25A5675BJ Revision 7 October 2019 ABWR Design Control Document Tier 2 Chapter 21 Volume 8 Copyright 1994, 2010, 2016, 2019 GE-Hitachi Nuclear Energy Americas LLC All Rights Reserved
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Chapter 21 Volume 8 List of Figures Figure 9A.4-16 Control Building Fire Protection at Elevation 12300 mm ......................................21-776 Figure 9A.4-16a Control Building Fire Protection at Elevation 17150 mm ......................................21-777 Figure 9A.4-16b Control Building Fire Protection at Elevation 22200 mm ......................................21-778 Figure 9A.4-17 Turbine Building Fire Protection, Section A-A ......................................................21-779 Figure 9A.4-18 Turbine Building Fire Protection at Elevation 5300 mm........................................21-780 Figure 9A.4-19 Turbine Building Fire Protection at Elevation 12300 mm......................................21-781 Figure 9A.4-20 Turbine Building Fire Protection at Elevation 20300 mm......................................21-782 Figure 9A.4-21 Turbine Building Fire Protection at Elevation 30300 mm......................................21-783 Figure 9A.4-22 Service Building Fire Protection, Section B-B (See Figure 9A.4-11) ....................21-771 Figure 9A.4-23 Service Building Fire Protection at Elevation -2150 mm (See Figure 9A.4-13) ....21-773 Figure 9A.4-24 Service Building Fire Protection at Elevation 3500 mm (See Figure 9A.4-14) .....21-774 Figure 9A.4-25 Service Building Fire Protection at Elevation 7900 mm (See Figure 9A.4-15) .....21-775 Figure 9A.4-26 Service Building Fire Protection at Elevation 12300 mm (See Figure 9A.4-16) ...21-776 Figure 9A.4-27 Service Building Fire Protection at Elevation 17150 mm (See Figure 9A.4-16a) .............................................................................................21-777 Figure 9A.4-28 Radwaste Building Fire Protection, Section A-A ...................................................21-784 Figure 9A.4-29 Radwaste Building Fire Protection at Elevation -1500 mm....................................21-785 Figure 9A.4-30 Radwaste Building Fire Protection at Elevation 4800 mm .....................................21-786 Figure 9A.4-31 Radwaste Building Fire Protection at Elevation 12300 mm ...................................21-787 Figure 9A.4-32 Radwaste Building Fire Protection at Elevation 21000 mm ...................................21-788 Figure 10.1-2 Reference Heat Balance for Guaranteed Reactor Rating ........................................21-789 Figure 10.1-3 Reference Heat Balance for Valves-Wide-Open (VWO) .......................................21-790 Figure 11.2-1 Radwaste System PFD ............................................................................................21-791 Figure 11.3-1 Offgas System PFD (Sheets 1-2)............................................................................21-792 Figure 11.3-2 Offgas System P&ID (Sheets 1-3) .........................................................................21-794 Figure 12.3-1 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation -8200 mm (B3F) ................................................................21-797 Chapter 21 Figure TOC Volume 8-i
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 List of Figures (Continued)
Figure 12.3-2 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation -1700 mm (B2F) ................................................................21-798 Figure 12.3-3 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 4800/8500 mm (B1F).........................................................21-799 Figure 12.3-5 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 12300 mm (1F) ..................................................................21-800 Figure 12.3-6 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 18100 mm (2F) ..................................................................21-801 Figure 12.3-7 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 23500 mm (3F) ..................................................................21-802 Figure 12.3-8 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 27200 mm (3.5F) ...............................................................21-803 Figure 12.3-9 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 31700/38200 mm (4FM)....................................................21-804 Figure 12.3-10 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation, Section A-A...........................................................................................21-805 Figure 12.3-11 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation, Section B-B ...........................................................................................21-806 Figure 12.3-12 Reactor Building Radiation Zone Map Post LOCA at Elevation -8200 mm (B3F) .................................................................................21-807 Figure 12.3-13 Reactor Building Radiation Zone Map Post LOCA at Elevation -1700 mm (B2F) .................................................................................21-808 Figure 12.3-14 Reactor Building Radiation Zone Map Post LOCA at Elevation 4800/8500 mm (B1F)..........................................................................21-809 Figure 12.3-16 Reactor Building Radiation Zone Map Post LOCA at Elevation 12300 mm (1F) ...................................................................................21-810 Figure 12.3-17 Reactor Building Radiation Zone Map Post LOCA at Elevation 18100 mm (2F) ...................................................................................21-811 Figure 12.3-18 Reactor Building Radiation Zone Map Post LOCA at Elevation 23500 mm (3F) ...................................................................................21-812 Figure 12.3-19 Reactor Building Radiation Zone Map Post LOCA at Elevation 27200 mm (3.5F) ................................................................................21-813 Figure 12.3-20 Reactor Building Radiation Zone Map Post LOCA at Elevation 31700/38200 mm (4FM).....................................................................21-814 Volume 8-ii Chapter 21 Figure TOC
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 List of Figures (Continued)
Figure 12.3-21 Reactor Building Radiation Zone Map Post LOCA, Section A-A .........................21-815 Figure 12.3-22 Reactor Building Radiation Zone Map Post LOCA, Section B-B..........................21-816 Figure 12.3-37 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation -1500 mm ............................................................................................21-817 Figure 12.3-38 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation -4800 mm ............................................................................................21-818 Figure 12.3-39 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation 12300 mm ...........................................................................................21-819 Figure 12.3-40 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation 21000 mm ...........................................................................................21-820 Figure 12.3-41 Radwaste Building, Radiation Zone Map, Normal Operation, Section A-A..........21-821 Figure 12.3-42 Control Building, Radiation Zone, Normal Operation at Elevation -8200 mm......21-822 Figure 12.3-43 Control and Service Building, Radiation Zone, Normal Operation at Elevation -2150 mm ............................................................................................21-823 Figure 12.3-44 Control and Service Building, Radiation Zone, Normal Operation at Elevation 3500 mm .............................................................................................21-824 Figure 12.3-45 Control and Service Building, Radiation Zone, Normal Operation at Elevation 7900 mm .............................................................................................21-825 Figure 12.3-46 Control and Service Building, Radiation Zone, Normal Operation at Elevation 12300 mm ...........................................................................................21-826 Figure 12.3-47 Control and Service Building, Radiation Zone, Normal Operation at Elevation 17150 mm ...........................................................................................21-827 Figure 12.3-48 Control and Service Building, Radiation Zone, Normal Operation, Side View, Cross Section B-B ................................................................................21-828 Figure 12.3-49 Turbine Building, Radiation Zone at Elevation 5300 mm ......................................21-829 Figure 12.3-50 Turbine Building, Radiation Zone at Elevation 12300 mm ....................................21-830 Figure 12.3-51 Turbine Building, Radiation Zone at Elevation 20300 mm ....................................21-831 Figure 12.3-52 Turbine Building, Radiation Zone at Elevation 30300 mm ....................................21-832 Figure 12.3-53 Turbine Building, Radiation Zone at Normal Operation Longitudinal Section A-A.............................................................................................................21-833 Figure 12.3-54 Control and Service Building, Radiation Zone, Post LOCA, Section B-B.............21-834 Chapter 21 Figure TOC Volume 8-iii
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 List of Figures (Continued)
Figure 12.3-55 Turbine Building, Radiation Zone, Post LOCA, Longitudinal Section A-A..........21-835 Figure 12.3-56 Reactor Building, Area Radiation Monitors at Elevation -8200 mm......................21-836 Figure 12.3-57 Reactor Building, Area Radiation Monitors at Elevation -1700 mm......................21-837 Figure 12.3-58 Reactor Building, Area Radiation Monitors at Elevation 4800/8500 mm..............21-838 Figure 12.3-59 Reactor Building, Area Radiation Monitors at Elevation 12300 mm .....................21-839 Figure 12.3-60 Reactor Building, Area Radiation Monitors at Elevation 23500 mm .....................21-840 Figure 12.3-61 Reactor Building, Area Radiation Monitors at Elevation 27200 mm .....................21-841 Figure 12.3-62 Reactor Building, Area Radiation Monitors at Elevation 31700/38200 mm..........21-842 Figure 12.3-63 Reactor Building, Area Radiation Monitors, Section B-B......................................21-843 Figure 12.3-64 Control and Service Buildings, Area Radiation Monitors, Section B-B.................21-844 Figure 12.3-65 Radwaste Building, Area Radiation Monitors at Elevation -1500 mm ..................21-845 Figure 12.3-66 Radwaste Building, Area Radiation Monitors at Elevation 4800 mm....................21-846 Figure 12.3-67 Radwaste Building, Area Radiation Monitors at Elevation 12300 mm..................21-847 Figure 12.3-68 Radwaste Building, Area Radiation Monitors at Elevation 21000 mm..................21-848 Figure 12.3-70 Turbine Building, Area Radiation Monitors at Elevation 12300 mm.....................21-849 Figure 12.3-71 Turbine Building, Area Radiation Monitors at Elevation 20300 mm.....................21-850 Figure 12.3-72 Turbine Building, Area Radiation Monitors at Elevation 30300 mm.....................21-851 Figure 12.3-73 Turbine Building, Area Radiation Monitors, Longitudinal Section A-A ...............21-852 Figure 15B-3 Fine Motion Control Rod Drive ..............................................................................21-853 Figure 18C-5 Arrangement of Equipment of Main Control Console............................................21-854 Figure 18C-7 Fixed-Position Display............................................................................................21-855 Figure 20.3.4-5a Low Pressure Core Flooder Sparger (Sheet 1)........................................................21-856 Figure 20.3.4-5b Low Pressure Core Flooder Sparger (Sheet 2)........................................................21-857 Figure 20.3.4-5c High Pressure Core Flooder Sparger.......................................................................21-858 Volume 8-iv Chapter 21 Figure TOC
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-16 Control Building Fire Protection at Elevation 12300 mm 21-776
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-16a Control Building Fire Protection at Elevation 17150 mm 21-777
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-16b Control Building Fire Protection at Elevation 22200 mm 21-778
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-17 Turbine Building Fire Protection, Section A-A 21-779
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-18 Turbine Building Fire Protection at Elevation 5300 mm 21-780
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-19 Turbine Building Fire Protection at Elevation 12300 mm 21-781
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-20 Turbine Building Fire Protection at Elevation 20300 mm 21-782
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-21 Turbine Building Fire Protection at Elevation 30300 mm 21-783
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-28 Radwaste Building Fire Protection, Section A-A 21-784
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-29 Radwaste Building Fire Protection at Elevation -1500 mm 21-785
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-30 Radwaste Building Fire Protection at Elevation 4800 mm 21-786
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-31 Radwaste Building Fire Protection at Elevation 12300 mm 21-787
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 9A.4-32 Radwaste Building Fire Protection at Elevation 21000 mm 21-788
ABWR 25A5675BJ Revision 7 Design Control Document/Tier 2 Figure 10.1-2 Reference Heat Balance for Guaranteed Reactor Rating 21-789
ABWR 21-790 25A5675BJ Revision 7 Design Control Document/Tier 2 Figure 10.1-3 Reference Heat Balance for Valves-Wide-Open (VWO)
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 11.2-1 Radwaste System PFD 21-791
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 11.3-1 Offgas System PFD (Sheet 1 of 2)21-792
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 11.3-1 Offgas System PFD (Sheet 2 of 2)21-793
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 11.3-2 Offgas System P&ID (Sheet 1 of 3)21-794
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 11.3-2 Offgas System P&ID (Sheet 2 of 3)21-795
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 11.3-2 Offgas System P&ID (Sheet 3 of 3)21-796
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-1 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation -8200 mm (B3F)21-797
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-2 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation -1700 mm (B2F)21-798
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-3 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 4800/8500 mm (B1F)21-799
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-5 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 12300 mm (1F)21-800
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-6 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 18100 mm (2F)21-801
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-7 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 23500 mm (3F)21-802
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-8 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 27200 mm (3.5F)21-803
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-9 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation at Elevation 31700/38200 mm (4FM)21-804
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-10 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation, Section A-A 21-805
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-11 Reactor Building Radiation Zone Map for Full Power and Shutdown Operation, Section B-B 21-806
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-12 Reactor Building Radiation Zone Map Post LOCA at Elevation -8200 mm (B3F)21-807
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-13 Reactor Building Radiation Zone Map Post LOCA at Elevation -1700 mm (B2F)21-808
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-14 Reactor Building Radiation Zone Map Post LOCA at Elevation 4800/8500 mm (B1F)21-809
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-16 Reactor Building Radiation Zone Map Post LOCA at Elevation 12300 mm (1F)21-810
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-17 Reactor Building Radiation Zone Map Post LOCA at Elevation 18100 mm (2F)21-811
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-18 Reactor Building Radiation Zone Map Post LOCA at Elevation 23500 mm (3F)21-812
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-19 Reactor Building Radiation Zone Map Post LOCA at Elevation 27200 mm (3.5F)21-813
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-20 Reactor Building Radiation Zone Map Post LOCA at Elevation 31700/38200 mm (4FM)21-814
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-21 Reactor Building Radiation Zone Map Post LOCA, Section A-A 21-815
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-22 Reactor Building Radiation Zone Map Post LOCA, Section B-B 21-816
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-37 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation -1500 mm 21-817
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-38 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation -4800 mm 21-818
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-39 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation 12300 mm 21-819
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-40 Radwaste Building, Radiation Zone Map, Normal Operation at Elevation 21000 mm 21-820
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-41 Radwaste Building, Radiation Zone Map, Normal Operation, Section A-A 21-821
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-42 Control Building, Radiation Zone, Normal Operation at Elevation -8200 mm 21-822
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-43 Control and Service Building, Radiation Zone, Normal Operation at Elevation -2150 mm 21-823
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-44 Control and Service Building, Radiation Zone, Normal Operation at Elevation 3500 mm 21-824
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-45 Control and Service Building, Radiation Zone, Normal Operation at Elevation 7900 mm 21-825
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-46 Control and Service Building, Radiation Zone, Normal Operation at Elevation 12300 mm 21-826
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-47 Control and Service Building, Radiation Zone, Normal Operation at Elevation 17150 mm 21-827
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-48 Control and Service Building, Radiation Zone, Normal Operation, Side View, Cross Section B-B 21-828
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-49 Turbine Building, Radiation Zone at Elevation 5300 mm 21-829
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-50 Turbine Building, Radiation Zone at Elevation 12300 mm 21-830
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-51 Turbine Building, Radiation Zone at Elevation 20300 mm 21-831
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-52 Turbine Building, Radiation Zone at Elevation 30300 mm 21-832
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-53 Turbine Building, Radiation Zone at Normal Operation Longitudinal Section A-A 21-833
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-54 Control and Service Building, Radiation Zone, Post LOCA, Section B-B 21-834
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-55 Turbine Building, Radiation Zone, Post LOCA, Longitudinal Section A-A 21-835
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-56 Reactor Building, Area Radiation Monitors at Elevation -8200 mm 21-836
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-57 Reactor Building, Area Radiation Monitors at Elevation -1700 mm 21-837
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-58 Reactor Building, Area Radiation Monitors at Elevation 4800/8500 mm 21-838
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-59 Reactor Building, Area Radiation Monitors at Elevation 12300 mm 21-839
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-60 Reactor Building, Area Radiation Monitors at Elevation 23500 mm 21-840
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-61 Reactor Building, Area Radiation Monitors at Elevation 27200 mm 21-841
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-62 Reactor Building, Area Radiation Monitors at Elevation 31700/38200 mm 21-842
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-63 Reactor Building, Area Radiation Monitors, Section B-B 21-843
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-64 Control and Service Buildings, Area Radiation Monitors, Section B-B 21-844
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-65 Radwaste Building, Area Radiation Monitors at Elevation -1500 mm 21-845
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-66 Radwaste Building, Area Radiation Monitors at Elevation 4800 mm 21-846
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-67 Radwaste Building, Area Radiation Monitors at Elevation 12300 mm 21-847
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-68 Radwaste Building, Area Radiation Monitors at Elevation 21000 mm 21-848
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-70 Turbine Building, Area Radiation Monitors at Elevation 12300 mm 21-849
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-71 Turbine Building, Area Radiation Monitors at Elevation 20300 mm 21-850
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-72 Turbine Building, Area Radiation Monitors at Elevation 30300 mm 21-851
25A5675BJ Revision 7 Security-Sensitive Information ABWR Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 Figure 12.3-73 Turbine Building, Area Radiation Monitors, Longitudinal Section A-A 21-852
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 15B-3 Fine Motion Control Rod Drive 21-853
ABWR 21-854 25A5675BJ Revision 7 Design Control Document/Tier 2 Figure 18C-5 Arrangement of Equipment of Main Control Console
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 18C-7 Fixed-Position Display 21-855
ABWR 21-856 25A5675BJ Revision 7 Design Control Document/Tier 2 Figure 20.3.4-5a Low Pressure Core Flooder Sparger (Sheet 1)
ABWR 25A5675BJ Revision 7 Design Control Document/Tier 2 Figure 20.3.4-5b Low Pressure Core Flooder Sparger (Sheet 2)21-857
25A5675BJ Revision 7 ABWR Design Control Document/Tier 2 Figure 20.3.4-5c High Pressure Core Flooder Sparger 21-858