ML20008E516

From kanterella
Jump to navigation Jump to search
Forwards Organizational Charts Depicting NRC Region 3 Reorganization,Effective 810216
ML20008E516
Person / Time
Site: 07001220, 07001308, 07001309
Issue date: 02/20/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Van Hoomissen
GENERAL ELECTRIC CO.
References
NUDOCS 8103090142
Download: ML20008E516 (2)


Text

-__

t'

d. '/

A yggg M vL L LLP t

  • v

,,I

~

f.,$/'./(l? " /

  • N 8

Docket No. 70-1308 s

Docket No. 70-1309 c

8 d;

Docket No. 70-1220 General Electric Company f q 8g

[

8 / g y, '

ATTN:

Mr. J. E. Van Heomissen Mans er, Spent Fuel dc./

j Services Operation

's hq 175 Curtner Avenue s

San Jose, CA 95125 Gentlemen:

[

It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise may be of particular interest to you.

We believe this exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.

A major consideration growing out of the Three Mile Island Incident, was the need for realignment of the NRC Office of Inspection and Enforcement (IE) organizational structure. Recommendations were included in N1: REG-0660, "NRC Actica Plan Developed as a Result of the TMI-2 Accident." The new structure, addressed in the TMI-2 action plan, is aimed at better management of the preventive inspection program, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee management.

Reorganization of the NEC Regional Offices will become effective February 16, 1981. The enclosures show the new organizational structure for Region III.

These charts identify supervisory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. There will be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.

The 24-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification Systsm cemain unchanged. New telephone extensions for the staff will be provided as they become available.

l 810809 0 M C

= _ _ _

=

tt LUPY j

_ _ _... i i l

2-General Electric Company You will observe from the enclosed charts that the essential elements of the new organization are (1) project management including the resident inspector offices, (2) engineering and other technical support functions including the reactor, fuel facilities and materials prograt, and (3) emergency prepared-i Included on the charts are the managem(nt structure, investigative ness.

and enforcement staff, State liaison, public affairs and resident inspector program functions.

t We look forward to your continued cooperation with this office, and, should you have questions regarding the subject of this letter please call me.

I i

Sincerely, i

t James G. Keppler i

Director

[

i

Enclosures:

1.

Overall Region III Organization Chart 2.

Division of Resident and Reactor Project Inspection Chart 3.

Division of Engineering and Technical Inspection Chart 4.

Division of Emergency Preparedness & Operational Support Chart i

cc w/encls:

E. E. Voiland, Manager, Morris Operation D. M. Dawson, Manager, Licensing and Transportation Fuel Recovery Operations Central Files RIII RIII Davis /np Keppler 2/13/81 e

n

,n

.- g


m-n g

U.S. NRC REGION III ORGANIZATION OFFICE OF Tile DIRECTOR J. G. Keppler Director A. B. Davis, Deputy Director C. W. Roy, Asst. to the Director Special Projects c

k office of Public Aff.

Enforcement and Investigation Staff R. Strasma A_

R. Marabito J. F. Streeter, Acting Director NJ e.

D g.

O Q

Division of Resident and Division of Engineering and Divistoin of Emergency Project inspection Technical Inspection Preparedness & Operational Sup CV, (J

R.

F. Ileishnin, Act ing C.

E. Norellus, Acting J. A. Illnd. Act ing Di rector Director Director b

(

Projects Branch 1 Engineering Inspection Emergency Preparednes's

~

1 Pr0E. Support Branch R. C. Knop, Acting Chief R.

l.. Spessard, Chief C. J. Paperiello, Chief Projects Mranch 2 Technical Inspection Administrative Support Branch Branch G.

Fiorel11, Chief W. l.. Fisher, Chief II. Pappas, Chief j

l l

i DIVISION OF RESIDENT &

PROJECT INFPECTION l

R. F. Ile ishman, Acting Director I

c) e-Projects Branch 1 Projects Branch 2 O

R. C. Knop, Acting Chief G.

Florelli, Chief u

Q.Y C

Reactor Projects Sec.

IA Reactor Projects Sec.

2A p

D. Boyd, Chief J. Konklin, Acting Chief O'

Big Rock Point Callaway C/-

Midland Fermi Q

Palisades Bailly Research Reactor, Fuel h aunee O-Facilities Point Beach h!

$ w Reactor Projects Sec.

IB Reactor Projects Sec.

2B

%'~.

D. Ilayes, Chief R. Warnick, Chief n

D. C. Cook Davis-Bes se Braidwood La Crosse:

Byron Perry 71on Zimmer Reactor Projects Sec.

IC Reactrr Projects Sec.

2C

~

F.

Heimann, Acting Chi f W. I.ittle, Chief Clinton Duane Arnold Dresden Earble 11111 La Salle Monticello Quad-Ci t ies Prairie Island

DIVISION OF ENGINEERING AND TECllNICAI. INSPECTION C.

E. Norelius, Acting Director I

Materials Licensing Operator Licensing Sec Section J. Coo pe r, J r., Chief (Vacant)

En ginec a:fa,g Inspect, Ion Branch Technical Inspection Branch R. L. Spessard, Chief W. L.

Fisher, Chief r ~-

D dd:-)

Flana gement Programs Sect ion Materials RAD Protection s_

Section I K. Baker, Chief

(

9{~~

QA, Procedu res D. Wiedeman, Acting Chief Maintepance

()

Surveillance Testing Training Plant Systems Section Materials RAD Protection ilm_

C. Williams, Chief Section 2 D. Sreniawski, Act ing Ch*ef

($h Electrical /I6C g tj Fire Protection Civil

{;i Facilities RAD Protection

,s_

%~~

Section Materials & Processes Sec' r~s R. Grege, Acting Chief t,

p3 D.

Danielson, Chief (w

Welding, NDE, ISI k,;,3i Mechanical Sa feguards Sect ion

\\J J. Creed Acting Chief Iggt Prouram Section I. Jackiw, Acting Chief Preop Test, Refueling, I I.RT,

Startup Tests, and Physics

DIVISION OF EMERGENCY PREPAREDNESS AND OPERATIONAL, S!!PPORT J. A. Ilind, Acting Director 9

Emergency Preparedness State Liaison Officer Licensing Branch W.

B. Menczer J. Pagtlaro 1

1 I

Administrative Support Br.

Emergency Preparedness &

Performance Program Support Ilra nch Appraisal C. J. Paperiello, Chief Branch 11. Pappas, Chief

--.d cc"

~

Independent Heasurements and v

Environmental Protection Sec.

_I M. Schumacher, Acting Chief T

Labs and Verification Program

~C/ O Environmental Inspection

'I h

Emergency Preparedness Section

'LD

~

W. Axelson, Acting Chief gf.

Emergency Preparedness G

Incident Response Emergency Plans / Drills 6

{ t)

{';

Operational Support Section u'

T. Tambling, Actiny hief flinagement Informat,

. Systems, SALP, Event Review, lin! 4 t i ns,

Circulars, Notices

--