Text
P o
THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY IL1VMINATING BLOO. e PUSUC sOUARE o CLEVELAND. OHIO 44101 e TELEPHONE (216) 623-1350 m MAJL ADDRESS: P. O. 80X 5000 Serving Thr Best Location in the Nation Dalwyn R. Davidson 7dP s.,
[.
kf g, vice passiot~r
,p srsrew t~omeeai~o,~o cc~srauctio~
k 6
-j.
'#Y 11199;w f u' g"i. %
1 May 4, 1981 58 W E
X*A'/Qi Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Ccenission Washington, D.C. 20555 Perry Nuclear Power Plant Docket hos. 50- W0; 50-441 Energency Procedures and Training for Station Blackout Events
Dear Mr. Eisenhut:
In response to your Generic Letter 81-04, dated February 25, 1981, we submit the following inforr:ation concerning station blackout events at the Perry Plant.
1.
An event specific prot adure which addresses a station blackout event will be developed prior to initial cold licensing. This procedure will, as a MMmun, provide guidance for the concerns identified in your letter.
2.
We are actively participating in the General Electric EWR Owners Group efforts to develop symptom oriented energency precedures. These pro-cedures when drafted, will provide the correct guidance.for assuring adequate core cooling and containnent integrity for the station black-out event. The utilization of these emergency procedures, if required by plant conditions, will be concomitant with the event specific procedure for the station blackout event previously described. The emer6ency procedures will also be developed prior to initial cold licensing.
Soo/
.s
/ o
-81051202 N f
ad 1
Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Page 2 3.
Training in the use of the emergency procedures, as well as the specific station blackout procedure will be conducted on the Perry simulator prior to initial cold licensing, If you require further irforation, please let me know.
Very truly yours, s)
Dal R Davidson, Vice President System Engineering and Construction DRD: dip cc:
G. Charnoff, Esq.
D. H. Hauser, Esq.
J. Hughes, NRC Resident Inspector Nuclear Regulatory Commission Document Management Branch Washington, D. C. 20555 I
i
Dalwyn R. Davidson who, being duly sworn, deposed and said that (1) he is Vice President, System Engineering and Construction of The Cleveland Electric Illuminating Company, (2) he is duly authorized to execute and file this report on behalf of The Cleveland Electric Illuminating Company and as duly authorized agent for Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company and the Toledo Edison Company, and (3) the statements set forth therein are true and correct to the best of his knowledge, information and belief.
L
'fk.
, u ;.
alwyn R. Davidsoti
~
i Sworn to and subscribed before. me, this f~M day of MA-
,'1981.