- pO 6tr u
UNITED STATES
[' gr [oj NUCLEAR REGULATORY COMMISSION y
.'..E WASHINGTON, D. C. 20555
%,..O [p/
C October 24, 1980
..+
Charles Bechhoefer, Esq., Chairman Mr. Gustave A. Linenberger Atomic Safety and Licensing Board Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Washington, D.C.
20555 Dr. Frederick P. Cowan 6152 N. Verde Trail Apt. B-125 Boca Raton, Florida 33433 In the Matter of Consumers Power Company (Midland Plant, Units 1 and 2)
Docket Nos. 50-329-0M, OL and 50-330-0M, OL Gentlemen:
At the prehearing conference on September 10, 1980, Applicant's coun';el stated his expectation that he would be able to conclude discovery within sixty days (Tr. 399). Staff counsel responded that completion in sixty days was possible but that would be an absolute minimum (Tr. 402).
Applicant and Staff are now engaged in extensive discovery.
It appears to the Staff now that discovery will take substantially longer than sixty days.
We will report to the Board periodically the status of discovery proceedings.
Sincerely,
(
William D. Paton Counsel for NRC Staff cc: Frank J. Kelley, Esq.
Myron M. Cherry, Esq.
Ms. Carol Gilbert Ms. Mary Sinclair Mr. William A. Thibodeau Michael I. Miller, Esq.
Mr. Terry R. Miller James E. Brunner, Esq.
Atomic Safety and Licensing Ms. Barbara Stamiris Board Fanel Mr. Steve Gadler.
Atomic Safety and Licensing Wendell.H. Marshall Appeal Board Panel Mr. Michael A. Race Docketing and Service Section Ms. Sandra D. Reist Ms. Sharon K. Warren Mr. Patrick A. Race Mr. George C. Wilson, Sr.
801027o TO 3 b