.f"%
q_>
The Light Company Hen Ughnng& Pm m Box UDO Hen Texas 77001 (713)228-9211 December 30, 1980 ST-HL-AE-593 SFN: V-0110 Mr. Karl Seyfrit Director, Region IV Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012
REFERENCES:
(a) HL5P Letter ST-HL-AE-5S5 dated October 2, 1980 (b) NRC Region IV Letter c ated October 3,1980 (c: HLSP Letter ST-HL-AE-562 dated October 17, 1980 (d) NRC Region IV Letter dated October 22, 1980
Dear Mr. Seyfrit:
South Texas Project Units 152 Docket Nos. STN 50-498, STN 50-499 Resumption of Safety-Related AWS Welding In accordance with References (a) and (b), AWS safety-related welding was re-started on a limited basis on October 6, 1980.
Production welding was expanded on October 24, 1980, in accordance with a twelve week work plan submitted and authorized via References (c) and (d) respectively.
The welding described on the twelve week work plan has been completed except for the cable tray support welding shown on lines A through E on the plan.
Cable tray support welding is continuing and will be integrated into the project construction schedule.
It is felt that the AWS safety-related welding performed to date has verified that the corrective actions committed to in our response to the NRC Order to Show Cause are adequate and are being satisfactorily imple-mented.
Specifically, the welding activities performed to date have
~
verified that:
a 1.
Management systems and special procedures established to control AWS safety-related welding are being implemented.
2.
Training of personnel is adequate.
3.
Staffing required to both perform and manage the work is adequate.
8104210053
Houston Lighting & Power Company Mr. Karl Seyfrit December 30, 1980 ST-HL-AE-593 Page 2 The adequacy of the corrective actions is reflected by the following:
1.
The repair rate of the AWS welding completed in accordance with References (a) through (d) has been maintained at less than 1%
2.
Reports issued by the independent third party inspector surveying the welding re-s art activities indicate that the personnal, pro-cedures, training and controls associated with AWS safety-related welding are adequate and are being properly implemented.
3.
Results of our quality assurance inspections of AWS welding performed to-date have shown that quality requirements have been met.
Our under-standing of recent NRC inspection results confirms that no items of non-compliance or deviations have been identified.
We will be ready to resume AWS safety-related welding _on a normal production basis on January 5,1981, and to integrate future AWS welding into the normal project construction schedule.
Please advise if you have any questions con-cerning this plan.
b Very truly yours, l
f o k',
r Exe tive ice President GWO/cmd
Houston Lighdng & Power Company December 30, 1980 ST-HL-AE-593 SFN: V-Ol10 Page 3 cc:
J. H. Goldberg D. G. Barker Howard Pyle R. L. Waldrop H. R. Dean D. R. Beeth J. D. Parsons G. B. Painter L. K. English A. J. Granger R. A. Frazar H. S. Phillips (NRC)
.1. O. Read (Read-Poland,Inc.)
M. D. Schwarz (Baker &Botts)
R. Gordon Gooch (Baker & Botts)
J. R. Newman (Lowenstein, Newman, Reis, Axelrad & Toll)
Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 il 1
i l
I
Houston 1.ighting & Power Company December 31, 1980 ST-HL-AE-593 SFN: V-0110 Page 4 M. L. Borchelt Executive Vice President Central Power 5 Light Company P. O. Box 2121 Corpus Christi, Texas 78403 R. L. Range
' Central Power 6 Light Company P. O. Box 2121 Corpus Christi, Texas 78403 R. L. Hancock Director of Electrical Utilities City of Austin P. O. Box 1088 Austin, Texas 78767 T. H. >Mehlenbeck City of Austin P. O. Box 1088 Austin, Texas 73767 J. B. Poston Assistant General Manager of Operations City Public Service Board P. O. Box 1771 San Antonio, Texas 78296 A. vonRosenberg City Public Service Board P. O. Box 1771 San Antonio, Texas 78296 I
~
.~
Houston Lighting & Power Company December 31, 1980 ST-HL-AE-593 SFN: V-0110 Page 5 Charles Bechoefer, Esquire Chairman, Atomic Safety & Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. James C. Lamb, III 313 Woodhaven Road Chapel Hill, North Carolina 27514 Dr. Emmeth A. Luebke Atomic Safety & Licensing Commission U. S. Nuclear Regulatory Cannission Washington, D. C. 20555 Citizens for Equitable Utilities c/o Ms. Peggy Suchorn Route 1, Box 1584 Brazoria, Texas 77422 Pat Coy Citizens Concerned About Nuclear Power 5105 Casa Oro San Antonio, Texas 77422 Betty Wheeler Hoffman, Steeg & Wheeler 1008 S. Madison Amarillo, Texas Brian E. Rerwick Assistant Attorney General for the State of Texas l
P. O. Box 12548 Capitol Station Austin, Texas 78711 Bernard M. Bordenick Hearing AttornJy Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l
l i
l l
l l
i i