',* y y
S?r3bO Cy =@=.
Consumers ge Power s
James W Cook l.
nce PressJens - Projects, Engsnernng and Constructson General Offices: IC45 West Parnait Road, Jackson, MI 49201 *(517) 788-0453 T[ W January 22, 1981 s
Fx J G Keppler f[
h
' QJ US Nuclear Regulatory Cc= mission Region III TCD o ~
" 60 s
799 Roosevelt Rd
' D b.hs b
Glen Ellyn, IL 60137 Q%
v MIDIMD PROJECT CORE SUPPORT VENT VALVES - MIDIMD UNIT 2 4
b FILE:
16.3.7 UFI: 12*32*10 SERIAL: 11017 This letter vill document conversations between Consumers Power Company personnel and members of your staff on January 15, 16, 19 and 20, 1981, concerning findings by your resident inspector related to the installation of the core support vent valves for Midland Unit 2.
As a result of the observations made by your inspector on January 15, Consumers Power issued a Stop Work action regarding this specific installation on January 16. Further, as a result of our review of the situation we have or are taking the following actions:
1.
The installation procedure for this activity is being revised as appropriate to clarify the method of installation and to specify the required dimensional checks as needed. The procedure as revised vill either contain all the necessary info: :ation from the design drawing or will clearly reference which information on the design drawing is applicable to the installation process.
2.
The indoctrination and training of the personnel performing the installation of the vent valves and the QC per::onnel inspecting tha work will be reviewed and strengthened as appropriate to insure that these personnel are suitably proficient to carry out their assigned tasks.
3 The overview inspection plan for this activity will be revised to assure that problems similar to those encountered by your inspector vill be eli:1.2ated when verk is resumed.
h.
The Stop Work action vill remain in effect until the corrective actions stated in items 1 through 3 above have been reviewed by the appropriate members of your staff.
We appreciate the cooperation of your staff in working with us to resolve this matter, and we vill continue to provide them with more detailed information regarding this installation as we proceed to carry out the above and other relsted activities.
Yours very truly, duw 4).