[k COOPERAT/VE eo sox 817 LA CROSSE. WISCONSIN 54601
- 2615 EAST AV SOUTH (608) 788 4000 March 2, 1981 1
In reply, please refer to LAC-7394 DOCKET NO. 50-409 U. S. Nuclear Regulatory Commission ATTN:
Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
)
Division of Operating Reactors O
Washington, D.
C.
20555 g
SUBJECT:
DAIRYLAND POWER COOPERATIVE 1
s LA CROSSE BOILING WATER REACTOR (LACBWR) 91 t_J g
0 6 19g 4 T PROVISIONAL OPERATING LICENSE NO. DPR-45
{ "' %og,
POST TMI REOUIREMFNTS g
Reference:
(1)
NRC Letter, Eisenhut to All Operatin M-
/
4 Reactors, dated October 31, 1980.
(2)
DPC Letter, Linder to Eisenhut, LAC-735, W dated Pebruary 3, 1981.
Gentlemen:
Your issuance of NUREG-0737 (Reference 1) summarized requirements for post Three Mile Island action items.
Our response (Reference 2) specified one item, III.A.2.1 - Revised Radiological Emergency Response Plan, where the date outlined in NUREG-0737 could not be met.
In our response (Reference 2), we indicated that the revised date for completionand submittal of our revised Radiological Emergency Response Plan would be March 2, 1981.
This revision of our Radiological Emergency Response Plan will require additional time beyond that requested in Reference 2 due to contracting outside consultants to work with DPC technical staff engineers in finalizing a more thorough final draft of our Revised Radiological Emergency Response Plan which will consider all applic-able criteria specified by NUREG-0654, Rev.
1.
Our revised date for i
submission of our Revised Radiological Emergency Response Plan will be March 31, 1981.
In addition, all Revised Emergency Plan Implementing Procedures commensurate with specifications of NUREG-0654, Rev.
1, will be submitted by March 31, 1981. l closog o a%.M i
F
o Mr. Darrell G. Eisenhut, Director LAC-7394 Division of Licensing March 2, 1981 If there are any questions regarding this letter, please let us know.
Very truly yours, DAIRYLAND POWER COOPERATIVE O
0 w
~
? uvN O
n.
Frank Linder, General Manager FL:PS:af cc: