ML20008D788
From kanterella
Jump to navigation
Jump to search
ML20008D788 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 01/13/1969 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
References | |
NUDOCS 8007300700 | |
Download: ML20008D788 (250) | |
Similar Documents at Midland | |
---|---|
Category:PRELIMINARY SAFETY ANALYSIS REPORT & AMENDMENTS (PSAR
MONTHYEARML19329E8001977-12-16016 December 1977
[Table view]Revision to App 1B to Psar.Constitutes Amend 36 to CP & OL Application ML20008D7691974-07-24024 July 1974 Chapter 5 to Midland 1 & 2 PSAR, Use of Coarse Aggregate W/Varied Percentage of Matl Passing Sieve 200. Prepared for Util ML19319C2511969-08-0101 August 1969 Suppl 1 to Davis-Besse PSAR, Formal Questions from Div of Reactor Licensing & Applicants' Responses;Informal Questions from Div of Reactor Licensing & Applicants' Responses; & Discussion of Items in ACRS 700820 Ltr. ML20008D7551969-01-13013 January 1969 App 1A to Midland 1 & 2 PSAR, Glossary of Terms. Includes Revisions 1-36 ML20008D7661969-01-13013 January 1969 Chapter 4 to Midland 1 & 2 PSAR, Rcs. Includes Revisions 1-36 ML20008D7651969-01-13013 January 1969 App 3A to Midland 1 & 2 PSAR, Modal Analysis of Xenon- Induced Oscillations. Includes Revisions 1-36 ML20008D7641969-01-13013 January 1969 Chapter 3 to Midland 1 & 2 PSAR, Reactor. Includes Revisions 1-36 ML20008D7631969-01-13013 January 1969 App 2B to Midland 1 & 2 PSAR, Surface Water Hydrology. Includes Revisions 1-36 ML20008D7621969-01-13013 January 1969 App 2A to Midland 1 & 2 PSAR, Environ Study Meteorology. Includes Revisions 1-36 ML20008D7611969-01-13013 January 1969 Chapter 2 to Midland 1 & 2 PSAR, Site & Environ. Includes Revisions 1-36 ML20008D7601969-01-13013 January 1969 App 1C to Midland 1 & 2 PSAR, Principal Design Criteria. Includes Revisions 1-36 ML20008D7571969-01-13013 January 1969 App 1B to Midland 1 & 2 PSAR, QA Program. Includes Revisions 1-36 ML20008D7671969-01-13013 January 1969 Chapter 5 to Midland 1 & 2 PSAR, Reactor Bldg & Structures. Includes Revisions 1-36 ML20008D7541969-01-13013 January 1969 Chapter 1 to Midland 1 & 2 PSAR, Introduction & Summary. Includes Revisions 1-36 ML20008D7771969-01-13013 January 1969 App 5H to Midland 1 & 2 PSAR, Reactor Bldg Load Response Test. Includes Revisions 1-36 ML20008D7721969-01-13013 January 1969 App 5D to Midland 1 & 2 PSAR, Load Factors & Load Combinations. Includes Revisions 1-36 ML20008D7711969-01-13013 January 1969 App 5B to Midland 1 & 2 PSAR, Reactor Bldg Pressure Tests. Includes Revisions 1-36 ML20008D7591969-01-13013 January 1969 App 1B to Midland 1 & 2 PSAR, QA Plan for Midland 1 & 2. Prepared for Util.Includes Revisions 1-36 ML20008D7811969-01-13013 January 1969 Chapter 8 to Midland 1 & 2 PSAR, Electrical Sys. Includes Revisions 1-36 ML20008D7891969-01-13013 January 1969 App 14A to Midland 1 & 2 PSAR, Chemical Sprays. Includes Revisions 1-36 ML20008D7881969-01-13013 January 1969 Chapter 14 to Midland 1 & 2 PSAR, Safety Analysis. Includes Revisions 1-36 ML20008D7871969-01-13013 January 1969 Chapter 13 to Midland 1 & 2 PSAR, Initial Tests & Operation. Includes Revisions 1-36 ML20008D7861969-01-13013 January 1969 Chapter 12 to Midland 1 & 2 PSAR, Conduct of Operations. Includes Revisions 1-36 ML20008D7851969-01-13013 January 1969 Chapter 11 to Midland 1 & 2 PSAR, Radwastes. Includes Revisions 1-36 ML20008D7841969-01-13013 January 1969 Chapter 10 to Midland 1 & 2 PSAR, Steam & Power Conversion Sys. Includes Revisions 1-36 ML20008D7831969-01-13013 January 1969 Chapter 9 to Midland 1 & 2 PSAR, Auxiliary & Emergency Sys. Includes Revisions 1-36 ML20008D7821969-01-13013 January 1969 App 8A to Midland 1 & 2 PSAR, Separation Criteria & Administrative Procedure for Installation of Class 1E Equipment & Circuits. Includes Revisions 1-36 ML20008D7911969-01-13013 January 1969 Chapter 15 to Midland 1 & 2 PSAR, Proposed Tech Specs. Includes Revisions 1-36 ML20008D7801969-01-13013 January 1969 Chapter 7 to Midland 1 & 2 PSAR, Instrumentation & Control. Includes Revisions 1-36 ML20008D7791969-01-13013 January 1969 Chapter 6 to Midland 1 & 2 PSAR, Engineered Safeguards. Includes Revisions 1-36 ML20008D7781969-01-13013 January 1969 App 5I to Midland 1 & 2 PSAR, Design Features for High Energy Pipe Failure Outside Reactor Bldg. Includes Revisions 1-36 ML20008D7761969-01-13013 January 1969 App 5G to Midland 1 & 2 PSAR, QC Procedure for Field Welding of Liner Plate. Includes Revisions 1-36 ML20008D7741969-01-13013 January 1969 App 5F to Midland 1 & 2 PSAR, Reactor Bldg,Structural Analysis. Includes Revisions 1-36 ML20008D7731969-01-13013 January 1969 App 5E to Midland 1 & 2 PSAR, Yield Reduction Factors. Includes Revisions 1-36 ML20008D7701969-01-13013 January 1969 App 5A to Midland 1 & 2 PSAR, Design Bases for Structures, Sys & Equipment. Includes Revisions 1-36 1977-12-16 Category:TEXT-SAFETY REPORT MONTHYEARML20058L8721992-12-31031 December 1992
[Table view]1992 Annual Rept,Cpc ML20126D7211992-12-16016 December 1992 Potential Part 21 Rept Re Actual Performance of Rosemount Supplied Bailey Bq Differential Pressure Transmitters Differing from Rosemount Original Spec.Bailey Controls Encl.Evaluation Not Yet Performed ML20246N1221988-12-31031 December 1988 CMS Energy 1988 Annual Rept ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20196J3801987-12-31031 December 1987 CMS Energy Corp 1987 Annual Rept ML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20207R9041986-12-31031 December 1986 CPC 1986 Annual Rept ML20214A0951986-11-14014 November 1986 Insp & Evaluation Re Adequacy of Stabilization Plan,In Response to Util 860701 Request for Withdrawal of Applications to Extend CP & Util Motions Seeking Withdrawal of OL Application ML20215G6801986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20215G5351986-10-10010 October 1986 Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During Testing ML20205F6141986-08-13013 August 1986 Part 21 Rept Re Connecting Rod Bolts for Dsrv Engines.Listed Procedures Recommended for Next Connecting Rod Insp, Including Replacement of Bolts Due to Cracked Threads & Large Grooves & Galls in Threads ML20206U0591986-07-0202 July 1986 Part 21 Rept Re Potential Defect in Component of Dsrv Standby Diesel Generators,Involving Problem W/Fastening of Engine Connecting Rod Assembly Which Could Result in Engine Nonavailability.Procedure Will Be Issued by 860718 ML20197H2581986-05-0808 May 1986 Part 21 Rept 135 Re Defect W/Lube Oil Sump Tank Foot Valve of Standby Diesel Generator.Caused by Extrusion of Liner Matl Due to Overpressurization.Corrective Actions Being Developed.List of Affected Sites Modified ML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications ML20205N6811986-04-14014 April 1986 Final Part 21 & Deficiency Rept 86-03 Re Consolidated Pipe & Valve Supply,Inc Certified Matl Test Repts.Initially Reported on 860321.Six raised-face Orifice Flanges Statused & Segregated Per QA Procedures ML20205N7381986-04-14014 April 1986 Interim Deficiency & Part 21 Rept 86-02 1 Re Elastomer Liner in Clear Flow Co Foot Valves Used in Lube Oil Sump Tanks of Tdi Diesel Generators.Initially Reported on 860321. Action Will Not Be Pursued Unless Facility Reactivated ML20140H5991986-03-24024 March 1986 Second Interim Deficiency Rept 86-01 Re Error in Bechtel Computer Analysis Program.Initially Reported on 860121.No Corrective Actions Will Be Pursued & No Further Repts Will Be Submitted Unless Project Reactivated ML20154N3431986-03-10010 March 1986 Initial Part 21 Rept 135 Re Potential Problem W/Lube Oil Sump Tank Foot Valve of Dsrv Standby Diesel Generator for Facilities.Cause Not Determined.Recommends Utils Inspect Condition of Foot Valve Liners & Notify Tdi of Findings ML20153F5391986-02-14014 February 1986 Interim Part 21 & Deficiency Rept Re Error in Bechtel Computer Analysis Program ME101.Initially Reported on 860121.No Corrective Actions or Further Repts Will Be Submitted Until Project Reactivated ML20137N6101986-01-10010 January 1986 Interim Part 21 & Deficiency Rept 85-08 Re Isolated Failures of Betts Spring Co Intake & Exhaust Valve Springs Reported by Tdi.Initially Reported on 851218.Corrective Actions Will Be Pursued If Units Reactivated ML20141N8361985-12-31031 December 1985 CPC 1985 Annual Rept ML20138M3891985-12-12012 December 1985 Topical Rept Evaluation of Rev 1 to BAW-1847, Leak Before Break Evaluation of Margins Against Full Break for Rcs.... Rept Presents Acceptable Justification to Eliminate Dynamic Effects of Large Ruptures in Piping ML20198C4981985-11-0606 November 1985 Part 21 Rept Re Potential Defect in Dsr or Dsrv Standby Diesel Generator Intake & Exhaust Valve Springs Mfg by Betts Spring Co.Users Recommended to Inspect Engines for Broken Springs & Identify Original Mfg ML20138B9531985-10-0909 October 1985 Interim Deficiency Rept Re Larger than Anticipated Util Movement Where Freezewall Crossed safety-related Utils at Monitoring Pits 1,2,3 & 4.Initially Reported on 850917.No Action Will Be Taken ML20138C3111985-10-0808 October 1985 Interim Deficiency Rept Re Limitorque motor-operated Butterfly Valves Not Opening Electrically After Closed Manually.Initially Reported on 850912.No Corrective Actions Will Be Taken Unless Facility Reactivated ML20138C3251985-10-0808 October 1985 Interim Deficiency Rept Re Loose Set Screws on Anchor Darling Swing Check Valves & Disc Nut Pin Problems Causing Inoperability.Initially Reported on 850912.No Further Corrective Action Will Be Taken Unless Facility Reactivated ML20132B0261985-09-0303 September 1985 Part 21 Rept Re Possibility of Engine Ingestion of Unwelded Part in American Air Filter Standby Diesel Generator Intake Silencer.Immediate Hold Should Be Placed on Diesel Engines/Intake Silencers Not Yet in Svc ML20132D3191985-07-10010 July 1985 Interim Part 21 & Deficiency Rept Re Rupture During Testing by Wj Woolley Co of Inflatable Seal,Mfg by Presray Corp,Used in Personnel Air Locks in Reactor Containment Sys.Initially Reported on 850614 ML20129G0601985-04-26026 April 1985 Interim Deficiency Rept Re Potential for Cracking of Check Valves in on-engine Mounted Starting Air Piping of Tdi Diesel Generators.Initially Reported on 850401.Cause Not Determined.No Corrective Actions.Related Correspondence ML20112J3951985-03-22022 March 1985 Interim Part 21 & Deficiency Rept Re Failure of Gulf & Western MSIV Actuator Latch Roller Bearing.Matter Will Not Be Pursued Unless Plants Reactivated ML20100B6361985-01-21021 January 1985 Rept on Welding Allegations ML20114D3571984-12-21021 December 1984 Interim Deficiency Rept Re Diesel Fuel Oil Tank Soils Borings.Initially Reported on 841121.No Corrective Actions Necessary Due to Present Project Shutdown ML20100K9791984-11-27027 November 1984 Part 21 & Interim Deficiency Rept Re Ruskin Mfg Co Interlocking Blade Fire Dampers.Initially Reported on 841121.Corrective Action Will Not Be Pursued & No Further Repts Will Be Made Unless Plant Reactivated ML20100D9841984-11-21021 November 1984 Deficiency Rept Re Diesel Fuel Oil Tank Boring Logs.Util Response to Dow Chemical Co 841113 Request for Admissions Encl ML20100E2621984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Rosemount 1153 Series B Transmitters Potentially Leaking.Initially Reported on 841010.Four Units Shipped to Facilities.Corrective Actions Will Not Be Pursued ML20100E4451984-11-15015 November 1984 Interim Deficiency Rept Re Cardinal Industrial Products Corp Spare Studs Received W/O Ultrasonic Exam.Initially Reported on 841010.Corrective Actions Will Not Be Pursued Unless Midland Reactivated ML20100E2371984-11-15015 November 1984 Interim Part 21 & Deficiency Rept Re Tdi Fuel Control Level Cap Screws.Initially Reported on 841010.No Corrective Actions Will Be Pursued & No Further Repts on Subj Made Unless Midland Reactivated ML20099E3531984-11-0909 November 1984 Interim Deficiency Rept Re Small Bore Piping Anchor Design. Initially Reported on 840816.Listed Corrective Actions Will Not Be Pursued & No Further Repts Will Be Made Unless Facilities Reactivated ML20093C3211984-10-0101 October 1984 Rev 0 to QA Program Plan for Shutdown Phase ML20093H3961984-08-0202 August 1984 Interim Deficiency Rept Re Seismic Qualification of Power Supplies for Eccas & Ni/Rps Equipment.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20093H8521984-08-0202 August 1984 Interim Deficiency Rept Re Field Installation of Itt Grinnell Struts & Extension Pieces.Initially Reported on 840705.No Activity Being Currently Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20094P7631984-08-0101 August 1984 Handwritten Notes Re Auxiliary Bldg & Underpinning Design Including Settlement Stress,Results of Areas of Max Stress & Rigid Body Rotation ML20093H8111984-07-27027 July 1984 Final Part 21 & Deficiency Rept Re Capstan Springs in Mechanical Shock Arrestors Supplied by Pacific Scientific. All Suspect Shock Arrestor Capstan Springs Will Be Inspected for Cracks & Defective Springs Replaced ML20096A7781984-07-27027 July 1984 Final Deficiency Rept Re Defective Capstan Springs in Pacific Scientific Mechanical Shock Arrestors.Initially Reported on 840106.W/o Description of Investigation & Corrective Actions.Related Correspondence ML20093H8871984-07-20020 July 1984 Interim Deficiency Rept Re Reactor Coolant Pump Seals & Seal Covers.Initially Reported on 840622.No Activity Currently Being Pursued.No Further Repts Will Be Made Unless Facilities Reactivated ML20094P5651984-07-18018 July 1984 Structural Stresses Induced by Differential Settlement of Diesel Generator Bldg ML20090G2141984-07-18018 July 1984 Idcvp:Control Room HVAC Sys Performance Requirements, Draft Topical Rept ML20093H4751984-07-17017 July 1984 Interim Deficiency Rept Re Core Flood Line Piping Supports in Reactor Pressure Vessel Connection Supplied by Bechtel. Overstressing Could Occur in Pipe Supports.No Commitment Made for Further Repts 1992-12-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20008D788&oldid=4660898"