/27/1981 |
| From: | Bramlett L ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20008F897 | List: |
| References | |
| NUDOCS 8105120284 | |
| Download: ML20008F900 (1) | |
Text
S.
N. o
..i.
',- h DOCK ET NO.
50-313 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAstE ANO - Uni t T DATE 4 77 R1 COMPLETED BY Y e
REPORT \\lONTil March (revised)
TELEPilONE {$01) pn-lett-968-2519 fi a
55 5
5,:_j' li'cH5cc E-t D-Cause & Corrective
~~
t 0 g
o o p
No.
Daie e
.E 3 a:
I; vent
- p oj Ati;on in dE 5
j5l RcPort :
t$'0 j'"
Prevent Recurrence d
Q Ng 81 01 910102 S
432.8 C
1 None Z
ZZZZZZ Refueling W's 81-02 810318 F
1.72 C
3 None Z
ZZZZZZ Operations inadvertantly. tested the N,
manual trip switch'on the new anti-cipatory RPS trip module while attemp 4
ing to reset the modules for a*.artup.
g The modules were tagged with caution g
cards until they can be relabeled.
81-03 810319 F
3.05 G
3 None
'Z ZZZ7.ZZ The turbine tripped d'uring the replac t-ment of a blown indicator bulb in the turbine control circuit. The wrong bulb was inadvertantly used.
81-04 810319 S
.56 B
1 None Z
ZZZZZZ The unit was taken off line for the T
turbine overspeed test.
,O c=>
- 2:3 "1
2 3
4
. F; Forced Reason:
Kleihud:
Exhibit G !asteuctlims Q
A Ik nipment Failure (Explain) 14tanual fus Prepnatioc of Data S. Scheduled i
IJ4taintenance of Test 24tanual Scram.
Enir> Sheets for 1.ieensee I! vent Report Ill:RI File lNUREG-C Refueling 3 Autunutic Scram.
~
D Regulatory itestricii:m 4-Other IExplain) 01611 li-Opesator Training & Liceshe lixamination 5
E.
F.Adnunistrative Eshibii I. Same Sourec
'g G Operational Litur IExplaml 1977)
Il Other Ilisplain)
F"""
M