1CAN058103, Resubmits to Ensure Proper Docketing of Corrections Made to Monthly Operating Rept for Mar 1981

From kanterella
(Redirected from ML20008F896)
Jump to navigation Jump to search
Resubmits to Ensure Proper Docketing of Corrections Made to Monthly Operating Rept for Mar 1981
ML20008F896
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/04/1981
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20008F897 List:
References
1CAN058103, 1CAN58103, NUDOCS 8105120278
Download: ML20008F896 (1)


Text

l l

ARKANSAS POWER & LIGHT COMPANY I

POST OFFICE BOX 551 UTTLEROCK ARKANSAS 72203 (501)3714000 j

May 4, 1981 p g,.,,

'a l

g 9-bb 4

i ICAN058103 s

,s

['^

  • Mr. Nonnan M. Haller, Director 4

Office of Management and Program fnalysis (a

co U. S. Nuclear Regulatory Com.

Washington, D.C.

20555 i

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Monthly Operating Report - Correction (File: 0520.1) l Gentlemen:

In order to ensure that proper docketing of the corrections made to the March 1981 Operating Report for ANO-1 is achieved, a copy of the previously submitted correction letter and it's attachment is enclosed.

Very truly yours, l

David C. Trimble Manager, Licensing DCT:DVH:1p l

cc: Mr. G. L. Madsen, Chief Reactor Projects Branch U. S. Nuclear Regulatory Com.

Region IV 611 Ryan Plaza Drive, Suite 1000

-Arlington, Texas 76011 o8

-Mr. Victor Stello, Jr., Director Office of Inspection & Enforcement

.3 U. S. Nuclear Regulatory Com.

/

Washington, D.C.

20555 a

- ~ 4:

Ble S/2-0 2 9 6 weueER MOOLE SOUTH UTsuTIES SYSTEM

--