W Post oftaca Bo:: 2641 Birmingham, Alabcm2 35291 i
T;i:phiro 203 250-1000
-lJ.'
- 6 7po F.L.C YTON, JR.
Senior Vice President aFEP29 A 8: 50
% 3h3y3 g,g the soutnem eictnc system t
September 26, 1980 J. M. Farley Nuclear Plant NRC Inspection of August 12-14 t
, 1980 Mr.
J. Philip Stohr U.S.
Region IINuclear Pegulatory Commission 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303 RE:
RII:
DMM 50-348/80-24 50-364/80-31
Dear Mr. Stohr:
ject inspection report which states:This letter refers to ciency in the sub-e "As required by Technical Specificati written procedures shall be establishedons 6.8.1 and 6.8.2, in Appendix "A" of Regulatory Guide 1 33 maintained coverin res recommended and each procedure and administrative pro,c d November, 1972 temporary changes shall be reviewed dix A of Regulatory Guide 1.33 stattion as set fo e ure including c
cation 6.5.
Appen-the nature and frequency of sampliand radiochem r
ten to prescribe calibration of laboratory equipmentthese proced oratory instructions and Contrary to the above, during the p
- August, tion step of Procedure FNP-0-CP-1041980, unreviewe mination of Fluoride Ion in Aqueous,SolutiPotentiometric Dete e calibra-
Response
ons."
in the latter part of July or earlThe deficiency in CC y the Plant Staff y part of August, 1980, CAL COPY
....e...
,h em w e-me e
w.g 4.
..enw.,w m e omg
Mr.h.P.
Stohr Septrmber 26, 1980 Page.Two A change to CCP-4 was drafted andduring a e y related procedures.
in early August backlog of. typing a temporary change (prior to the N
-i 22, 1980, I
Due to and was approved on September 3, 1980was prepared on Au in the requirements of AP-1, Personnel in the ch
" Development,n have been reinstructe Approval of Plant Procedures" cedural changes. Reporting" which contain the pro, and AP-7 Review, and
~
ve Act per method of making proion 2
sidered to be of a proprietary natureThe informatio subject report is not con-t
+b Very truly
- urs, l
L.
FLCJr/JRC:nac Clayton, Jr.
.l cc:
pile t
I f
9 s.<
..__-_f_-___--
4 g
gg, ew
..p,,_-~ "** -