ML20008D836

From kanterella
Jump to navigation Jump to search
Revised Schedule & Outline of Discussion for 245th ACRS 800904-06 Meeting in Washington,Dc
ML20008D836
Person / Time
Issue date: 09/02/1980
From:
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
ACRS-MS-0602, ACRS-MS-602, NUDOCS 8010230146
Download: ML20008D836 (3)


Text

v-

}

1 carg Q{

UNITED STATES

,(

o, fj NUCLEAR REGULATORY COMMISSION g

,\\ ^Q>.,g 3

t ADVISORY COMMITTEE ON REACTOR SAFEGUARDS S,,%,

s' g

[

WASHINGTON. D. C. 20555 Revised: September 2, 1980 SCHEDULE AND OUTLINE FOR DISCUSSION 245TH ACRS MEETING SEPTEMBER 4-6, 1980 WASHINGTON, DC Thursday, September 4,1980, Room 1046,1717 H Street, NW, Washington, DC 1) 8:30 A.M. - 9:30 A.M.

Ooening Session (0 pen) 1.1) 8:30 A.M.-8:45 A.M.:

Report of ACRS Chairman (MSP/RFF) 1.1-1)

Discuss items for meet-ing with NRC Chairman and 4

Commissioners:

1.1-1(a) Proposed NRC budget for FY 1982 Safety Research Program 1.2) 8:45 A.M-9:30 A.M.:

Report of ACRS Fluid Dynamics Subcommittee regard-ing BWR Scram Systems (MSP/ALB/GY/DZ) i 2) 9:30 A.M. - 12:30 P.M.

Boiling Water Reactor Hydraulic Scram Systems (0 pen)

(Portions of this session will be closed as necessary to discuss Proprietary In-formation related to this matter.)

12:30 P.M. - 1:30 P.M.

LUNCH 3) 1:30 P.M. - 2:15 P.M.

Report of ACRS Subcomittee on Quantitative Risk Criteria (00/GRQ) s 4) 2:15 P.M. - 7:30 P.M.

Sequoyah Nuclear Power Plan Units 1 and 2 (0 pen) 4.1) 2:15 P.M.-3:00 P.M.:

Reports of ACRS Subcommittees on matters re-lated to:

Design features of the Sequoyah Plant including results of the augmented low-power test pro-gram (JCM/RS)

Hydrogen generation and control (WK/GRQ)

Containment ability to withstand pressures resulting from hydrogen combustion / explosion (CPS /EI) 1 4.2) 3:00 P.M. - 6:45 P.M.:

Reports from and discussions with repre-sentatives of the NRC Staff and TVA 8010230/ 6

q Schedule Revised: 9/2/80 4.3) 6:45 P.M.-7:30 P.M.:

Discuss pro-posed reply to Comm. V. Gilinsky r 2-garding the ability of the Sequoyah containment to contain a hydrogen reaction of the type that occurred at TMI-2 (JCM/RS)

Friday, September 5,1980, Room 1046,1717 H Street, NW, Washingtun, DC

5) 8:30 A.M.

- 12:30 P.M.

Quantitative Risk Criteria - discuss proposed plans for develooing a safety goal and proposed ACRS report to NRC (0 pen) (D0/GRQ) 12:30 P.M. - 1:30 P.M.

LUNCH 6) 1:30 P.M. - 2:30 P.M.

Meeting with NRC Chairman and Commis-sioners (0 pen) 7)

2:30 P.M. - 3:20 P.M.

Review of NRC Regulatory Requirements and Reevaluation of Operating Nuclear Plants (0 pen) 7.1) 2:30 P.M.-2:40 P.M.:

Report of ACRS Subcommittee on Reactor Operations (WMM/RKM) 7.2) 2:40 P.M.-3:20 P.M.:

Report from and discussion with NRC Staff 8) 3:20 P.M. - 5:30 P.M.

Revised Clad Swelling and Rupture Model (0 pen) 8.1) 3:20 P.M.-4:10 P.M.:

Report of ACRS Subcommittee on Reactor Fuel (PGS/PB) 8.2) 4:10 P.M.-5:30 P.M.:

Report from and discussion with representa-tives of the NRC Staff (Portions of this session will be closed as necessary to discuss Proprietary In-formation related to this matter.)

9) 5:30 P.M. - 5:50 P.M.

Future Schedule (Ocen) 9.1) Anticipated ACRS activity 9.2) Anticipated Subcommittee activity

10) 5:50 P.M. - 6:15 P.M.

Candidates for Appointment to the ACRS (Closed) (DWM/JE/MCG)

w AU 'lt..

, Revised: 9/2/80 M edule Saturday, September 6,1980, Room 1046,1717 H Street, NW, Washington, DC 11) 8:30 A.M. - 4:00 P.M.

Concluding Session (0 pen) 11.1) 8:30 A.M.-12:30 P.M.:

Discuss pro-posed ACRS reports on:

11.1-1) BWR scram systems 11.1-2) Quantitative risk criteria 11.1-3) Clad swelling and rupture model 11.1-4) Sequoyah Nuclear Power Plant Units 1 & 2 (tentative) 11.1-5) Proposed revision of NRC Rule on Fire Protection (MB/JCM) 11.2) 1:30 P.M.-2:30 P.M.:

Discuss pro-posed ACRS comments / positions on:

11.2-1) Inquiry from Mr. Mark P.

Oncavage regarding steam generator tube degradation at Turkey Point Nuclear Plant (PGS/EI)

(0 pen) 11.2-2) Clarification of ACRS re-port dtd. 4/16/80 on ATWS (WK/PAB) 11.3) 2:30 P.M.-4:00 P.M.:

Report of ACRS Subcommittee on Regulatory Philosophy, Technology and Criteria regarding cascading failures in nu-clear plants and application of NRC action plan items to NTCP's, etc.

(D0/RS) l l

_ _