ML20008E532

From kanterella
Jump to navigation Jump to search
Forwards Organizational Charts Depicting NRC Region 3 Reorganization,Effective 810216
ML20008E532
Person / Time
Site: 05000087
Issue date: 02/20/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Scholand C
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8103090183
Download: ML20008E532 (2)


Text

&&

4 w

o FEB 2 01981 i

i l

\\ N / co t

i s-L O.?

Docket No.50-087 V,1

% glS8 m

f

'%g,gg]gh Westinghouse Electric Corporation ATTN:

Mr. G. W. Scholand, Manager g'

Westinghouse Nuclear s, \\. p Training Center 505 Shiloh Boulevard Zion, IL 60099 Gentlemen:

It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise may be of particular interest to you.

We believe this exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.

A wajor consideration growing out of the Three Mile Island Incident, was the need for realidament of the NRC Office of Inspection and Enforcement (IE) organizational structure. Recomradations were included in NUREG-0660, "NRC Action Plan Developed as a Result of the TMI-2 Accident." The new structure, addressed in the TMI-2 action plan, is aimed at better management of the preventive inspection program, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee management.

Reorganization of the NRC Regional Offices will become effective February 16, 1981. The enclosures show the new organizational structure for Region II!.

These charts identify supervi.ory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. There will be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.

The 24-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification System remain unchanged. New telephone extensions for the staff will be provided as they become available.

0 8103090183

9 Westinghouse Electric Corporation You will observe from the enclosed charts that the essential elements of the new organization are (1) project management including the resident inspector i

offices, (2) engineering and other technical support functions including the reactor, fuel facilities and materials programs, and (3) emergency prepared-ness.

Included on the charts are the management structure, investigative and enforcement staff, State liaison, public affairs and resident inspector program functions.

We look forward to your continued cooperation with this office, and, should I

you have questions regarding the subject of this letter please call me.

Sincerely,

-i James G. Keppler l

Director

Enclosures:

1.

Overall Region III Organization Chart 2.

Division of Resident and Reactor Project Inspection Chart 3.

Division of Engineering and Technical Inspection Chart 4.

Division of Emergency Preparedness & Operational Support Chart cc w/encls:

J. Roth, Manager Fundamentals and Training Reactor A. T. Sabo, Director, Licensing Safeguards & Safety R. P. DiPiazza - 265, License Administrator Central Files RII RIIT U

Davis /np Ketp er 2/13/81

U.S. NRC REGION III ORGANIZATION OFFICE OF TiiE DIRECTOR d

J. G. Keppler, Director A. B. Davis. Deputy Director C. W. Roy, Asst. to the Director Special Projects p

,[~

Office of Public Aff.

Enforcement and Investigation. Staff s/

R. St rasma R. Marabito J. F. Streeter, Acting Director

._O O'

(V O

k-Division of Resident and Division of Engineering and Division of Emergency (3'-

Proj ec t Inspection Technical Inspection Preparedness & Operational Sup

~[2[

R.

F. lleishnan, Acting C. E. Norelius, Acting J. A. Illnd, Act ing Director (s

Director Director te s

s Projects Branch 1 Engineering Inspection Emergency Preparedness

  • 1 Branch

& Prog. Support Branch

,\\d

~~~

R. C. Knop, Acting Chief R. L. Spessard, Chief C. J. Paperiello, Chief Projects Branch 2 Technical Inspection Administrative Support

_ Branch

_ Branch G.

Florelli, Chief W. L. Fisher, Chief II. Pappas, Chief

DIVISION OF RESIDENT &

PROJECT INSPECTION R. F. Ileishman, Acting Director I

i Projects Branch 1 Projects Branch 2 R. C. Knop Acting Chief C. Florelli, Chief O&

l q;,

Reactor Projects Sec.

lA Reactor Projects Sec.

2A

  • ^

E-D. Boyd, Chief J. Konklin Acting Chief c

Big Rock Point Callaway Midland Fermi Palisades Bailly

(

Research Reactor. Fuel Kewaunee Facilities Point Beach Reactor Projects Sec.

IB Reactor Projects Sec.

2B (M

D. Ilayes, Chief R. Warnick, Chief b

D. C. Cook Davis-Besse Braidwood La rosse Byron

'#I 7 ton 1

Reactor Projects Sec.

IC Reactor Projects Sec.

2C Pb P. Reimann, Acting Chief W. 1.ittle, Chief b,

v Clinton Duane Arnold Dresden Marble 11111 La Salle Monticello Quad-Cities Prairie Island

DIVISION OF ENGINEERING AND TECilNICAI. INSPECTION C. E. Norelius, Acting Director Materials Licensing Operator Licensing Sec Section J. Cooper, Jr., Chief (Vacant) l Engineering Inspection Branch Technical Inspection Branch R. L. Spessard, Chief W. L. Fisher, Chief h

A Hanagement Programs Section Materials RAD Protection

~sSection I g

K. Baker, Chief QA, Procedures D. Wiedeman, Acting Chief Maintenance Surveillance Testing Training Materials RAD Protection Plant Systems Section Sectinn 2 C. Willlams, Chief D. Sreniawski, Acting Chief h

Electrical /16C Fire Protection Civil C3 Facilities RAD Protection Section m

N Materials & Processes Sec.

R. Greger, Acting Chief D. Danielson, Chief Q

Welding, NDE, ISI Mechanical Safeguards Sectton J. Creed, Acting Chief Test Procram Sect ion

1. Jackiw, Acting Chief Preop Test, Refueling, I I.RT, Startup Tests, and Physics

DIVISION OF EMERCENCY PREPAREDNESS J

AND OPERATIONAL SUPPORT J. A. liind, Acting Director Emergency Preparedness State Liaison Officer Licensing Branch W. B. Henczer J. Pagliaro t

l Administrative Support Pr.

,_,/

Emergency Preparedness &

Performance q.

Program Support Branch Appraisal

<C25, _

C. J. Paperiello, Chief Branch II. Pappas. Chief s_s Independent Measurements ami Environmental Protectinn Sec.

V M. Schumacher, Acting Chief

j j Labs and Verification Program Environmental Inspection i

Emergency Preparedness Section W. Axelson, Acting Chief s

2 Emergency Preparedness Incident Response

(]73 Emergency Plans / Drills Operational Support Section

~

T. Tambling, Acting Chief Phnagement Informations Systems, SALP, Event Review, !!ulletins, Circulars, Notices i-.

-