ML20008F500

From kanterella
Jump to navigation Jump to search
Forwards Corrected Page 14.1-121k of Startup Test Programs Submitted on 810413
ML20008F500
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/15/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8104210093
Download: ML20008F500 (2)


Text

i TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II 1

April 15, 1981 Dirwotor of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Comunission Washington, DC 20555

Dear Mr. Schwencer:

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

In our letter to you dated April 13, 1981, concerning revisions to the Sequoyah Nuclear Plant-startup test programs, we inadvertently made an error in Enclosure 2.

In Table 14.1-2a, page 14.1-121k, under Power Level Escalation Testing, SU-81.I was left in and SU-18.3 was omitted. Enclosed is the corrected page 14.1-121k.

Ver*/ truly yours, TENNESSEE VALLEY AUTHORITY 1,

L. M. Mills, ger Nuolear Regulation and Safety Sworn to a d.subsor ed ber re me this /[ day of

_1981 L.e4.h j g/

Not Publio My asion Expires 9/Y/ f2 t f Enclosure

.i I /9 q

f 2j c W,i

-g e/

to u)

J0M3 an equ,, oppo,1m,

.=

o..

t i

TABLE 14.1-2a(continued)

LIST OF STARTUP TESTS-Unit 2 Test Objectives I

Tummary of Testing and Title of Test Test Prerequisite Acceptance Criteria

,i, III.

Initial Criticality and Low Power Testing (cont'd. ) '

SU-1.0 Plant Measurements-Reactor core loaded in preparation shiciding. A chemical and radio-Operational and for startup testing.

chemical program of sampling and Baseline Data analysis will be implenented coin-

~

(cont'd).

cident with core loading. Specified analyses will be performed at major steps of the startup program to gather baseline chemical /radiochem-

+

7 ical data and to de=onstrate that

'1 plant water chemistry require =ents M

can be maintained. Coincident with initial criticality, an effluent mon -

itoring and analysis program will be implemented to ensure that plant effluents potentially containing ra-dioactive materials are monitored and the effluent monitors are calibrated and operational.

w%,

IV.

Power Level Escalation Testing

[

SU-8.3 Static RCCA Drop _ _ Reactor at stable power level as Tbc test obtains thermocouple maps partial and RCCA Below specified in startup sequence moveable detector (M/D) maps, and excore Bank Position (SU-7.1).

RCC bank con-detector response with an RCCA below bant Measurements figuration as required by startup position Thermocouple maps, partial M/D sequence.

Equilibrium xenon maps, and excore detector response for the established prior to initiation of dropped rod configuration are also obtainci i

test.

RCC selector on bank con-The test is performed in a similar fashion to the< rod above bank position measurement trol.

(SU-8.2) except the RCCA is diluted into the core instead of withdrawal by boration.

t

.