Responds to NRC Re Violations Noted in IE Insp Repts 50-348/80-24 & 50-364/80-31.Corrective Actions: Personnel in Chemistry Section Have Been Reinstructed in Requirement of AP-1 & AP-7
ML20008E057
Person / Time
Site: Farley  
Issue date: 09/26/1980
From: Clayton F
ALABAMA POWER CO.
To: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20008E042 List:
References
NUDOCS 8010240134
Download: ML20008E057 (2)


Text

W Post oftaca Bo:: 2641 Birmingham, Alabcm2 35291 i

T;i:phiro 203 250-1000

-lJ.'

6 7po F.L.C YTON, JR.

Senior Vice President aFEP29 A 8: 50

% 3h3y3 g,g the soutnem eictnc system t

September 26, 1980 J. M. Farley Nuclear Plant NRC Inspection of August 12-14 t

, 1980 Mr.

J. Philip Stohr U.S.

Region IINuclear Pegulatory Commission 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 RE:

RII:

DMM 50-348/80-24 50-364/80-31

Dear Mr. Stohr:

ject inspection report which states:This letter refers to ciency in the sub-e "As required by Technical Specificati written procedures shall be establishedons 6.8.1 and 6.8.2, in Appendix "A" of Regulatory Guide 1 33 maintained coverin res recommended and each procedure and administrative pro,c d November, 1972 temporary changes shall be reviewed dix A of Regulatory Guide 1.33 stattion as set fo e ure including c

cation 6.5.

Appen-the nature and frequency of sampliand radiochem r

ten to prescribe calibration of laboratory equipmentthese proced oratory instructions and Contrary to the above, during the p

August, tion step of Procedure FNP-0-CP-1041980, unreviewe mination of Fluoride Ion in Aqueous,SolutiPotentiometric Dete e calibra-

Response

ons."

in the latter part of July or earlThe deficiency in CC y the Plant Staff y part of August, 1980, CAL COPY

....e...

,h em w e-me e

w.g 4.

..enw.,w m e omg

Mr.h.P.

Stohr Septrmber 26, 1980 Page.Two A change to CCP-4 was drafted andduring a e y related procedures.

in early August backlog of. typing a temporary change (prior to the N

-i 22, 1980, I

Due to and was approved on September 3, 1980was prepared on Au in the requirements of AP-1, Personnel in the ch

" Development,n have been reinstructe Approval of Plant Procedures" cedural changes. Reporting" which contain the pro, and AP-7 Review, and

~

ve Act per method of making proion 2

sidered to be of a proprietary natureThe informatio subject report is not con-t

+b Very truly

urs, l

L.

FLCJr/JRC:nac Clayton, Jr.