ML20008F401

From kanterella
Jump to navigation Jump to search
Forwards Revised Safeguards Contingency Plan.Plan Withheld (Ref 10CFR2.790)
ML20008F401
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/10/1981
From: Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8103130242
Download: ML20008F401 (3)


Text

.

PHILADELPHIA ELECTRIC COMPANY 2301 M A RK ET STR E ET P.O. BOX 8699 1881 1981 PHILADELPHIA. PA.19101 EDW ARD G. BAUER. JR.

gggyg AN ENEn.coWNSEL EUGENE J. BRADLEY ASSOCIATE GENEMAL COUNSEL DCN ALD SLANKEN March 10, 1981 RuDeLes A.CuiLLEM E. C. KIRK H ALL T, H. M AHER CORN ELL sisTANT GEN RAL COUNSEL EDWARD J. CULLEN. JR.

JOHN F. KENN EDY. JR.

AKaisTANT COUNSEL Mr. Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing United S tates Nuclear Regula tory Commission Washington, D. C.

20555 Re:

Peach Bottom Atomic Power Station Units 2 and 3 Docket Nos. 50-277 and 50-278

Dear Mr. Reid:

Transmitted herewith are five copies of the revised j

Safeguards Contingency Plan for Peach Bottom Atomic Power i

Station Units 2 and 3 dated March, 1981.

The Safeguards l

Contingency Plan has been revised in accordance with the enclosure to your letter dated January 15, 1981.

In accordance with Section 2.790(d) of the l

l Connission's Regulations, it is hereby requested that the enclosed Safeguards Contingency Plan be withheld from public disclosure on the grounds that it contains the details of the physical security plans and procedures of a licensed facility.

g An affidav$) in support of this request is attached hereto.

c; u

Very truly your,

E3 6

ti; m

c.

c-

{5 EugefJ.[radley

--...a; EJB:mk Enclosures 81081gg 1

COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF PHILADELPHIA S. L. DALTROFF, being first duly sworn, deposes and states as follows:

1.

He is Vice President of Philadelphia Electric Company (hereinafter referred to as the " Company"); he is authorized to execute this Affidavit on behalf of the Company; and he has read the revised Safeguards Contingency Plan dated March,1981, for Peach Bottom Atomic Power Station (hereinaf ter referred to as "the Document"), and knows the contents thereof.

2.

The Document which is sought to be withheld from public disclosure contains details of the physical security plans for Peach Bottom Atomic Power Station.

3.

To the best of his knowledge, information and belief, the information set forth in the Document has been treated as confidential and proprietary information and has been withheld from public disclosure by the Company in accordance with the Company's practice of treating all information dealing with the details of security plans and procedures as confidential and proprietary information.

o 4.

The Document should be considered by the Nuclear Regulatory Commission as confidential and proprietary informa-tion and be withheld from public disclosure on the grounds that it contains details of the physical security plans and procedures for a licensed facility, such disclosure is not required in the public interest, and such disclosure would adversely affect the interest of Philadelphia Electric Company.

/

//

/

If

~

l[

d',

/

\\

Subscribed and sworn to A

before me this 10 day of March, 1981.

N k.

N cit %

b ywuc.m.5 % 1c

/ iggg y 1

L ene.

W Comadescon Expires Jan.3(L 1982 m.

9