ML20008D836
| ML20008D836 | |
| Person / Time | |
|---|---|
| Issue date: | 09/02/1980 |
| From: | Advisory Committee on Reactor Safeguards |
| To: | Advisory Committee on Reactor Safeguards |
| References | |
| ACRS-MS-0602, ACRS-MS-602, NUDOCS 8010230146 | |
| Download: ML20008D836 (3) | |
Text
v-
}
1 carg Q{
UNITED STATES
,(
o, fj NUCLEAR REGULATORY COMMISSION g
,\\ ^Q>.,g 3
t ADVISORY COMMITTEE ON REACTOR SAFEGUARDS S,,%,
s' g
[
WASHINGTON. D. C. 20555 Revised: September 2, 1980 SCHEDULE AND OUTLINE FOR DISCUSSION 245TH ACRS MEETING SEPTEMBER 4-6, 1980 WASHINGTON, DC Thursday, September 4,1980, Room 1046,1717 H Street, NW, Washington, DC 1) 8:30 A.M. - 9:30 A.M.
Ooening Session (0 pen) 1.1) 8:30 A.M.-8:45 A.M.:
Report of ACRS Chairman (MSP/RFF) 1.1-1)
Discuss items for meet-ing with NRC Chairman and 4
Commissioners:
1.1-1(a) Proposed NRC budget for FY 1982 Safety Research Program 1.2) 8:45 A.M-9:30 A.M.:
Report of ACRS Fluid Dynamics Subcommittee regard-ing BWR Scram Systems (MSP/ALB/GY/DZ) i 2) 9:30 A.M. - 12:30 P.M.
Boiling Water Reactor Hydraulic Scram Systems (0 pen)
(Portions of this session will be closed as necessary to discuss Proprietary In-formation related to this matter.)
12:30 P.M. - 1:30 P.M.
LUNCH 3) 1:30 P.M. - 2:15 P.M.
Report of ACRS Subcomittee on Quantitative Risk Criteria (00/GRQ) s 4) 2:15 P.M. - 7:30 P.M.
Sequoyah Nuclear Power Plan Units 1 and 2 (0 pen) 4.1) 2:15 P.M.-3:00 P.M.:
Reports of ACRS Subcommittees on matters re-lated to:
Design features of the Sequoyah Plant including results of the augmented low-power test pro-gram (JCM/RS)
Hydrogen generation and control (WK/GRQ)
Containment ability to withstand pressures resulting from hydrogen combustion / explosion (CPS /EI) 1 4.2) 3:00 P.M. - 6:45 P.M.:
Reports from and discussions with repre-sentatives of the NRC Staff and TVA 8010230/ 6
q Schedule Revised: 9/2/80 4.3) 6:45 P.M.-7:30 P.M.:
Discuss pro-posed reply to Comm. V. Gilinsky r 2-garding the ability of the Sequoyah containment to contain a hydrogen reaction of the type that occurred at TMI-2 (JCM/RS)
Friday, September 5,1980, Room 1046,1717 H Street, NW, Washingtun, DC
- 5) 8:30 A.M.
- 12:30 P.M.
Quantitative Risk Criteria - discuss proposed plans for develooing a safety goal and proposed ACRS report to NRC (0 pen) (D0/GRQ) 12:30 P.M. - 1:30 P.M.
LUNCH 6) 1:30 P.M. - 2:30 P.M.
Meeting with NRC Chairman and Commis-sioners (0 pen) 7)
2:30 P.M. - 3:20 P.M.
Review of NRC Regulatory Requirements and Reevaluation of Operating Nuclear Plants (0 pen) 7.1) 2:30 P.M.-2:40 P.M.:
Report of ACRS Subcommittee on Reactor Operations (WMM/RKM) 7.2) 2:40 P.M.-3:20 P.M.:
Report from and discussion with NRC Staff 8) 3:20 P.M. - 5:30 P.M.
Revised Clad Swelling and Rupture Model (0 pen) 8.1) 3:20 P.M.-4:10 P.M.:
Report of ACRS Subcommittee on Reactor Fuel (PGS/PB) 8.2) 4:10 P.M.-5:30 P.M.:
Report from and discussion with representa-tives of the NRC Staff (Portions of this session will be closed as necessary to discuss Proprietary In-formation related to this matter.)
9) 5:30 P.M. - 5:50 P.M.
Future Schedule (Ocen) 9.1) Anticipated ACRS activity 9.2) Anticipated Subcommittee activity
- 10) 5:50 P.M. - 6:15 P.M.
Candidates for Appointment to the ACRS (Closed) (DWM/JE/MCG)
w AU 'lt..
, Revised: 9/2/80 M edule Saturday, September 6,1980, Room 1046,1717 H Street, NW, Washington, DC 11) 8:30 A.M. - 4:00 P.M.
Concluding Session (0 pen) 11.1) 8:30 A.M.-12:30 P.M.:
Discuss pro-posed ACRS reports on:
11.1-1) BWR scram systems 11.1-2) Quantitative risk criteria 11.1-3) Clad swelling and rupture model 11.1-4) Sequoyah Nuclear Power Plant Units 1 & 2 (tentative) 11.1-5) Proposed revision of NRC Rule on Fire Protection (MB/JCM) 11.2) 1:30 P.M.-2:30 P.M.:
Discuss pro-posed ACRS comments / positions on:
11.2-1) Inquiry from Mr. Mark P.
Oncavage regarding steam generator tube degradation at Turkey Point Nuclear Plant (PGS/EI)
(0 pen) 11.2-2) Clarification of ACRS re-port dtd. 4/16/80 on ATWS (WK/PAB) 11.3) 2:30 P.M.-4:00 P.M.:
Report of ACRS Subcommittee on Regulatory Philosophy, Technology and Criteria regarding cascading failures in nu-clear plants and application of NRC action plan items to NTCP's, etc.
(D0/RS) l l