ML20008E731
| ML20008E731 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 03/02/1981 |
| From: | Cunningham G GENERAL ELECTRIC CO. |
| To: | John Miller Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8103090539 | |
| Download: ML20008E731 (2) | |
Text
-.
9
,,g.-*
GINIR AL h ELECTRIC ENGINEERING GENERAL ELECTRIC COMPANY, P.O. BOX 460. PLEASANTON. CALIFORNIA 94566 DIVISION
\\'
7 Q
.;N(
March 2,1981
- g. ).
@. F L
N 81DLl L
h ;,',l\\R0 G198 4
Mr. James R. Miller, Chief i
v.s. act y l $ ^ # N i
^
Standardization & Special Projects Branch E
Division of Licensing 4
U. S. Nuclear Regulatory Commission 4
e
- N ,
Washington, D. C.
20555 Ref:
License R-33 l
Docket 50-73
Dear Mr. Miller:
Enclosed is a list of documents that have been or are planned to be submitted to the Nuclear Regulatory Commission in relation to the license renewal for the General Electric Nuclear Test Reactor, License R-33, Docket 50-73. As you will note, all requested documents have been sub-mitted except for the Safety Analysis Report and Technical Specifications.
The latter are planned to be submitted by April 30, 1981.
Sincerely, hbf-G. E. Cunningham Sr. Licensing Engineer Encls.
/jp 0
\\
810sogo 53c
l l
y
~
l NUCLEAR TEST REACTOR i
4 I
LICENSE RENEWAL DOCUMENTS j
[
f 1.
Items Previously Submitted:
i A.
Letter, R. W. DarmItzel, GE, to H: ?. Denton, NRC, I
l Renewal Application, 6/13/79.
1.
Check for $20,000
[
2.
Copies of site-wide VNC Emergency Plan 3.
Reactor Operator Requalification Training Program, NED0-12724, May, 1979 i
4.
Physical Security Plan l
)
NOTE:
Item 1.A.3. was approved per a letter from P. F. Collins, NRC, to G. E. Cunningham, GE, on 12/10/79.
i B.
Letter, R. W. Darmitzel, GE, to Steve Ramos, NRC, j
Financial Information, 6/19/79.
1.
States GE annual reports have been filed each year under Docket 50-73.
2.
States a letter.by Dr. R. H. Beaton has been filed under Docket 50-73 committing resources to the NTR.
C.
Letter, G. E. Cunningham, GE, to Steve Ramos, NRC, i
Environmental Impact Appraisal, 8/3/79.
D.
Letters, G. E. Cunningham, GE, to H. R. Denton, NRC, Revised Security Plan, 11/5/79, 1/25/80, 2/11/80 and 5/19/80.
e 1.
Revised the security plan in whole or in part.
f c
2.
Current submittal is dated May,1980, " Security Plan for the l
Protection of Reactor Facilities Under License R-33".
2.
Items To Be Submitted:
[
1 A.
Revised Technical Specifications - proposed NRC submittal -
April, 1981, NED0-12725.
B.
Revised Safety Analysis Report - proposed NRC submittal -
April,1981, NED0-12727.
j t
1 l
CEL/DLG/2-26-81 1
l
. -, - - - - -. - -. -, -. - -.. - - -.