ML20008E507

From kanterella
Jump to navigation Jump to search
Forwards Organizational Charts Depicting NRC Region 3 Reorganization,Effective 810216
ML20008E507
Person / Time
Site: Dow Chemical Company
Issue date: 02/20/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Rampy L
DOW CHEMICAL CO.
References
NUDOCS 8103090119
Download: ML20008E507 (2)


Text

R i

mbt 01981 IN' N'

l?

p/

A i, o., 98g Docket No. 50-264 g

Dow Chemical U.S.A.

i

/

k ATTN:

Dr. L. W. Rampy, Chaionan i.N

//

Radiation Safety Committee 4

y

!4_n f W

1803 Building Midland, MI 48640 Gentlemen:

It has been our policy to keep you informed of matters which are important to continued cooperation or which otherwise c..

be of particular interest to you.

We believe this exchange of information has proved beneficial to both you and the Commission. This letter is in keeping with that policy.

A major consideration growing out of the Three Mile Island Incident, was the need for realignment of the NRC Office of Inspection and Enforcement (IE) organizational structure. Recommendations were included in NUREG-0660, "NRC Action PI n Developed as a Result of the TMI-2 Accident." The new structure, addressed in the TMI-2 action plan, is aimed at better management of the preventive inspection program, quicker and more efficient response to emergencies, and closer working relationships with the States and licensee management.

Reorganization of the NRC Regional Offices will become effective February 16, 1981. The enclosures show the new organizational structure for Region III.

These charts identify supervisory and other key personnel who will be cogni-zant of licensed activities, State programs and other functions. There will be no resident inspector reassignments; however, in some areas supervision responsible for certain resident inspector offices has been changed.

The 24-hour NRC Region III telephone number (312-932-2500) and the Emergency Notification System remain unchanged. New telephone extensions for the staff will be provided as they become available.

8108090 #

P

I c

t Dow Chemical U.S.A.

-2 i

You will observe from the enclosed charts that the essential elements of the new organization are (1) project management including t*

?sident inspector offices, (2) engineering and other technical support ons including the reactor, fuel facilities and materials programs, ans mergency prepared-ness.

Included on the charts are the management str.cture, investigative and. enforcement staff, State liaison, public affairs and resident inspector program functions.

We look forward to your continued cooperation with this office, and, should you have questions regarding the subject of this letter please call me.

Sincerely, James G. Keppler Director i

Enclosures:

1.

Overall Region III Organization Chart 2.

Division of Resident and Reactor Project Inspection Chart 3.

Division of Engineering and Technical Inspection Chart 4.

Division of Emergency Preparedness & Operational i

Support Chart cc w/encls:

Dr. O. V. Anders, Reactor Supervisor l

J. M. Macki, Chairman TRIGA Reactor Operations Committee r

Centr,a1 Files r

P i

RIII RIjg,,

c/t ou Davis /np Kd)pler 2/13/81

U.S. NRC REGION III ORGANIZATION o

I l

OFFICE OF Tile DIRECTOR l

J. G. Keppler, Director A. B. Davis, Deputy Director C. W. Roy, Asst. to the Director Special Projects Enforcement and Office of Public Aff.

Investigation Staff R. Strasma R. Harabito J.

F. Streeter, Acting

(~~.

Director c3_v

~,

%i C]\\

L C

Division of Resident and Division of Engineering and Division of Emergency (jd Project Inspection Technical Inspection Preparedness 6 3perational Sup FNEl R.

F. lleishman, Acting C. E. Norellus, Acting J. A. Illnd, Acting Director

'N Director Director C>

(Q (I'

?

Projects Branch 1 Engineering Inspection Emergency Preparedness

& Prog. Support Branch Branch

~

R. C. Knop, Acting Chief R. L. Spessard, Chief C. J. Paperiello, Chief Administrative Support Projects Branch 2 Technical Inspection

_ !!ranc_h

_Hranch C.

Florelli, Chief W. L.

Fisher, Chief II. Pappas, Chief

DIVISION OF PESIDENT 5 PROJECT INSPECTION R.

F. Ileishman, Acting Director l

Projects Branch 1 Projects Branch 2 R. C. Knop, Acting Chief G.

Fiorelli, Chief Reactor Projects Sec.

IA Reactor Projects Sec.

2A

\\

D. Boyd, Chief J. Konklin, Acting Chief N

Big Rock Point Callaway V

Midland Fermi Palisades Bailly Research Reactor, Fuel Kewaunee ls/

Facilities Point Beach

'n'. ?

Reactor Projects Sec.

IB Reactor Projects Sec.

2B

(-

D. Ilayes, Chief R. Warnick, Chief C' '>

N, (N

D. C. Cook Davis-Besse E'

Braidwood La Crosse Byron Perry p

Zion Zimmer Reactor Projects Sec.

IC Reactor Projects Sec.

2C n

~

F.

Reimann, Acting Chief W. Little, Chief Clinton Duane Arnold Dresden Marble 11111 la Salle Monticello Quad-Cities Prairie Island

v DIVISION OF ENGINEERING AND TECilNICAI INSPECTION s

___l}

C. E. Norelius, Acting Director Materials Licensing operator Licensing Sec

~

. z

-L-Section 2([

J. Cooper, Jr., Chief (Vacant)

N.v I

Engineering Inspection Branch Technical Inspection Branch t

R. L. Spessard, Chief W. L. Fisher, Chief jg Hanagement Programs Section Materials RAD Protection Section 1 2,,,

K. Baker, Chief (s

QA, Procedures D. Wiedeman, Acting Chief g g3 Maintenance

(>

Surveillance Testing

{

Training Materials RAD Protection Plant Systems Section Section 2

\\s; C. Williams, Chief D. Sreniawski, Acting Chief (3'

Electrical /16C Fire Protection Civil Facilities RAD Protection 8"CEI "

~~~

Materials & Processes Sec.

"E" ' ^

"E D. Danielson, Chief Welding, NDE, ISI Mechanical Sa feguards Sect ion J. Creed, Acting Chief Test Proeram Section I. Jackiw, Acting Chief Preop Test, Retueling, 11.RT,

Startup Tests, and Physics

e l

DIVISION OF EMERGENCY PREPAREDNESS Q

AND OPERATIONAL SUPPORT N

J. A. Ilind, Acting Director y

V Emergency Preparedness State Liaison Officer Licensing Branch W.

B. Menczer

('

J. Pagliaro 4

4 p-l Qu l

C Administrative Support Br.

Q Energency Preparedness &

Performance Program Support Branch Appraisal

~-

i C..I. Paperiello, Chief liranch II. Pappas, Chief s

i

[\\

Independent Measurements and

/'

Environmental Protection Sec.

M. Schumacher, Acting Chief Labs and Verification Program Environmental Inspection Emergency Preparedness Section W. Axelson, Acting Chief Emergency Preparedness Incident Response Emergency Plans / Drills i

Operational Support Section l

T. Tambling Acting Chief Management Informations Systems, SAI.P, Event Review, liu l l e t i ns,

Circulars, Notices

_.. -